You are on page 1of 19
‘STANDARD SFECIFICATIONS SECTION Ill - SUBBASE AND BASE COURSES 300.01 Description ‘These specications for mses and equipment used in the constuction of subbase and bate courses, apart from other typ of base courses spaced in Section IV of these Standard Spectiatons, appl to Werks parlomed under Section It, Equipment for Subbese and Base Courses, Seton 2, Aggregate Subbase and Base Courses, and Socton Ik, Sand Aephalt Courses, 58 indeated on the Drawings. and a= spelled betel dior in the. Partousr ‘Specfeatons and includ ath ls of Quatte. 300.02 Standards and Codes ‘The mest recent version ofthe flowing standard specications, 2s wall as hose standards escibed in Claus 40002, Standards and Codes, shal apply fo mera includ inthis Section Uunlsscthervise noted herein, Matorale which require ning po’ 10 peorning any ofthe ‘peced tests, excopt these mateals which wil be proceed in an aephal pnt da, sal be ‘ied st temperate not rater than 60°C for sol marl 10°C fr sagregato [AASHTO American Association of Stat Highway and Transportation OM M145 Cassfcaton of Sots and Sol Aggogste Motus for Highway Construction Purposes ‘To02 —_Sarmling of Aggregates TOSS Specie Groviy and Absorption of Coase Aggregate ‘TOSS Determining the Lig Lin of Sots Tos0 Determining the Pla Lmt and Plastcty Index of Sole TOs _Resistanca to Dsgredaton of Sia Size Coarse Aggregate by Abrasion and Impoct by Use ofthe Las Anois Machine ‘Ti04 _Soundnoss of Aggrgste by Use of Sodium Sulphate or Magnetum Sulphate “T165 Effect of Water on Cohesion of Compacted uninows Metres 176 Pate Fine in Graded Aggregates ac Sots by Uso of ho Sanc Equivalent Test ‘T180 _Moistre;Densty Relations of Sale Uso a 10. (454g) Ranmar and an 18- Inch (487m) Drop 191 Densty of Sol i-Pace by the Sand-Cone Method 193 Colfora Searing Ratio (COR) 2.8; Beh Standards 812 Chere Content, Flkiess index Elongation 1377 Subpete Content ASTM: American Society for Testing and Materials Sy Vik) ' & ej He) eee a rt peerete [STANDARD SPECIFICATIONS. 300.03 Storage and Handling of Materials Motors shall be so store and handled aso e816 th prosorvation oftheir aly and fess for the Works. Natorais, even though approved before storage or handing) may again be Inopectd and ested pris to ue inthe Works, Slored mall shal be locaod 10 a ofacltato {hair prompt Inepecten. All storage sles shall be rosiored to the eine condtion at the CConractrs expense ror te accepance of the Werks Honding and stocking of agpregats shall at all ies be such ast enna segregation or Contamination ofthe venous ses. Stopes shal be kept ft andthe fomaton of hgh cone- ‘Shaped ples shall not be parmiled. When conveyer bets are used for stocking aggregates, the Engnoer may eae the use of bale chs oF perforated chimnoys. When tncks are used to Condit stockpiles, the stocples shal be constucid one lye at tie wth tucks deposting thor loads as close to tha previous loads posse. The us of trators or loaders to push ‘malaal epost at one location fo othe cation inthe stockpile wi ot be alowed ding he Constucton ofthe stockpile and ther wo eh be ied to lovling the doposid material ony ‘Stoekilen of egoregtelcatd at permsnentesphal plant ses shall be sepanted by bin was {2d shal be consrucies on ssphalc or concrete floors. Sock locations ard procedures at temporary asphalt plan tes shal be as sopraved bythe Engines. Intermediate storage of heated fe and commercial mineral ib fer equipnent feeding the ‘sphat plant shall be sl of adequate ss to ensue a minimum of one days continuous operation. 