COMACOE

FIELD INSPECTION AND TEST PLAN FOR HDPE PIPE WELDING


CUSTOMER : GAYATRI PROJECTS OWNER:THERMAL POWER TECH FITP NO :
LIMITED CORPORATION INDIA LTD QAPC/CM110809060104
PROJECT : 2X660 MW TPCIL REV.NO : 03
PH# 1, 2X660 MW, Thermal Power Plant at Krishnapatnam, Andhra Pradesh, India DATE : 08.12.2011
PACKAGE/SYSTEM : SWIO HDPE PIPE WELDING.
DESCRIPTION
EXTE
OF TYPE/ REFERENCE FORMA
SL.N CHARACTERISTIC NT OF ACCEPTAN COMAC GP TPC
ITEM/OPERATI METHOD DOCUMENT T OF REMARKS
O S CHEC CE NORMS OE L IL
ON OF CHECK S RECORD
K
/STAGE
1. HDPE Pipes & Surface finish of Visual & 100% ISO 4427 & Cuts and Inspectio P W W
fittings incoming pipes& fittings at Measureme specification transportati n report
inspection the stock yard on nt on damages
receipt from not more
supplier than 10% of
wall
thickness.
2. Trial welding Drag Force, Recording 100% Manufacture Adherence Weld log p W W Comparison
temperatures, time of weld rs catalogue, to welding sheet data logger &
periods, welding parameters Preliminary parameter manual
pressure WPS ranges. recording of
parameters.
3. Production
Welding of Pipe
to Pipe and Pipe
to stub end
. a Ovality adjustment measureme 100% Inspection Shall Not Manual p W RW Field
prior to welding nt report more than Weld log observation.
10% of
wall
thickness
b Drag force Not more Weld Log P W RW
Approved than of sheet &
Visual & trail welding welding Inspectio
Page 1 of 2
COMACOE GPL-EPC-PP
TPCIL

Page 2 of 2