You are on page 1of 8

REDES DE MEDIA TENSION AND CENTRAL PROCESSING UNDERGROUND PRECAST

M.T. NETWORK PROJECT GROUND AND C.T. COVERED WITH TWO POWER TRANSFORMERS 630 KVA
AND NETWORKS BT GROUND FOR A NEW HOUSING SUPPLY
MEMORY B.T.
UNDERGROUND LOW VOLTAGE NETWORKS
DESCRIPTIVE REPORT
1. BACKGROUND AND PURPOSE OF THE INSTALLATION. 2. SCOPE OF THE PROJECT. 3.REGLAM
ENTACION PROVISIONS AND OFFICIAL AND PRIVATE. 4. ENERGY SUPPLY. 5. FORECAST OF P
OWER IN THE AREA OF ACTIVITY. 6. LAYOUT OF THE RED ELECTRICA. 7. LINES. 8. DRIVE
RS. ELECTRIC 9.CALCULOS 10. JOINTS AND CONNECTIONS. 11. PROTECTION SYSTEMS. 12.
LOCATION OF MEASUREMENT EQUIPMENT. 13. ROUTE. 14. CONCLUSION.
M.T. NETWORK PROJECT GROUND AND C.T. COVERED WITH TWO POWER TRANSFORMERS 630 KVA
AND NETWORKS BT GROUND FOR A NEW HOUSING SUPPLY
MEMORY B.T.
UNDERGROUND LOW VOLTAGE NETWORKS
DESCRIPTIVE REPORT
1.-BACKGROUND AND PURPOSE OF THE INSTALLATION. The purpose of the project networ
k is to guarantee electricity supply to all existing plots in the residential es
tate to be built in Unity in Action TM of, and to all services.
2.-PURPOSE OF THE PROJECT.
The purpose of this project is to put before the competent bodies to the distrib
ution grid at low voltage before us meets the conditions and minimum guarantees
required by current regulations, in order to obtain the Authorization Management
and Implementation installation and provide a basis for when to proceed with th
e implementation of the network. 3.-SPECIAL RULES. AND OFFICERS AND PROVISIONS
This project gives the performance of materials, the calculations justifying its
use and how to carry out the works to be performed, thereby giving effect to th
e following provisions: - Low Voltage Electrotechnical Regulations and Supplemen
tary Technical Instructions (Decree 2413 / September 20 1973, BOE n º 242, dated
October 9, 1973 and Royal Decree 2295/1985 of 9 October, BOE n º 297, December
12, 1985. - Building Technology Standards NTE IER - Red Exterior (BOE 19/06/1984
). - Decree of 12 March 1954 approving the Regulation of Electrical checks and r
egularity in the supply of energy. - Special rules and standards of the Company.
Provider
M.T. NETWORK PROJECT GROUND AND C.T. COVERED WITH TWO POWER TRANSFORMERS 630 KVA
AND NETWORKS BT GROUND FOR A NEW HOUSING SUPPLY
MEMORY B.T.
Electric Power - Law 31/1995 of November 8, Occupational Risk Prevention. - Roya
l Decree 1627/1997 of 24 October 1997 on Minimum safety and health at constructi
on sites. - Royal Decree 485/1997 of 14 April 1997 on minimum requirements conce
rning health and safety signs at work. - Royal Decree 1215/1997 of 18 July 1997
on Minimum safety and health for use by workers of the teams. - Royal Decree 773
/1997 of 30 May 1997 on Minimum safety and health concerning the use by workers
of personal protective equipment. - Conditions imposed by the concerned public a
gencies and municipal ordinances. 4.-supply of energy. The energy is supplied to
the voltage of 380/220 volts., From a processing plant to be installed in the h
ousing estate to another specific project, which then will be transferred to End
esa Electricity Distribution SL, marketer and distributor of electricity in the
province. 5.-POWER FORECAST IN THE AREA OF ACTIVITY. The total power provided fo
r in the area of operation in kW Pt is given by the expression: Pt = Pv + Pc + P
i + Pd + Pp + Ph + P + Pe whereas Pv = Power for housing, is determined by MIE B
T010 and interpretive sheet No. 14 Low Voltage Electrotechnical Regulations.
M.T. NETWORK PROJECT GROUND AND C.T. COVERED WITH TWO POWER TRANSFORMERS 630 KVA
AND NETWORKS BT GROUND FOR A NEW HOUSING SUPPLY
MEMORY B.T.
Pc = power for commercial premises is determined at 100 W / m² of floor area, an
d the coefficient of simultaneity that is deemed necessary (minimal local foreca
st 3 kW), according to the MIE BT010 Low Voltage Electrotechnical Regulations. P
i = Power for industrial premises, is determined at 125 W / m² of floor area, an
d the coefficient of simultaneity that is deemed necessary (minimal local foreca
st 3 kW), according to the MIE BT010 Low Voltage Electrotechnical Regulations.€S
uch establishments are usually working with a simultaneity coefficient varies be
tween 0.10 and 0.20, due to considerations of buildable urban, volume, etc, and
according to the characteristics of the type of industry that are intended to im
plant in the area . In addition, this scenario of power coincides with various r
ecommendations laid down for this type of establishment (1920-1930 VA / m², incl
uding services and equipment). Pd = Power for schools, childcare and education i
n general, is determined at 500 W / square in the absence of data (NTE IER). Pp
= Power for local public concurrence, religious centers, exhibition halls, cinem
as, is determined at 50 W / m² in the absence of data (NTE IER). Ph = Power for
hotel or tourist accommodation establishments, is determined at a rate of 1000 W
/ square, with a minimum of 100 kW for establishments with a capacity of less t
han 50 seats and with a minimum of 25 kW for establishments with a capacity of l
ess than 50 seats (NTE IER). P = Power for the public lighting is determined acc
ording to studio lighting. In the absence of data we can estimate a power of 1.5
W / m² of road. Pe = power for buildings or installations, such as medical cent
ers, sports, industries, etc. These charges will be considered for the calculati
on of the electricity network
M.T. NETWORK PROJECT GROUND AND C.T. COVERED WITH TWO POWER TRANSFORMERS 630 KVA
AND NETWORKS BT GROUND FOR A NEW HOUSING SUPPLY
MEMORY B.T.
low voltage power supply that provides all these plots. 5.1.-APPLE POWER FORECAS
T 1.In the apple one is expected as reported by the architectural project approv
ed by the City Council for HE technical area, maximum building 44 homes in block
-type construction. 44 homes are considered electrification low (less than 80 m2
) and thus as expected ITE010 93.39 kW power. 5.2.-APPLE POWER FORECAST 2.In the
apple 2 is expected as reported by the architectural project approved by the Ci
ty Council for HE technical area, maximum building 12 houses. 12 homes are consi
dered electrification Media (less than 150 m2) with which, according ITE010 prov
ides 57.2 kW power. 5.3.-APPLE POWER FORECAST 3.The block 3 provides as reported
by the architectural project approved by the City Council for HE technical area
, maximum building 32 homes under construction and 1000 m2 Block of business pre
mises. 32 homes are considered electrification low (less than 80 m2) and 1000 m2
of premises with a capacity of 100 W/m2 according ITE010 thus provides a power
173.59 kW. 5.4.-APPLE POWER FORECAST 4.In the block 4 provides as reported by th
e architectural project approved by the City Council for HE technical area, maxi
mum building 13 houses. 13 homes are considered electrification average (less th
an 150 m2) which is expected as a power ITE010 61.6 kW.
M.T. NETWORK PROJECT GROUND AND C.T. COVERED WITH TWO POWER TRANSFORMERS 630 KVA
AND NETWORKS BT GROUND FOR A NEW HOUSING SUPPLY
MEMORY B.T.
