You are on page 1of 2

Inspection and Test Plans (ITP) MUM-16

Duct Work Insulation Installation Checklist

Client: Project Name: Project No:

Area: Drawing Nos: Date: Sheet: 1 of 2

Check Conducted By: Signature: Check Approved By: Signature:

INSPECTION CHECKLIST FOR: DUCTWORK INSULATION


The below checks are to be completed by the Mechanical Contractor prior to start-up of fan or FCU system

INSPECTION HISTORY
NO: DESCRIPTION: INSPECTION:
ACCEPTABLE: DATE: COMMENTS:
Quality Control
Insulation material approved for use
1 Yes No Yes No
Fixing methods of insulation approved for installation
2 Yes No Yes No
All insulation not being used is correctly stored
3 Yes No Yes No

Installation
Drawings on site are the latest issue
4 Yes No Yes No
Duct work to be insulated is free of damage
5 Yes No Yes No
Confirm duct work is free from rust, debris is dry and
6 is free from damage prior to commencing insulation Yes No Yes No
installation
Confirm insulation arranged so that it can be readily
7 Yes No Yes No
removed and refitted for serviceable items
Confirm access doors are insulated to match the
8 Yes No Yes No
adjacent thermal/acoustic insulation standard
Confirm >300mm overlap of insulation from internal
9 and external insulation on the same duct to avoid a Yes No Yes No
thermal gap
10 Confirm duct tape used >70mm wide and applied to Yes No Yes No

1
dry duct free surfaces with an overlap of tape to
ensure a continuous vapour barrier on the insulation
Confirm where pins with speed clips are used that any
11 Yes No Yes No
excess length of pins are cut off
Mark alterations, sizes and location on As Built
16 Yes No Yes No
drawings for record purposes

ADDITIONAL COMMENTS: