Access for disabled, 535-7 Barrel vaults, 10, 479-81


Access to sites, 82 Basement excavation, 242-5
Accommodation on sites, 83 Basement insulation, 254
Active earth pressures, 230 Basements, 242-54
Adhesives, 422 Basic forms and types of structure, 8,
Admixtures, 249 I1
Aerated concrete floor units, 584 Basic formwork, 387-91
Aggregate samples, 102 Basic module grid, 45
Air lock hopper, 21 1 Basic roof forms, 427-9
Air test, 658, 676 Basins, 671
Air tightness and permeability, 524 Batch mixers, 178-9
Alternating tread stair, 595 Baths, 672
Aluminium alloy infill panels, 495 Bay window, 349
Aluminium alloy windows, 356 Beam and pot floor, 585
Anchor bars, 378 Beam and slab raft, 207
Anchor straps, 460 Beam formwork, 388-9
Anchorages, 400 Beam to column connection, 395, 407
Angle piling, 277 Beam design:
Angledozers, 150 concrete, 379-80
Angles, 115, 403 steel, 41 1-3
Angles of repose, 241, 258 timber, 576-8
Apex hinges, 417 Beams, 378, 404-8, 423
Approved Documents, 51-2 Bearing piles, 209
Approved inspector, 54 Beech, 632
Apron cladding panels, 503 Benchmark, 66, 109, 113-4
Apron flashing, 700-1 Bending moment, 41 1, 415, 576
Arches, 332-4 Bentonite, 212, 286-7
Asphalt tanking, 251-2 Bib tap, 667
Attached piers, 304-5, 307 Binder, 624
Augers, 72 Binders, 378
Automatic level, 113 Binding, 138, 244
Average U value, 519, 528 Birdcage scaffold, 131
Axial grid, 46 Block plan, 27, 40
Axonometric projection, 24 Block walls, 545-7
Blockboard, 633
Bloom base, 206
Boarded web girder, 423
Backacter, 149, 156, 245 Bolection moulding, 630
Backgutter, 700-1 Bolt box, 393, 407
Backshore, 138 Bonding bricks, 302-6
Balloon frame, 372 Bonnet tiles, 437, 441
Balustrade, 14, 600-1, 606-10 Boot lintels, 335
Bar chart, 33 Bore hole, 67, 74
Bargeboard, 468 Borrowed light, 551

707
Index

Bottom shore, 138 Cantilever:


Box beam, 423 beam, 378
Box caisson, 269 foundations, 208
Box pile foundation, 219 retaining wall, 233
Braced structures, 425 scaffold, 133
Breather membrane, 436, 43940,490 stairs, 599
Brick: structures, 424
corbel, 312-3, 699, 701 Cap tendons, 398
dentil, 3 13 Carbon emissions, 523
dog-tooth, 313 Carbon index, 516, 521, 523
infill panels, 494 Cartridge fuse, 687
internal walls, 543 Cased pile foundation, 220
jointing and pointing, 309 Casein adhesive, 422
panel walls, 491 Casement windows:
plinths, 312 ironmongery, 344
purpose made, 31 1 metal, 343, 356
retaining walls, 228, 231, 237-8 timber, 341-2
specials, 3 10 Castellated beam, 405
strength, 330 Cast-in wall ties, 494
testing, 100 Cast insitu diaphragm walls, 247,
underpinning, 273 286
Brick bonding: Cast insitu pile foundation, 223
attached piers, 307 Cast-on finishes, 506
English bond, 304 Cavity barrier, 326, 373, 439
Flemish bond, 305 Cavity closer, 326, 438-9
principles, 303 Cavity tray, 334
special bonds, 237, 302, 306, 308 Cavity walls, 315-6, 329, 526
Brickwork cladding support, 492 Cedar, 631
Bridging of dpcs, 325 Ceilings:
British Standards, 57 plasterboard, 558, 619
Brown field, 295 suspended, 620-3
Buckling factor, 384 Cellular basement, 246
Builders plant, 147-83 Cement grouts, 288
Building control, 54 Central heating, 677-80
Building Regulations, 5 1-6 Centres, 333
Building Regulations application, 56 Certificates of ownership, 40, 44
Building Regulations exemptions, 55 Channel floor units, 585
Building surveyor, 28-30 Channels, 403-4
Built environment, 3-5 Checked rebates in walls, 338
Built-up roofing felt, 456 Chemical dpc, 323-4
Bulk density, 80 Chemical grouts, 288
Bulking of sand, 101 Chezy formula, 659
Bulldozer, 150 Chimney pot, 22, 699
Bus bar, 683-4 Chimneys, 695, 698, 700
Chipboard, 566, 634
Cab crane control, 173 Circular bay window, 349
Cable sizing, 687 Circular column, 382
Caissons, 269-70 CI/SfB system, 61
Calculated brickwork, 330-1 Cisterns, 668, 673
Calculation of storage space, 96 Cladding panels, 493
Camber arch, 333 Clamp vibrator, 182