5.5.-APPLE POWER FORECAST 5.The 5 provides the block as reported by the architec
tural project approved by the City Council for HE technical area, maximum buildi
ng 40 houses. 40 homes are considered electrification average (less than 150 m2)
which is expected as a power ITE010 139.15 kW. 5.6.-APPLE POWER FORECAST 6.Unde
r the block 6 provides as reported by the architectural project approved by the
City Council for HE technical area, maximum building 40 houses. 40 homes are con
sidered electrification average (less than 150 m2) which is expected as a power
ITE010 139.15 kW. 5.7.-APPLE POWER FORECAST 7.En the block 7 is provided as repo
rted by the architectural project approved by the City Council for HE technical
area, building more than 28 houses. 28 homes are considered electrification aver
age (less than 150 m2) which is expected as a power ITE010 111.65 kW. FORECAST 5
.8.-APPLE POWER 8.On the block 8 is provided as reported by the architectural pr
oject approved by the City Council for HE technical area, maximum building of 74
homes being built Block. 74 homes are considered low electrification (less than
80 m2) which is expected as a power ITE010 142.89 kW. 5.9.-APPLE POWER FORECAST
9.En the block 9 provides as reported by the draft
M.T. NETWORK PROJECT GROUND AND C.T. COVERED WITH TWO POWER TRANSFORMERS 630 KVA
AND NETWORKS BT GROUND FOR A NEW HOUSING SUPPLY
MEMORY B.T.
architecture adopted by the technical area of HE Hall, the maximum building cons
truction of 148 homes in Block. 148 homes are considered electrification low (le
ss than 80 m2) which is expected as a power ITE010 264.99 kW. 5.10 .- SPORTS ARE
A. TO A GBS, PRESCHOOL, SERV.
In the block for multiple uses and because of the lack of data is predicted by a
power m2 scheduled to be built 100 w / m 2, thus: Sup total: 8768 m2 build (30%
): 2630 m2 Power calculation: 263m2 x 100 W/m2 = 263 kW. 5.11 .- VIALES.Según Gr
een Zone and technical project which foresees the installation of 213 mercury va
por lamps color-corrected is predicted a power of 213 x 125 = 26 625 w w Whereup
on in anticipation of increases or higher lighting demand is predicted to 50 kW.
Thus the maximum power demand expected as RC-4 Residential Estate would be as f
ollows: "Apple 1 .......................... 93.39 kW-Apple .....................
.. 2 ...................... Apple 57.2-kW ........................... 3 ........
.......... Apple ............................... 173.59 kW-4 .............. Appl
e 61.6-kW ................................... 5 .......... Apple ...............
......................... 139.15 kW-6 ..... Apple ..............................
.............. 139.15 kW-7. ................................................ 111
.65 kW -Apple 8 ............................................... 142.89 kW-Apple
.. ........................................... 9 Apple ...... 264.99 kW-263 kW .
.......................... Multiple Uses "Green areas and vials .... 50 kW .....
........................
M.T. NETWORK PROJECT GROUND AND C.T. COVERED WITH TWO POWER TRANSFORMERS 630 KVA
AND NETWORKS BT GROUND FOR A NEW HOUSING SUPPLY
MEMORY B.T.
TOTAL POT. HOUSING ..... 1496.61 x 0.6 = 897 966 kW kW with which the total powe
r of CT need to be 897 966 / 0.8 = 1122.45kVA, for which place one o'clock CT wi
th two transformers of 630 kVA unitary power, making a total of 1260 kVA. 6.-MAP
PING OF THE RED ELECTRICA. For the provision of electricity to the various plots
and general services are designed 13 low-voltage lines. The circuits will depar
t from the low voltage boxes installed in the processing indicated in the previo
us section. The electricity, in its way, will only affect land owned by the peti
tioner that His Excellency then pass City Hall. The design of such networks can
be seen in the accompanying drawings. 6.1.-LINE APPLE 1.La individual line proje
cted leave the cabinet approved by the utility company located in CT designated
connection point from which leave to cross the land in question and reach the pt
o / s supply of apples. Total length of approximately 400m. APPLE ONLINE 6.2. 2.
