EHS RISK ASSESSMENT

ACTIVITY: REPAIRING THE DAMAGED LV CABLE AT SEA WATER INTAKE AREA (BACK SIDE OF BLDG 2221)

Current Risk Final Risk


Task (Steps) Potential Hazard Existing Control Additional Control Prob
Cons. Prob. Risk Cons. Risk
.

Obtain the hot work permits as


required.
Supervisor to ensure all applicable
PTW to be available prior to
commencement of the task.
Proper coordination with client.
Toolbox talks to be held at site, this
Setting out
Unauthorized shall cover the method statement
and risk assessment. 4 3 12
PREPARATION workers at
working area. Only competent and authorized
. personnel to be deployed,
supervisor to ensure all workers
involve in the activity received EHS
induction from EMAL and
DANWAY.
Pre-work check list has to be
completed.
All personnel involve in the activity
must be aware of heat stress,
supervisor to ensure cold drinking
water and electrolytes are
Hot environment available at site all the time. 4 3 12
Conduct toolbox talk about heat
stress
Provide rest shed with air
conditions.

Page 1 of 3
EHS RISK ASSESSMENT

ACTIVITY: REPAIRING THE DAMAGED LV CABLE AT SEA WATER INTAKE AREA (BACK SIDE OF BLDG 2221)

All personnel involve in the


activities must wear their P.P.E.'s at
site (hard hat, clear safety glass,
Working without safety shoes, safety harness, hard
hand gloves, coverall & reflective 3 3 9
P.P.E.s
vest etc.).

Note: This is applicable to all


activities.
Supervisor to ensure approved
HOT WORK PERMIT is available
on site prior to commencement
Use of sharp the task.
hand tools. All hand tools must be in good
Competency of condition with valid colour code,
cable jointer. no homemade hand tools to be
REPAIRING Using damaged used at site, supervisor to check.
THE DAMAGED hand tools Supervisor to ensure the 4 3 12
LV CABLE Use of Heat gun
competency of cable jointer.
(hot blower),
electrocution/ Inspect heat gun before use;
burns. ensure that heat gun is in good
condition with valid colour coded.
Only 110 V to be used at site
Provide firewatcher and fire
extinguisher as required.

Page 2 of 3
EHS RISK ASSESSMENT

ACTIVITY: REPAIRING THE DAMAGED LV CABLE AT SEA WATER INTAKE AREA (BACK SIDE OF BLDG 2221)

NOTE: All Current Risk ranked above C-15 must have additional control measures: Risk = Consequence x Probability (R = C x P)
Tolerable Risk (Low) = 1-6, Medium = 8 -12, (Methods statement), Intolerable Risks (High) = 15 25 (Method Statement plus additional Control Measures in place)
Consequence
Consequence ( Severity) Rating Factors (5) Probability Rating Factors (5) Frequency/Probability
(Severity)
No Safety Health Environ. Financial No Frequency A B C D E
1 First Aid Immediate Minor <AED 1k <1 hr A (1) Practically impossible or Once in 10 years 5 5 10 15 20 25
2 Medical Temporary Short term <AED50K 1-2 hrs B (2) Not likely or Once per year 4 4 8 12 16 20
3 Lost Time Short term Long term >AED300k 2-4 hrs C (3) Could happen or Monthly 3 3 6 9 12 15
4 Disability Long term Serious >AED500k 4-8 hrs D (4) Has happened or Weekly 2 2 4 6 8 10
5 Fatality Fatal Catastrophic >AED1m >1 shift E (5) Common or Daily 1 1 2 3 4 5

Page 3 of 3