708
Index

Classification of piled foundations, production, 261-6


209 pumps, 181
Clay cutter, 3 11 slab design, 379-80
Clear glass, 351 stairs, 598-606
Client, 48 surface finishes, 505
Climbing cranes, 172, 176 test cubes, 103
Climbing formwork, 235 testing, 104-6
Closed couple roof, 431 Concrete production:
Codes of Practice, 57 designated mix, 265
Cofferdams, 267-8 designed mix, 265
Coil wall ties, 234 materials, 26 1
Cold bridging, 326, 356, 527 prescribed mix, 265
Cold deck, 455 site storage, 262
Cold water installations, 662-3 specification, 265
Collar roof, 431 standard mix, 265
Column design, 383-4, 414 supply, 266
Column formwork, 390-1 volume batching, 263
Column to column connection, 394, weight batching, 264
408 Concreting, 177
Column underpinning, 278 Concreting plant, 177-83
Columns, 382, 4034,407-8 Conductivity, 51&1
Combined column foundation, 206 Conduit and fittings, 685-6
Combined method, 514 Conoid roof, 10, 481
Combustion air, 701 Consolidation of soil, 81
Communicating information: Construction activities, 19, 33
bar chart 33 Construction, Design and
elevations, 26 Management Regs., 48
floor plans, 26 Construction joints, 119, 250, 547
isometric projection, 24 Construction Products Directive, 59
orthographic projection, 23 Construction Regulations, 47-8
perspective projection, 25 Consumer control unit, 6 8 3 4 , 688-9
sketches, 22 Contaminated subsoil, 295-7
Complete excavation, 244 Contiguous piling, 285
Completion certificate, 3 1 Continuous column foundations, 205
Composite beams, 423 Contraction joints, 119
Composite boarding, 633-4 Controlling dimensions, 45
Composite floors, 377, 585 Controlling grid and lines, 45
Composite lintels, 335 Cooker circuit cable, 687
Composite panel, 495 Coping stones, 227-8, 3 17
Composite piled foundation, 220-1 Corbelled brickwork, 31 2-3, 699, 701
Compound sections, 404 Core drilling, 73
Compressed strawboard, 633 Core structures, 425
Compressible joints, 491, 547, 603-4 Cored floor units, 585
Concrete: Cor-ply beam, 423
admixtures, 249 Cornice, 630
beam design, 379-80 Corrugated sheet, 467-70
cladding, 490, 5 0 2 4 Coulombs line, 80
column design, 383-4 Coulombs wedge theory, 24 1
floor screed, 569-70 Counter batten, 440
mixers, 178-9 Couple roof, 431
placing, 182 Cove mouldings, 557, 619

709
Index

Cover flashing, 700 Documents for construction, 20


CPI System of Coding, 60 Dog leg stair, 596-7
Cracking in walls, 192 Dog toothed brickwork, 3 13
Cradles, 132 Domelights, 489
Crane operation, 173 Domes, 10,477-8
Crane rail track, 175 Domestic drainage, 650-3
Crane skips, 177 Domestic electrical installations,
Cranes, 165-76 68 1-9
Cranked slab stairs, 598, 604 Domestic floor finishes, 565-6
Crawler crane, 169 Domestic ground floors, 561-4
Creep, 397 Domestic heating systems, 677-80
Crib retaining wall, 237 Doors:
Crosswall construction, 370-1 external, 361-3
Crown hinges, 417 fire, 6 15-7
Curtain walling, 499-501 frames, 364, 614
Curved laminated timber, 421 glazed double swing, 6 I8
Curved tendons, 398 industrial, 366-9
Cut and fill, 65, 255 internal, 361, 61 2-3
Cylinders, 669 ironmongery, 365
linings, 61 I , 613
Dad0 panel and rail, 630 performance, 361
Damp proof course, 320-326 sliding, 366, 368
Damp proof course materials, 321-2 types, 362-3
Damp proof membrane, 320, 327 Door set, 614
Datum, 109-14 Dormer window, 429, 454
Datum post, 109, 11 1-3 Double acting hammers, 225
Dead loads, 34-5, 142, 199 Double action floor spring, 618
Dead shoring, 136-7, 142-3 Double flying shore, 140
Decorative suspended ceiling, 623 Double glazing, 342, 348, 353, 356
Deep basements, 247-8 Double hung sash windows, 345-6
Deep strip foundation, 205 Double lap tiling, 437-8, 441-2
Defects in painting, 627 Double layer grids, 477
Deflection, 413, 423, 578 Double rafter roof, 432
Demountable partitions, 551-2 Double swing doors, 618
Dense monolithic concrete, 249 Douglas fir, 631
Dentil course, 3 13 Dovetail anchor slots, 491, 494
Density of materials, 35, 510-1 Draft for Development, 57
Design of foundations, 197-9, 204 Draglines, 157
Designer, 48 Drainage:
Dewatering, 279-83 effluent, 639
Diaphragm floatvalve, 667 gradient, 656, 659
Diaphragm walls, 247, 286-7, 319 paved areas, 644
Diesel hammers, 225 pipe sizes, 659
Dimensional coordination, 46 proportional depth, 659
Dimensional grids, 46 roads, 645-6
Dipper arm, 245 simple, 650-7
Direct cold water system, 662 systems, 650-2
Direct hot water system, 664 testing, 658
Displacement pile foundation, 209, Drained cavities, 253
2 15-226 Draught proofing, 528
Disturbed soil sample, 68, 71 Drawings:

710
Index

axonometric projection, 24 oversite, 255


construction process, 21 pier holes, 256
hatching, symbols and notation, reduced level, 255
36-9 setting out, 109-10
isometric projection, 24 trench, 256
orthographic projection, 23 temporary support, 258-60
perspective projection, 25 Expansion joint, 119, 250, 480, 492,
plans and elevations, 26 547, 565
sketches, 22 Exposed aggregate, 506
Drilling rigs, 21 1-4 External asphalt tanking, 251
Driven insitu piled foundations, 222 External doors, 361-3
Drop arch, 333 External envelope, 18, 301
Drop hammer, 21 1, 217, 220-2, 224 External escape stairs, 607
Dry linings, 555-7
Dry rot, 463-4 Facade bracing, 124
Dumpers, 160, 180 Face grid, 46
Dumpling, 243 Face shovel, 155, 245
Dynamic compaction, 290, 292 Facings to panel walls, 493
Factories Acts, 47
Earth pressures, 230, 240 Fencing, 83-4, 94
Earthworks for roads, 117 Festoon lighting, 90
Eaves: Fibreboard, 634
closure piece, 468-9 Finger joints, 419
details, 438-40, 444-5, 524 Finishes, 15
filler piece, 468-9 Fin walls, 318
ventilation, 439, 445, 458-9 Fire back, 697, 701
Effective height of walls, 331 Fire doors, 6 15-7
Effective length of columns, 414 Fire protection of steelwork, 409-10
Effective thickness of walls, 329, 331 Fire resistance of steelwork, 409
Effluents, 639 Fire resisting doors, 617
Electrical cables, 685 Fire stops and seals, 694
Electrical installations, 684-9 Fireplaces and flues, 695-703
Electrical site lighting, 88-91 Fish plates, 408
Electricity: Fixed portal frame, 415-6, 418
domestic supply, 68 1-3 Flashings, 317, 442, 453, 456, 700
supply to sites, 91 Flat roofs, 451-6
Elemental method, 516-8, 522 Flat sawn timber, 420
Elevations, 26 Flat slabs, 579
End bearing pile foundation, 209 Flat top girder, 471, 474
Energy efficiency, 5 16 Flemish bond, 305
Energy roof system, 470 Flexible paving, 117
English bond, 304 Flitch beam, 423
Environment, 3-5 Float valves, 667
Equivalent area, 383-4 Floating floor, 533
Espagnolette, 348 Floating pile foundation, 209
European spruce, 63 1 Floor plans, 26, 39
European Standards, 58 Floor springs, 618
Excavating machines, 154-8, 245 Floors:
Excavations: domestic ground, 561-4
basement, 242-5 finishes, 565-6
dewatering, 279-8 fixings, 583

711
Index

flat slab, 579, 582 Frodingham sheet pile, 268


hollow pot, 582-3 Full height casting, 235
insitu RC suspended, 579-83 Fungicide, 464
large cast insitu, 567-8 Furniture beetle, 461
precast concrete, 584-6
ribbed, 580 Gambrel roof, 429, 435
screeds, 569-70 Gantry crane, 170
sound insulation, 533-4 Gantry girder, 404
suspended timber ground, 561, 563 Gantry scaffolding, 135
suspended timber upper, 57 1-6 Garden wall bonds, 306
waffle, 581 Gas:
Flue blocks, 693, 703 fires, 692
Flue lining, 697-702 flues, 693, 703
Flush bored pile foundation, 209 service intake, 690-1
Fly jib, 168-9 supply, 690
Flying shore, 136, 139-41 Gas resistant membranes, 327-8
Folded plate construction, 9 Gate valve, 667-8
Footpaths, 120 Gauge box, 263
Forklift truck, 161 Geodistic dome, 477
Formwork: Girders, 404, 473-4, 471
beams, 388-9 Glass and glazing, 351-8
columns, 390-1 Glass block wall, 359-60
principles, 387 Glazed cladding, 498
slab, 376 Gluelam, 4 19-2 1
stairs, 602 Grab bucket, 157
Foundation hinges, 4 17 Graders, 152
Foundations: Granular soil shell, 21 1
basic sizing, 197 Green field, 295
beds, 196 Grillage foundation, 206
calculated sizing, 199 Groins, 481
defects, 189-90, 192 Ground anchors, 247, 287, 402
functions, 187 Ground freezing, 289
grillage, 206 Ground vibration, 291-2
isolated, 206 Ground water, 279
piled, 209-226 Ground water control, 280-9
raft, 203 Grouting - subsoil, 288
short bored piled, 202, 209-11 Grouting - tiles, 560
simple reinforced, 201 Guard rail, 125-7, 129-30, 133-4
stepped, 200 Gusset plate, 418, 466, 469
strip width guide, 198
subsoil movement, 188-90, 192 Half hour fire door, 615
types, 204-8 Hammer head junction, 116
Four-in-one bucket, 153 Hand auger, 72
Four wheeled grader, 152 Hand auger holes, 67
Framed structures, 378, 382, 407-8, Handrail, 6 10
424 Hardwoods, 632
Freyssinet anchorage, 400 Health and Safety at Work, etc. Act,
Friction hinge, 348 47,49
Friction piling, 209 Hearths, 696-7, 701
Frieze, 630 Helical binding, 382
Frodingham box pile, 219 Helical stairs, 600

712
Index

Helmets, 217, 221 functions, 542


Hemispherical dome, 478 plaster finish, 553-4
Herringbone strutting, 572 plasterboard lining, 555-8
High performance window, 342 types, 543
Highway dumpers, 160 International Standards, 58
Hinge or pin joints, 417 Intumescent collar, 694
Hip tiles, 437, 441 Intumescent strips, 61 5-7
Hoardings, 83-7 Inverted warm deck, 455
Hoists, 162-3 Iroko, 632
Holding down bolts, 393, 407 Ironmongery, 344, 365
Hollow box floor units, 584 Isolated foundations, 195, 2
Hollow pot floor, 582-3 Isometric projection, 24
Hollow sections, 403
Horizontal shore, 139-41 Jack pile underpinning, 274
Horizontal sliding sash window, 347 Jambs, 336, 338
Hot water: Jarrah, 632
cylinders, 669 Jet grouting, 288, 290, 294
direct system, 664 Jetted sumps, 281
expansion vessel, 666 Jetted well points, 282-3
heating systems, 677-80 Joinery production, 628-32
indirect system, 665 Joinery timbers, 63 1-2
mains fed, 666 Jointing and pointing, 309
House Longhorn beetle, 461 Jointless suspended ceiling, 62 1
Hull core structures, 425 Joints:
Hyperbolic paraboloid roof, 10, basements, 250
482-3 blockwork, 547
drainage, 657
Immersion heater cable, 687 laminated timber, 419
Inclined slab stair, 598, 601 portal frame, 416-8
Independent scaffold, 126 roads, 119
Indirect cold water system, 663 Joists:
Indirect cylinder, 669 timber, 561, 563, 571-6
Indirect hot water system, 665 steel, 403-5
Industrial doors, 366-9 Joist sizing - timber, 576-8
Infill panel walls, 493-6 Joist sizing - steel, 41 1-3
Inspection chambers, 639, 645, 650-6
Insulating dpc, 326 Kerbs, 121
Insulation of basements, 254 Kelly bar, 2 12-4
Insulation - sound, 530-4 Kentledge, 278
Insulation - thermal, 507-26 Kitemark, 57
Integrity, 615, 617
Interest on capital outlay costing, 148 Ladders, 125-6, 129
Internal asphalt tanking, 252 Laminated timber, 419-21
Internal doors, 361, 61 1-7 Land caissons, 269
Internal drop hammer, 21 1, 220, 222 Land reclamation, 295
Internal elements, 541 Landings, 596-608
Internal environment, 3 Lantern lights, 488
Internal partitions, 548-52 Large diameter piled foundations,
Internal walls: 210, 214
block, 545-7 Larssen sheet piling, 268
brick, 544 Latent defects, 28

713
Index
Lateral restraint, 460, 571, 573-4 Mechanical auger, 72
Lateral support - basements, 248 Meeting rails, 345-6
Lateral support - walls, 434, 460, 573 Meeting stiles, 347, 618
Lattice beam, 406, 423, 473-4 Metal casement windows, 343
Lattice girder, 406 Metal section decking, 377
Lattice jib crane, 168 Metal stairs, 607-9
Leader - piling rig, 217 Meter box, 681-3, 690-1
Lean-to roof, 431 Methane, 327
Lens light, 488 Method statement, 32
Levelling, 1 1 2 4 Micro-bore heating, 679
Lift casting, 235 Middle shore, 138
Lighting: Middle third rule, 228
cable, 687 Mineral insulating cable, 685
circuits, 688-9 Miniature circuit breaker, 683-4
sites, 88-90 Mixing concrete, 177
Lightweight decking, 476 Mobile cranes, 165
Lightweight infill panels, 493, 495-6 Mobile scaffold, 129
Lintels, 332, 335-8 Modular coordination, 45-6
Litzka beam, 405 Modular ratio, 383
Load-bearing concrete panels, 502 Mohrs circle, 80
Load-bearing partitions, 548 Moment of resistance, 143, 41 1
Load-bearing internal walls, 541, Monitor roof, 47 1, 473
543-5 Monogroup cable, 397
Locating services, 108 Monolithic caissons, 269
Loft hatch, 529 Monostrand anchorage, 400
Long span roofs, 471-6 Monostrand cable, 397
Loop ties, 236 Mortar strength, 330
Lorries, 159 Morticing machine, 628
Lorry mounted cranes, 167-8 Movement joint, 119, 492, 547, 604
Low emissivity glass, 355 Mud-rotary drilling, 73
Luffing jib, 171 Multi-purpose excavators, 154, 158
Multi-span portal frames, 416, 418
Maguires rule, 659 Multi-stage wellpoints, 283
Mahogany, 632 Multi-storey structures, 424-5
Main beams, 8, 17, 408
Mandrel, 221 Needle and pile underpinning, 275
Manometer, 658, 676 Needle design, 142-3
Mansard roof, 429, 435 Needles, 136-41
Masonry partitions, 548 Newel post, 588, 5914, 596-7
Mass concrete retaining wall, 232 NHBC, 28
Mass retaining walls, 23 1-2 Non-load-bearing partitions, 541-4,
Mast cranes, 171 548-52
Mastic asphalt tanking, 251-2 Northlight barrel vault, 481
Mastic asphalt to flat roofs, 456 Northlight roofs, 471-2
Materials:
conductivity, 510-1 Oak, 632
density, 35, 510-1 Oedometer, 8 1
hoist, 162 Oil based paint, 624
storage, 94-9 One hour fire door, 616
testing, 1 0 M One pipe heating, 677
weights, 34-5 Open caissons, 269