La individual line projected leave the cabinet approved by the utility company l
ocated in CT designated connection point from which leave to cross the land in q
uestion and reach the pto / s supply of apples. Total length of approximately 24
0 mts. APPLE ONLINE 6.3. a single line projected 3.La leave the cabinet approved
by the utility company located in CT designated connection point from which lea
ve to cross the land in question and reach the pto / s
M.T. NETWORK PROJECT GROUND AND C.T. COVERED WITH TWO POWER TRANSFORMERS 630 KVA
AND NETWORKS BT GROUND FOR A NEW HOUSING SUPPLY
MEMORY B.T.
apple supply. Total length of approximately 340 mts. 6.4.-LINE 2 APPLE 3.La indi
vidual line projected leave the cabinet approved by the utility company located
in CT designated connection point from which leave to cross the land in question
and reach the pto / s supply of apples. Total length of approximately 390 mts.
APPLE ONLINE 6.5. 4.La individual line projected leave the cabinet approved by t
he utility company located in CT designated connection point from which leave to
cross the land in question and reach the pto / s supply of apples. Total length
of approximately 190 meters. APPLE ONLINE 6.6. 5.La individual line projected l
eave the cabinet approved by the utility company located in CT designated connec
tion point€from which leave to cross the land in question and get to the pt / s
supply of apples. Approximate length of 160 meters. APPLE ONLINE 6.7. 6.La indiv
idual line projected leave the cabinet approved by the utility company located i
n CT designated connection point from which leave to cross the land in question
and reach the pto / s supply of apples. Total length of approximately 110 meters
.
M.T. NETWORK PROJECT GROUND AND C.T. COVERED WITH TWO POWER TRANSFORMERS 630 KVA
AND NETWORKS BT GROUND FOR A NEW HOUSING SUPPLY
MEMORY B.T.
APPLE ONLINE 6.8. 7.La individual line projected leave the cabinet approved by t
he utility company located in CT designated connection point from which leave to
cross the land in question and reach the pto / s supply of apples. Total length
of approximately 140 mts. APPLE ONLINE 6.9. 8.La individual line projected leav
e the cabinet approved by the utility company located in CT designated connectio
n point from which leave to cross the land in question and reach the pto / s sup
ply of apples. Total length of approximately 400m. APPLE ONLINE 6.10. a single l
ine projected 9.La leave the cabinet approved by the utility company located in
CT designated connection point from which leave to cross the land in question an
d reach the pto / s supply of apples. Total length of approximately 70 meters. 6
.11.-LINE 2 APPLE 9.La individual line projected leave the cabinet approved by t
he utility company located in CT designated connection point from which leave to
cross the land in question and reach the pto / s supply of apples. Total length
of approximately 170 mts. 12.06 .- GBS line 1, PRESCHOOL, SERV. SPORTS. The pro
jected single line will leave the cabinet approved by the utility company locate
d in CT designated connection point
M.T. NETWORK PROJECT GROUND AND C.T. COVERED WITH TWO POWER TRANSFORMERS 630 KVA
AND NETWORKS BT GROUND FOR A NEW HOUSING SUPPLY
MEMORY B.T.