300.04 Inspection, Testing and Control of Materials For vrication of weights and massures chert of mateals ae determina of emperates| tied in the proparaton of the sephat mbes, the Engineer wil at all times have acess to porbons of te ming ple, aggregate plan, sloroge yrds, ushers and or flies used for Producing and processing the materiale of consucon. The Engiear wil have authority to ake amps and perform tse tera of any mtr sppld othe st rom any source whatsoever inorder 0 estalan thee compliance wih the Spectiatons and to acept or ct ashe deems Iovossary, Sarcies shal lao be taken from completo work to dotarmine compliance with the Speccatona. The fequoney ofall sampling and tectng shal be in sccordance wth these ‘Standard Spoctiatons andor as dreciedby te Engineer. ‘one same everyone houtand cable ates (1000 mF pat of as directed by he Enon ‘hol be tested for las by abrasion, mmm dey dsl, grading, pasty dex sndNCBR, “Three Inetu densty tots shall be taken every 300 square metres (200 m") of any and bate course ll, o a8 dactod by the Engineer. x 300.05 Unacceptable Materials. Marts that do not comaly wth tho quirements ofthese St ejected and removed inmadatl from the so of tho Works the Engineer. No rejected mati the deecs of whch hve been Verson2.0 ‘ecient Novarber2014 Popo ers , STANDARD SPECIFICATIONS. approvel has boon given bythe Engineer 300.06 Sources of Materials “The ators wed inthe Works shal metal quay requrementsspeciod. Al natals shall be to3 and spores Before use, The Contector ena noiy the Engineer f the sources of ‘materais and the Engineer wil approve the sources prior 1 dalvery of mata to te Ste Were the source of atrial dese not moot Specicaion equvement, the Contactor shall fumish materal rom athe sources, Overy of materiale produced om commerce manufacturing processes shall be accompanied by the menulacturee eeiflaon and Yet raat shoving the ‘aa comp wth the Speceaonrequrements, 300.07 Water Ptale water shat be used forthe purposes of ming and compacting subbase and base course ‘matr. The uso of see water or brackish water wl not be permed. ules specfcaly stated to the contrary, 300.08 Measurement and Payment "No separate measurement or payment wil be made by the Departmont forthe work os deserted In tis Section. A work as specie herein shall be considered as eueisary obignon to the toms inl In tha Bile of Guanes end spected in other Sectone of tase Standerd Speatiatons. Versen2.0 STANDARD SPECIFICATIONS, SECTION IIk2_ AGGREGATE SUBBASE AND BASE COURSES 302.01 Deseription ‘Aggregate subbaso and base courses shall consist of crushed mineral aggregates or nats mineral aggregetes of the gradation and thiekness specie n these Standard Spctiatons and 28 ncats onthe Orawnge, ‘The Contractor shal unis, place and comact aggregate base couse fo approach slabs and spgregate sbbase courso fer paves roscueys,sarvice roads and paring ares complying ith tho nos, grades, hcknesves an typical sets Indated on the Drawings, at speed heron, ‘or as directed by the Engineer. Unless ohersse indicat on he Oring, specified inthe Pariular Spaciostons or dreted bythe Engineer, all earegne eubaee materi shal comply with te requremers of Aggrepe> ‘Subbase(Gradston &) os spactiea in Cause 30206, Typos of Aggregate Suabese and (Courses of hese Standard Speciatons 302.02 atrial Requirements for Subbase and Base Courses The materials for subbase and bese courss shal comply withthe requirements 28 speed herein and shal be as approved by the Enginoor. Tho Contactor shal submt samples ofall ‘materi othe Engineer or approval prt ursshing and placing any mater, The mate Sampo shat moat alowing ters ‘AgregsteSubbave shal meet he folowing tet raurements a eee a ms ee eee ee or er a aan ‘aaron |S ee eS =e ae [chide Content | eS 017 a i Faves —f asa ey esen20 ory Novena 2014 Pogo ets Enongaton Beare 5 he ‘Specie Gray "AASHTO T1008 F085 2200, Max Dry Density ‘AASHTO T1800 Zid geen CBR. at 06% of MDD | AASHTOTIOS ASTM DTOBS) | 65% Mh, ‘Natural Aggregate Subbese and Base Couses shall consist of 228 ae fre mineral aggregates lich have been sorsened ans bended to he various gedatans spaced her and cones tothe lense a india on the Drawing Crushes Aggregate Subbese and Bose Courses shall const of crushed coaresaggrepst ana ‘rushed or natrl ine aporegeteseeened and lendedin ccardance wih the gadaon specs herein and conte othe thcnessrs as ndatad onthe Drawings. 