714
Index

Open excavations, 242 doors, 361


Open fireplaces, 695-703 roofs, 426
Open riser stairs, 593-5, 605 windows, 339
Open suspended ceiling, 623 Perimeter trench excavation, 243
Open web beam, 405 Permanent exclusion of water, 279,
Openings in walls: 284-8
arches, 332-4 Permanent formwork, 377
heads, 335, 338 Permitted development, 40
jambs, 336, 338 Perspective drawing, 25
sills, 337-8 Phenol formaldehyde, 422, 635
support, 332 Pigment, 624
threshold, 338, 535 Pile:
Oriel window, 349 beams, 226
Oriented strand board, 634 caps, 21 3, 226
Orthographic projection, 23 classification, 209
Out-of-service crane condition, 172 testing, 226
Output and cycle times, 149 types, 210
Overcladding, 497 Piled basements, 246
Overhead and forklift trucks, 161 Piled foundations, 209-26
Piling:
Pad foundation, 195, 206, 382, 407, contiguous, 285
416, 418 hammers, 224-5
Pad foundation design, 197 helmets, 217, 221
Pad template, 111 rigs, 217, 220-1
Paint defects, 627 steel sheet, 267-8
Paints and painting, 624-6 Pillar tap, 667
Panelled suspended ceiling, 620, 622 Pin or hinge joint, 417
Parallel lay cable, 397 Pitch pine, 631
Parane pine, 631 Pitched roofs, 428-35
Parapet wall, 3 17 Pitched trusses, 471-2
Partially preformed pile, 221 Pivot window, 348
Particle board, 566, 634 Placing concrete, 177
Partitions: Plain tiles and tiling, 437-8, 441-2
demountable, 551-2 Planer, 628
load-bearing, 548 Plank and pot floor, 585
metal stud, 550 Planning application, 40-4
non-load-bearing, 548-52 Planning grid, 45
timber stud, 549 Planning supervisor, 48
Passenger hoist, 163 Plant:
Passenger vehicles, 159 bulldozer, 150
Passive earth pressures, 230 concreting, 177-82
Patent glazing, 472-3, 486-7 considerations, 147
Patent scaffolding, 130 costing, 148
Paved areas, 644 cranes, 165-76
Paving, 1 17, 120, 122 dumpers, 160, 180
Paving flags, 122 excavators, 154-8, 245
Pedestal, 587 forklift trucks, 161
Pendentive dome, 10,478 graders, 152
Penetration test, 77, 105 hoists, 162-3
Percussion bored piling, 210-1 scrapers, 15I
Performance requirements: tractor shovel, 153

715
Index

transport vehicles, 159-61 Purpose designed excavators, 154


Plaster cove, 557, 661 Purpose made joinery, 628
Plaster finish, 554 Putlog scaffold, 125
Plasterboard, 5 10, 555-8 Putty, 352
Plasterboard ceiling, 438, 444-5, 515, Pynford stool underpinning, 276
533-4, 619
Plasterboard dry lining, 555-7 Quarter sawn timber, 420
Plasters, 553 Quetta bond, 237
Platform floor, 534
Platform frame, 372 Radiators, 677-80
Plinths, 312 Radius of gyration, 414
Plug wiring, 687 Radon, 327
Plywood, 633 Raft basements, 246
Pneumatic caisson, 270 Raft foundations, 203, 207
Poker vibrator, 182 Rail tracks for cranes, 175
Poling boards, 260 Rainscreen cladding, 493, 497
Polyurethane paint, 624 Rainwater drainage, 649
Portal frames, 415-8, 421 Rainwater installations, 647-8
Portsmouth float valve, 667 Raised access floor, 587
Post-tensioned retaining wall, 238 Raking shore, 138, 141
Post-tensioning, 238, 399-400 Raking struts, 139-40, 244
Power circuit, 688 Rankines formula, 240
Power float, 183 Rat trap bond, 306
Precast concrete: Ready mixed concrete, 266
diaphragm wall, 287 Ready mixed concrete truck, 180
floors, 564, 584-6 Redwood, 631
frames, 392-5 Reinforced concrete:
portal frames, 416 beams, 378-80
stairs, 603-6 column design, 383-4
Preformed concrete pile, 2 17-8 columns, 382-4
Preservative treatment, 422, 462, 464 floors, 579-82
Pressed steel lintels, 335 formwork, 376, 387-91, 602
Pressure bulbs, 69-70 foundations, 201-3
Prestressed concrete, 396-402 pile caps and beams, 226
Pretensioning, 398 raft foundation, 203, 207
Primary elements, 13 reinforcement, 376-86
Primatic cylinder, 669 retaining walls, 233
Principal contractor, 48 slabs, 374-6
Profile boards, 110-1 stairs, 599-602
Profiled surface, 122, 505, 536 strip foundations, 201, 205
Programme of work, 33 Reinforced masonry, 237-8, 308
Programmer/controller, 680 Reinforcement:
Prop design, 143 bar coding, 385
Proportional area method, 513, 5 15 bar schedule, 386
Propped structures, 424 grip length, 381
Protection orders, 107 Remedial dpc, 322-4
Public utility services, 108 Remote crane control, 173
Published Document, 57 Rendhex box pile, 219
Pump sizing, 280 Replacement piling, 209-1 0
Purlin fixings, 468 Residual current device, 684
Purlin roof, 432 Resin grout, 288