from which leave to cross the land in question and get to the pt / s supply of a
pples. Total length of approximately 220 mts. 13.06 .- LINE 2 OF GBS, PRESCHOOL,
SERV. SPORTS. The projected single line will leave the cabinet approved by the
utility company located in CT designated connection point from which leave to cr
oss the land in question and reach the pto / s supply of apples. Total length of
approximately 270 mts. 06.14 .- VIALES.Las green and lighting supply lines of g
reen areas and roads are not covered by this project since they depend on the si
tuation of dashboards and protection, so it will be included in the proposed leg
alization of lighting throughout the estate. 7.-LINES. All lines shall be buried
under the PVC pipe D / C of 160 mm. in diameter at a minimum depth of 60 cm. on
sidewalks and 80 cm. at crossings of roads. In the pipe under the sidewalk, the
support tube on a bed of sand washed river "of 10 cm and on tape he placed" cab
le Care and earth fill compacted to 95% of standard proctor. For the pipe in cro
ss-road, the pipe will be embedded in concrete foundation of 100 Kg / cm ² of ch
aracteristic strength and 35 cm thick, ranking equally tape "Customer cable and
earth fill compacted to 95% of proctor normal . In order to fully register the f
acility, at each point of the network where the attack be carried out with the p
rotection and measurement boxes located on each parcel, will install a chest typ
e A-1 of solid ceramic brick (zither) plastered inside, with cast iron lid 60x60
cm. and an absorbent bed of sand at the bottom of it, these boxes are also loca
ted in each of the crossings, diversions or changes of direction and at least ev
ery 40 m in straight alignments. If this is a newly built development, where roa
ds and services
M.T. NETWORK PROJECT GROUND AND C.T. COVERED WITH TWO POWER TRANSFORMERS 630 KVA
AND NETWORKS BT GROUND FOR A NEW HOUSING SUPPLY
MEMORY B.T.
be possible to pinpoint all the boxes in the sidewalks is not allowed to build t
hem where there is traffic. 8.-LEADS. The drivers used in the facility will be A
luminum uniform unipolar RV 0.6 / 1 kV (cross linked polyethylene insulation) PV
C pipe buried under D / C of 160 mm in diameter,€with some sections of 150 or 24
0 mm ² (depending on Technical Standards for Construction and Installation of El
ectrical Distribution Facilities Co.. supplier). For the neutral section may be
used the next smaller from the previous ones, except for phases 25 and 50 mm ² i
n which the neutral is placed in the same section. The calculation of the sectio
n of the conductors will take into account that the maximum value of the voltage
drop does not exceed 5% of rated voltage and verify that the maximum permissibl
e intensity of the drivers is guaranteed at all times. 9.-ELECTRICAL CALCULATION
S: Calculations which are listed below have been made to verify that with the pr
oposed sections in the planes, not exceeded in any part of the installation, the
voltage drop values listed in the regulations Electrotechnical Low Tension: - 5
% of the composite voltage circuits for power. - 3% of the composite voltage cir
cuits for lighting. The calculations have been verified, so that in any case the
feeding lines and connections do not support a higher intensity to the provisio
ns of MIBT MIBT 007 and 017. The formulas that were used for the various investi
gations are:
M.T. NETWORK PROJECT GROUND AND C.T. COVERED WITH TWO POWER TRANSFORMERS 630 KVA
AND NETWORKS BT GROUND FOR A NEW HOUSING SUPPLY
MEMORY B.T.
Three-phase lines: ---------------- PI = 1.73 x V x 1.73 x 0.8 x 0.8 Lx I e = --
------ ----------- SXC single phase: PI = 0.8 x V ------------ 2 x L x I x 0.8 e
= ------- CXS ------- Where: I = current in amperes of the line. P = power in w
atts receivers. V = voltage in volts. Power Factor = 0.8. 1.73 = Constant-phase
systems. L = Length of the line in meters. C = conductor resistivity for the Cu
= 56 S = Section of the conductor in mm2. The lines are calculated by considerin
g the worst case, bone whereas the entire load is concentrated on the pto end of
it, or if you have two branches in half of the total power in the pto end of ea
ch branch.
M.T. NETWORK PROJECT GROUND AND C.T. COVERED WITH TWO POWER TRANSFORMERS 630 KVA
AND NETWORKS BT GROUND FOR A NEW HOUSING SUPPLY
MEMORY B.T.
APPLE ONLINE 9.1. 1.The line characteristics are: Voltage (V): 380 Three-phase,
single phase 220. C.d.t. max (%): 5 Cos &: 0.8 Coef concurrency: a considerable
power: 93.39 kW intensity calculation: 177.37 A Length: 400 mtrs Section: 3.5 x
150 mm2 Al 0.6/1kV RV. Maximum voltage drop: 4.92% (less than 5%) 9.2.-LINE APPL
E 2.The line characteristics are: Voltage (V): 380 Three-phase, single phase 220
. C.d.t. max (%): 5 Cos &: 0.8 Coef concurrency: a considerable power: 57.2 kW i
ntensity calculation: 108.64 A Length: 240 mtrs Section: 3.5 x 150 mm2 Al 0.6/1k
V RV. Maximum voltage drop: 2.21% (less than 5%) 9.3.-LINE 1 APPLE 3.The line ch
aracteristics are: Voltage (V): 380 Three-phase, single phase 220. C.d.t. max (%
): 5 Cos &: 0.8 Coef concurrency: a considerable power: 86.79 kW intensity calcu
lation: 164.84 A Length: 340 mtrs Section: 3.5 x 150 mm2 Al 0.6/1kV RV.
M.T. NETWORK PROJECT GROUND AND C.T. COVERED WITH TWO POWER TRANSFORMERS 630 KVA
AND NETWORKS BT GROUND FOR A NEW HOUSING SUPPLY
MEMORY B.T.
Maximum voltage drop: 3.77% (less than 5%) 9.4.-LINE 2 APPLE 3.The line characte
ristics are: Voltage (V): 380 Three-phase, single phase 220. C.d.t. max (%): 5 C
os &: 0.8 Coef concurrency: a considerable power: 86.79 kW intensity calculation
: 164.84 A Length: 390 mtrs Section: 3.5 x 150 mm2 Al 0.6/1kV RV. Maximum voltag
e drop: 4.36% (less than 5%) 9.5.-LINE APPLE 4.The line characteristics are: Vol
tage (V): 380 Three-phase, single phase 220. C.d.t. max (%): 5 Cos &: 0.8 Coef c
oncurrency: a considerable power: 98.56 kW intensity calculation: 116.99 A Lengt
h: 190 mtrs Section: 3.5 x 150 mm2 Al 0.6/1kV RV. Maximum voltage drop: 1.65% (l
ess than 5%) 9.6.-LINE APPLE 5.The line characteristics are: Voltage (V): 380 Th
ree-phase, single phase 220. C.d.t. max (%): 5 Cos &: 0.8 Coef concurrency: a co
nsiderable power: 139.15 kW intensity calculation: 264.26 A Length: 160 mtrs
M.T. NETWORK PROJECT GROUND AND C.T. COVERED WITH TWO POWER TRANSFORMERS 630 KVA
AND NETWORKS BT GROUND FOR A NEW HOUSING SUPPLY
MEMORY B.T.
Section: 3.5 x 240 mm2 Al 0.6/1kV RV. Maximum voltage drop: 1.61% (less than 5%)
9.7.-LINE APPLE 6.The line characteristics are: Voltage (V): 380 Three-phase, s
ingle phase 220. C.d.t. max (%): 5 Cos &: 0.8 Coef concurrency: a considerable p
ower: 139.15 kW intensity calculation: 264.27 A Length: 110 mtrs Section: 3.5 x
240 mm2 Al 0.6/1kV RV. Maximum voltage drop: 1.08% (less than 5%) 9.8.-LINE APPL
E 7.The line characteristics are: Voltage (V): 380 Three-phase, single phase 220
. C.d.t. max (%): 5 Cos &: 0.8 Coef concurrency: a considerable power: 111.64 kW
intensity calculation: 212.03 A Length: 140 mtrs Section: 3.5 x 150 mm2 Al 0.6/
1kV RV. Maximum voltage drop: 1.73% (less than 5%) 9.9.-LINE APPLE 8.Parties lin
e characteristics are: Voltage (V): 380 Three-phase, single phase 220. C.d.t. ma
x (%): 5 Cos &: 0.8 Coef concurrency: a considerable power: 142.89 kW intensity
calculation: 271.4 A
M.T. NETWORK PROJECT GROUND AND C.T. COVERED WITH TWO POWER TRANSFORMERS 630 KVA
AND NETWORKS BT GROUND FOR A NEW HOUSING SUPPLY
MEMORY B.T.
