You are on page 1of 46

YOUR!

detroit
east riverfront

Framework Plan update

March 1, 2017
Support for the East Riverfront Framework Plan provided by:

2
a riverfront for everyone

3
community driven framework

4
Strategy #1: Parks and Green Open Space
Complete an international riverfront that is inclusive and
accessible to all Detroiters

Strategy #2: Greenways


Build safe and beautiful connections for residents to the Detroit Riverfront

Strategy #3: Streetscapes


Enhance mobility and safety with sustainable street improvements

Strategy #4: Development


Facilitate development among local businesses and property owners,
while preserving the heritage of the Riverfront

5
new parks + waterfront improvements
~7. 5 acres of new parks

ATWATER BEACH

6
existing Milliken State Park

site

previously proposed
private development

MILLIKEN STATE PARK

RIVARD PLAZA 7
existing Milliken site
Statewith
Parkpreviously proposed development

8
expanded Milliken State Park concept

PROPOSED UNIROYAL PROMENADE

9
existing Chene Park west

site previously proposed


private development

10
existing Chene Park west

11
Chene Park west concept

12 12
existing Coast Guard site
Coast Guard Site

site previously proposed


private development

13
existing Coast Guard site with previously proposed development
Coast Guard Site

14
Atwater Beach concept

Spruce Street Harbor Park


Philadelphia, PA
15
Atwater Beach concept

16
existing Uniroyal site riverfront edge GABRIEL RICHARD PARK

17
existing Uniroyal riverfront

Uniroyal riverfront looking east from Mt. Elliott Park


18
Uniroyal RiverWalk

19
expand Greenway connectivity to river

20
the Dequindre Cut

Dequindre Cut 21
Image credit: thedetroiter.com
existing Campau Greenway
EXISTING TRAIL

TRAIL CONNECTION

DEDICATED BIKE LANES

Existing
Proposed

22
existing Campau Greenway

existing trail north of Lafayette Street 23


improved Campau Greenway concept

24
Campau Street connection

existing parking lot at Larned Street looking south 25


new Campau Connector concept

26
existing Beltline Greenway PROPOSED GREENWAY

Existing
Proposed

27
proposed Beltline Greenway

28
Beltline Greenway concept

29
streetscape & mobility improvements

30
East Jefferson Avenue In the last 5 years:

1,350 vehicle crashes

39 pedestrian crashes

9 fatalities

31
East Jefferson Avenue

pedestrian crossing at Jefferson Avenue and Chene Street 32


proposed East Jefferson Avenue improvements: next 2-3 years

33
proposed East Riverfront Section

34
existing Joseph Campau Street

existing streetscape at Campau and Atwater Streets 35


proposed improved Joseph Campau Street

36
publicly owned development parcels

37
publicly owned development parcels

existing Atwater Street at Milliken Harbor looking west 38


Atwater Street development concept

39
Franklin Street area

existing Franklin and St. Aubin Street looking west 40


Franklin Street heritage area concept

41
Whats Coming Parks and Green Open Space

MDNR to expand Milliken Park. Residents and Stakeholders


participate in planning meeting launching Summer 2017

DRFC begins Uniroyal and Coast Guard RiverWalk Expansion


in Fall 2017

DRFC unveils Atwater Beach Summer 2018

42
Whats Coming Greenways

Beltline Greenway construction begins in Spring 2018

Campau Greenway improvements begin in Spring 2019

43
Whats Coming Streetscapes

Jefferson Avenue complete street improvements


begin Fall 2017

Jos Campau streetscape begin Spring 2018

44
Whats Coming Development

RFP for Stone Soap Spring 2017

RFP for Atwater Parcels in Summer 2017

RFP for Brodhead Armory Fall 2017

DEGC outreach and support for East Riverfront property and


business owners

Abatement District and Zoning improvements presented to


City Council Spring 2017
45
a framework to guide investment

YOUR! detroit
east riverfront

Creating a great and inclusive riverfront:

World-class public space (parks + streets)


Greenway connections to the neighborhoods
Accessible (transportation + parking)
Authentic, diverse and local retail
46

You might also like