716
Index

Resorcinol formaldehyde, 422, 633 thermal insulation, 5 15, 5 17-8,


Restraint straps, 460, 571, 573 521-4
Retaining walls, 227-41 tiling, 437-8, 441-5
Retaining walls - design, 240-1 timber flat, 427, 451-6
Retro-ties and studs, 574 timber pitched, 428-35
Reversing drum mixer, 179 trussed rafter, 434
Ribbed floor, 581-3 trusses, 433, 465
Rider, 141 underlay, 436
Ridge detail, 438-9, 444-5 ventilation, 457-9
Ridge piece, 468-9 Rooflights, 486-9
Ridge roll, 450 Room sealed appliance, 692
Ridge tiles, 438-9, 441, 444-5 Rotary bored piling, 210, 213-4
Ridge vent, 438, 444, 457-8 Rotational dome, 10, 478
Rigid pavings, 118 Rubble chutes and skips, 164
Rigid portal frames, 415-6, 418 Runners, 260
Ring main wiring, 688
Roads: Saddle vault, 482
construction, 116-9 Safe bearing, 198-9, 578
drainage, 645-6 Safety signs, 49-50, 123
earthworks, 1 17 Sampling shells, 72
edgings, 121 Sand bulking test, 101
footpaths, 120 Sand compaction, 292
forms, 118 Sand pugging, 534
gullies, 644-6 Sanitary fittings:
joints, 119 basin, 671
kerbs, 121 bath, 672
landscaping, 123 discharge systems, 674-5
pavings, 122 shower, 672
services, 123 sink, 671
setting out, 116 WC pan,673
signs, 123 Sanitation systems, 674-6
Rolled steel joist, 403 Sanitation system testing, 676
Roll over crane skip, 177 Sapele, 632
Roller shutters, 366, 369 Sash weights, 345
Roofs and roof covering: Saws, 628
basic forms, 427-9 Scaffolding:
built-up felt, 452-3 birdcage, 131
flat top girder, 471, 474 boards, 125-7
long span, 471-6 cantilever, 133
mastic asphalt, 456 component parts, 124
monitor, 471, 473 gantry, 135
northlight, 471-2 independent, 126
performance, 426 ladders, 125-6, 129
sheet coverings, 467-70 mobile, 129
shells, 477-85 patent, 130
slating, 445-9 putlog, 125
space deck, 476 slung, 131
space frame, 477 suspended, 132
surface water removal, 642-3, truss-out, 134
647-8 tying-in, 128
thatching, 450 working platform, 127

717
Index

Scarf joint, 419 Single flying shore, 139


Scrapers, 151 Single lap tiles and tiling, 443-4
Screed, 556-9 Single span portal frames, 415-6, 418
Secondary beams, 8, 17, 408 Single stack drainage, 674
Secondary elements, 14 Sink, 671
Secondary glazing, 354 Site:
Section factor, 410 construction activities, 19
Section modulus, 143, 411 electrical supply, 91
SEDBUK, 517, 520 health and welfare, 93
Segmental arch, 333 investigations, 66, 68, 290
Self propelled crane, 166 layout, 82-4
Self supporting static crane, 172-3 lighting, 88-90
Services fire stops and seals, 694 materials testing, 100-6
Setting out: offices, 83-4, 92, 97
angles, 115 plan, 27, 40
bases, 111 security, 83, 85
basic outline, 109 setting out, 109-15
drainage, 657 soil investigations, 67-73
grids, 111 storage, 94-9
levelling, 1 1 3 4 Six wheeled grader, 152
reduced levels, 112 Sketches, 22
roads, 116 Skimmer, 154
theodolite, 11 1, 115 Skips, 164
trenches, 110 Slates and slating, 445-9
Shear, 378, 412, 578 Slenderness ratio, 143, 331
Shear bars, 378 Sliding doors, 366-8
Shear box, 81 Sliding sash windows, 345-7
Shear leg rig, 72-3, 211 Slump test, 103
Shear plate connector, 475 Slung scaffold, 131
Shear strength of soils, 80-1 Small diameter piled foundation,
Shear wall structures, 425 210-3
Sheathed cables, 685 Smoke seal, 617
Sheet coverings, 467-70 Smoke test, 676
Shell roofs, 477-85 Soakaway, 649
Shoring, 136-43 Soakers, 442,448, 700
Short bored pile foundation, 202 Socket outlets, 687-8
Shower, 672 Softwoods, 63 1
Shutters, 369 Soil:
Sight rails, 111-2, 116, 657 assessment, 75-81
Sills, 337-8, 341-3 classification, 75-7, 198
Silt test for sand, 102 improvement, 2 9 0 4
Simple drainage: investigation, 67-73, 290
bedding, 657 particle size, 75
inspection chambers, 650-6 samples, 68
jointing, 657 stabilization, 2 9 0 4
roads, 645-6 testing, 75-81
setting out, 657 Solid block walls, 314
systems, 650-3 Solid brick walls, 302
Simply supported RC slabs, 374-6 Solid slab raft, 207
Single acting hammer, 224 Sound insulating:
Single barrel vault, 479 floors, 533-4