Length: 400 mtrs Section: 3.5 x 240 mm2 Al 0.6/1kV RV. Maximum voltage drop: 3.5
2% (less than 5%) 1 APPLE ONLINE 9.10. 9.The line characteristics are: Voltage (
V): 380 Three-phase, single phase 220. C.d.t. max (%): 5 Cos &: 0.8 Coef concurr
ency: a considerable power: 132.49 kW intensity calculation: 251.65 A Length: 70
mtrs Section: 3.5 x 150 mm2 Al 0.6/1kV RV. Maximum voltage drop: 2.01% (less th
an 5%) 9.11.-LINE 2 APPLE 9.The line characteristics are: Voltage (V): 380 Three
-phase, single phase 220. C.d.t. max (%): 5 Cos &: 0.8 Coef concurrency: a consi
derable power: 132.5 kW intensity calculation: 251.65 A Length: 170 mtrs Section
: 3.5 x 150 mm2 Al 0.6/1kV RV. Maximum voltage drop: 4.42% (less than 5%) 9.12 1
.- LINEA DE EGB, PRESCHOOL, SERV. SPORTS. The line characteristics are: Voltage
(V): 380 Three-phase, single phase 220. C.d.t. max (%): 5 Cos &: 0.8 Coef concu
rrency: a considerable power: 131 kW
M.T. NETWORK PROJECT GROUND AND C.T. COVERED WITH TWO POWER TRANSFORMERS 630 KVA
AND NETWORKS BT GROUND FOR A NEW HOUSING SUPPLY
MEMORY B.T.
Intensity calculation: 248.8 A Length: 220 mtrs Section: 3.5 x 150 mm2 Al 0.6/1k
V RV. Maximum voltage drop: 4.11% (less than 5%) 9.13 2 .- LINEA DE EGB, PRESCHO
OL, SERV. SPORTS. The line characteristics are: Voltage (V): 380 Three-phase, si
ngle phase 220. C.d.t. max (%): 5 Cos &: 0.8 Coef concurrency: a considerable po
wer: 131 kW intensity calculation: 248.8 A Length: 270 mtrs Section: 3.5 x 150 m
m2 Al 0.6/1kV RV. Maximum voltage drop: 4.94% (less than 5%) 10.-EMPALMES AND CO
NNECTIONS. The joints and lead connections shall be made using methods or system
s to ensure a perfect conductor continuity and isolation. It should be made perf
ectly secure watertightness and resistance to corrosion that may cause the groun
d. An appropriate method for the realization of joints and connections may be th
rough the use of hydraulic pliers and applying a base coating film cured. 11.-SI
STEMAS PROTECTION. First, the network of low voltage distribution shall be prote
cted against the effects of current surges that may occur in the same (MIE BT 02
0), therefore use the following protection systems: - Overload Protection: Fuse
will be used or circuit breakers calibrated conveniently located in the box low
voltage transformer station, from where the circuits (as annexed to calculation)
when does all the layout of the circuit under constant section (and it is prote
cted start of line), it is necessary to place
M.T. NETWORK PROJECT GROUND AND C.T. COVERED WITH TWO POWER TRANSFORMERS 630 KVA
AND NETWORKS BT GROUND FOR A NEW HOUSING SUPPLY
MEMORY B.T.