718
Index

walls, 531-2 Straight line costing, 148


Sound insulation, 530-4 Straight mast forklift truck, 161
Sound reduction, 353, 530 Strand, 397
Space deck, 11, 476 Stress reduction in walls, 331
Space frame, 11, 477 String beam stair, 598
Spindle moulder, 628 Strip foundations, 194, 197-9
Spine beam stairs, 605 Stripboard, 633
Splice joint, 418 Structural grid, 45
Splicing collar, 217-8 Structure:
Split barrel sampler, 77 basic forms, 8-1 1
Split load consumer unit, 684 basic types, 6-7
Split ring connector, 475 functions, 16-17
Stack bond, 308 protection orders, 107
Stairs: Strutting of floors, 572
alternating tread, 595 Stud partitions, 549-50
balusters, 588-9, 591-4, 597, 600-1 Subsoil:
balustrade, 14, 600-1, 606-10 drainage, 640-1
formwork, 602 movements, 188-91
handrail, 588-9, 591, 593, 595-7, water, 279
600-1, 606-8, 610 Substructure, 12
insitu RC, 598-602 Sump pumping, 280
metal, 607-9 Supply and storage of concrete, 177
open riser, 593-4 Supported static tower crane, 171, 174
precast concrete, 603-6 Surcharging, 290
timber, 588-97 Surface water, 279, 639, 642-6
Standard Assessment Procedure, 516 Surface water removal, 642-4
Standard dumper, 160 Survey:
Standard crane skip, 177 defects, 28-31, 192
Steel: site, 65-6, 68, 290, 295
beam, 403-4 structure, 28-3 1
beam design, 41 1-3 thermographic, 524
column, 403-4 Suspended ceilings, 620-3
column design, 414 Suspended scaffold, 132
compound sections, 404 Suspended structures, 424
gantry girder, 404 Swivel skip dumper, 160
lattice beams, 406
portal frames, 418 Tactile pavings, 122
roof trusses, 465-6 Tamping board vibrator, 182
screw pile, 219 Target U value, 516, 519-20, 528
sheet piling, 267-8 Teak, 632
standard sections, 403 Telephone installation, 704-5
string stairs, 609 Telescopic boom forklift truck, 161
tube pile, 220 Telescopic crane, 167
Stepped barrel vault, 481 Temporary bench mark, 109, 111-3
Stepped flashing, 442, 700 Temporary exclusion of water, 279-83
Stepped foundation, 200 Temporary services, 83
Stock holding policy, 97 Tendons, 397
Stop valve, 667-8 Tenoning machine, 628
Storage of materials, 84, 93, 99 Test cubes, 103
Storey height cladding, 504 Testing of materials, 100-6
Straight flight stairs, 588-92 Textured surfaces, 505

719
Index

Thatched roof, 450 Trees - foundation damage, 189-90


Theodolite, 109, 115 Tremie pipe, 212, 286
Thermal break, 356 Trench fill foundation, 205
Thermal bridging, 527-8 Trench setting out, 110
Thermal conductivity, 508, 510-3, 515 Trench sheeting, 267-8
Thermal insulation, 507-25 Trial pits, 67, 71
Thermal resistance, 507-9, 513, 5 15 Triangle of forces, 228
Thin grouted membranes, 284 Triangular chart, 76
Thinners, 624 Triaxial compression test, 80
Three axle scraper, 151 Tripod rig, 72-3, 21 1
Three centre arch, 333 Truss out scaffold, 134
Three pin portal frame, 415 Trussed rafter roof, 434
Tile hanging, 490 Tubular scaffolding, 124-35
Tilting drum mixer, 178-9 Two axle scraper, 151
Tilting level, 113 Two pin portal frame, 4 15
Timber: Two pipe heating, 678
beam design, 576-8 Tying-in scaffolding, 128
casement windows, 341-2
connectors, 433, 475 U value calculations, 507-8, 512-5
doors, 361-3, 367-8 U values, 355, 470, 507-8, 512-5
flat roofs, 45 1-6 Unconfined compression test, 79
frame construction, 372-3 Undercoat, 625
girders, 474 Underlay, 436, 438-42, 444-6, 448-9
hardwoods, 632 Underpinning, 27 1-8
joinery production, 628-32 Under-reaming, 214
pile foundation, 216 Undersill cladding panels, 503
pitched roofs, 430-50 Universal beam, 403
preservation, 461-2, 464 Universal bearing pile, 219
softwoods, 63 1 Universal column, 403
stairs, 588-97 Universal excavator, 154
storage, 99 Urea formaldehyde, 422, 635
stud partition, 549
trestle, 220 Vacuum dewatering, 568
Timbering, 258-60 Valley beam, 472
Tooled surface, 505 Valley gutter, 472
Toothed plate connector, 433, 474-5 Valley tiles, 437, 441
Top shore, 138, 141 Vane test, 78
Towed scraper, 151 Vans, 159
Tower cranes, 90, 165, 172-5 Vapour control layer, 455, 457, 470,
Tower scaffold, 129 473, 558, 619
Track mounted crane, 175 Vaults, 479-8 1
Tractor shovel, 153 Ventilated stack discharge system, 675
Traditional strip foundation, 194 Ventilation of roof space, 436,
Traditional underpinning, 273 438-40, 444-5, 452-3, 457-9
Translational dome, 10, 478 Ventilation spacer, 438, 444-5
Translucent glass, 351 Verge details, 442, 453
Transport vehicles, 159 Vertical casting, 506
Transporting concrete, 180 Vertical laminations, 420
Traveller, 110-2, 657 Vestibule frame, 357
Travelling tower crane, 172, 175 Vibrating tamping beam, 182
Tree protection, 97, 107, 191 Vibration of soil, 290-2
Index