protection elements at any point of the network to protect the restrictors. - Sh
ort-circuit Protection: We use fuses or circuit breakers calibrated conveniently
located in the box, low voltage of the transformer. Second, for protection agai
nst direct contact (MIE BT 021) have taken the following steps: - Location of th
e electrical circuit pipe buried in a ditch practiced for that purpose, to be im
possible to inadvertent contact with hands of people that usually circulate in t
he steel. - Accommodation for the protection and control systems from the mains
and all relevant links in insulated boxes, electrical panels, which require spec
ial tools to carry out its opening. - Isolation of all drivers with cross-linked
polyethylene (VR 0.6 / 1 kV) in order to cover the active parts of the installa
tion. Third, for protection against indirect contact (MIE BT 021), Cia. Supplier
undertakes to use its distribution networks in the diagram TT BT,€ie B.T. Neutr
al made directly to the ground and bodies of the receiving facility connected to
a land separated from the previous as well as employment in the installation of
RCDs adequate sensitivity to the type of location and terrain features. On the
other hand, is required to connect the neutral to ground at the processing cente
r and 200 meters underground networks (according to BT MIE 006) and every 500 me
ters in aerial (as BT MIE 003), however, although the length of each circuit is
less than the number reviewed, the neutral will be connected at least once a lan
d at the end of each circuit. 12.-UBICACION MEASURE OF EQUIPMENT. Although the l
ocation of the measurement equipment is not covered by this project, as specifie
d below some technical specifications to be met for proper installation and in a
nticipation of the outline.
M.T. NETWORK PROJECT GROUND AND C.T. COVERED WITH TWO POWER TRANSFORMERS 630 KVA
AND NETWORKS BT GROUND FOR A NEW HOUSING SUPPLY
MEMORY B.T.
The counters are located individually for each subscriber, which is to say, for
each plot (for houses), or portal where apartment blocks in this case being cent
rally placed on the landing of ladder. In order to facilitate the taking periodi
c readings to mark the counters, to invoicing respond to actual consumption, tho
se will be housed within an approved pre-fabricated unit, situated on the edge,
or fence off the plot path transit, or in the case of centralization of counters
as specified in the MIEBT015. This module should be as close as possible to the
general protection box, could constitute a single unit niche, becoming a box as
overall protection, without prejudice to the dimensions that the two must maint
ain to meet its own function normally. This module must have suitable openings a
nd be connected by pipeline built to a depth of 1 m. under the grade of the side
walk. When placed in the fence surrounding the plot, the module will be located
at 0.50 m. on the slope of the sidewalk. In the case of centralization will be l
ocated at a point to which must be provided in the building a room or adequate s
pace for this purpose, which will place the various elements needed for installa
tion, according to Art 1.3 of MIEBT015. The boxes measure of protection and insu
lation will be class A, alkali-resistant, self-extinguishing and sealable. The e
nvelope must have internal ventilation to avoid condensation. Must at least in t
he service position a degree of protection IP-433, except at its front end and i
n those exposed to shocks, which, once completed its placement into service, the
third numeral not less than seven. The calculation and design of the fuses in t
he box Feeder Protection-Measurement and each subscriber will be based on the ac
tual power demand for the facility. 13.-PLANOS. The document for this project, h
ow many planes are attached requirements have been estimated with sufficient det
ails of the facilities that have been planned, with clarity and objectivity.
M.T. NETWORK PROJECT GROUND AND C.T. COVERED WITH TWO POWER TRANSFORMERS 630 KVA
AND NETWORKS BT GROUND FOR A NEW HOUSING SUPPLY
MEMORY B.T.
14.-CONCLUSION. Explained the purpose and usefulness of this project, we hope th
at it will merit the approval of the Administration and the City, giving us the
necessary approvals for processing and commissioning. The Qualified Industrial E