Vibro cast insitu piling, 223 supply, 660-1


Volume batching, 263 Water jetting, 281-3, 292
Water table, 74, 279
Wall hooks, 138, 141 Water test, 659
Wall plates, 138-41, 432-5, 438, 445, Waterproofing basements, 249-53
450,452, 456,460 Weatherboarding, 490
Wall profiles, 546 Web cleats, 407-8
Wallboard, 557-8 Weep holes, 227-33
Walls: Weight batching, 264
cavity, 315-6, 329, 526 Weights of materials, 34-5
curtain, 499-501 Wellpoint systems, 282-3
diaphragm, 247, 286-7, 319 Western hemlock, 63 1
design strength, 330 Western red cedar, 631
diaphragm, 247, 286-7, 319 Wet rot, 463-4
fin, 318 Windows:
formwork, 234-6 aluminium casement, 356
glass block, 359-60 bay, 349
infill panel, 493-6 double glazing, 342, 348, 353
internal, 541-52 glass and glazing, 351-8
openings, 332-8 high performance, 342
panelling, 630 ironmongery, 344
remedial work, 574 metal casement, 343
retaining, 227-41 oriel, 349
rising dampness, 322-5 performance requirements, 339
slenderness ratio, 143, 33 1 pivot, 340, 348
solid block, 314, 545, 547 schedules, 350
solid brick, 302-7, 544 sliding sash, 345-7
sound insulation, 530-2 timber casement, 341-2
thermal insulation, 508-9, 513-4, types, 340
517-9, 522-3, 526 Wired glass, 351
thickness, 329, 331 Wiring systems, 686-9
tiling, 490, 559-60 Wood cement board, 634
underpinning, 272-7 Wood rot, 464
waterproofing, 249-53 Wood wool, 634
Warm deck, 455 Woodworm, 46 1
Wash boring, 73 Woodworking machinery, 628
Water bar, 250-4, 364 Working platform, 127
Water based paint, 624 Wrought iron dogs, 137, 139-40
Waterlcement ratio, 249, 264
Water closet pan, 673 Yokes, 391
Water installations:
cisterns, 668, 673 Zed beam, 468, 470
cold, 662-3 Zipper bond, 302
hot, 664-6 Zones, 46
pipe joints, 670 Zurich Insurance, 28

721
The must-have guide to buildingconstruction I
0 Topics presented i n a highly visual and easy t o understand layout I
0 Idealfor students on general constructionand building courses

0 Updated in line with the latest revised Building Regulations

0 New website resourcesavailable

Building Construction Handbook summarises all elements of building construction practice, techniques, i
1,
componentsand procedures. Informationis presented concisely, in a highly illustratedand accessible style. ,
This is an essential text for all building construction students up to, and including, undergraduate level.
It is an ideal resource for a wide range of courses including: BTEC National, HNC/HND, and Level 3/4
NVQs. The comprehensive coverage and numerous references to the latest Building Regulations,
Water Supply Regulations, British and European Standards also makes this book an invaluable
resourcefor construction professionals. 11

The fifth edition consolidates recent amendments to the Building Regulations, including: Part A - I
/I
Structure; Part C - Site preparation and resistance to moisture; Part E - Resistanceto the passage of sound;
Part L - Conservation offuel and power; and Part M - Access to and use of buildings. The new edition also
addresses the new governmental requirements for property sellers information packs, including property
condition surveys, structural defects and remedial measures. Reference to supplementary regulationsand
standards are provided for further reading and new online lecture resources feature power point ,
slides with essential illustrations for use with presentations and handouts.

Roger Greeno is a well-known author of construction texts. He has extensive practical and
consultancy experience in the industry, in addition to lecturing at Guildford College and the
University of Portsmouth. He also examines for City and Guilds, Edexcel and the Chartered
Institute of Building.
Roy Chudleys books on Building Construction have helped many thousands of students gain
their qualifications and pass exams. He was formerly a Senior Lecturer at Guildford College.

The student who memorisesthe Building Construction Handbook will be well informed indeed.
/
NEW CIVIL ENGINEER NEW BUILDER

Pages ofclear diagrams and brieftext packedfull oftap tips and typical details. BUILDING DESIGN

Covers all the important aspects of construction technology while also detailing important
elements ofstructural design. RlBA JOURNAL
BuildingServices ;
Handbook I
j,

SECOND EDITION
It will be useful to selfbuilders who really want to get under the skin ofhouse construction and F. Hall & R. Greeno
who perhaps plan to project manage the build themselves. BUILD IT 0 7506 6143 7

Online resources available at


http://books.elsevier.com/manualsprotected/o~~o66ig68

http://books.elsevier.com

You might also like