30203 Fine Aggrogates Fine aggregate (pasting the No.4 sieve) shal consist of ntural san andor cushod sand end ‘hal be of such gredston hat when combined win afer require epgregate factons in reper ‘Proportions, he rutant mature wil moet he gradation specied ‘Te fne aggregate shal be clean ard fee from erganic mater, lay and other extraneous or etimenta meters, The portion of ne aggregates passing the No. 200 slave shall not exceed 213 ofthe potion pasting ho No, 40 sow. “The mater passing the No. 40 sive shall have © maxirum Suid Sent of 35 and he platy Index aha ot exces, When the source of oe agoregtes does not mest he above requremonts, the Conracor may, wth tha Enginoersaporval, ade adtional ne agarogate andor Mr to correct gradation or to change the charsctesis of the material passing the No. 40 siove so as to moot te Speeticatons Suen adsinal matralshat be aed Ins manner which ensues corey homogeneous gradaton as approved by te Engner 302.04 Coarse Aggregates Coarse aggregate (retaned on he No, 4 save) shal consist of crashed sone, cushed grave ratul grovel and shall be of such gradation that when combnad wih other cured apgrogeta ‘recone in proper proportion, te restate wi et he grado speci \wmon crushed aggrogat is require, not les than 60 percent by weight of negates retained ‘on the No.4 seve shal have af lest one tracted face. Tho Foknes Inet of the cuchad ‘Spgragat shal not exceed 35 poront } wa *e Tie moo free hl tnt etd resistance to abrasion (AASHTO T0896). Vy A versie 20 Sacto 2 = Paget ts ik [STANDARD SPECIFICATIONS ‘The course aggreose shall be hard and durable and rea fom orpenic mat, lay and other envaneavs or deren! matersis ‘Coarse aggrepeto shal have 8 maximum sadlum sulphate soundness les o 12 percent and ‘magnesium sulpte soundness les of 19 pacar, 302.05 Types of Aggregate Subbase and Base Courses ‘The combined gradation including the ad coarse sgaregaes shal conform tthe gradation of “ype (A), (8) oC) Tab 30208. ‘The gradation of materi o be used in the aggregee subbase and base cous as shown in ‘able 30205 inate the mts witin which the moral could be seeated The connuous smooth gradson of materials used shall be kept within the species gratin ite and gep gradng shall be avoided. Selecton of one ofthe gradations chow Inthe ible shall bo 9s Indeated on te Drawings andor In thse Stondard Species. Unless otherwise spied, Creda 8 shat be used when aggregate bac or eubbasosepeced. peer Sines cos caer meet [Semarre wm ES : = a ee ee a tome | wor| oa a sa [ ==] 0 eo | ea | a _ i. ay ‘ho feloning eres aug conan * ‘ RS en SOS rearace seater tees Perea Verwon20 ‘Seaton 2 November 2014 Papeete [STANDARD SPECIFICATIONS. 0208 Construction Requirements for Aggregate Subbase and Base Course ‘nid Suborade Laval. Prior o commencing the constuction of he subbaso and base courses, the Contractor shall moka sure that tho subgrade cxmplles ith the Spectcatons and ie compacted othe mavimum dy deasiy as hace in Sect Il Echwork, of these Standard Specticatone, ard tat the surface toro! compile wh the levels and slopes indosted Inthe lngtdinal and cross-eacton Drawings. In all ‘cases tne approval of he Engineer must be obaned before commencing spring of ‘aerial forthe subbese end babe cowsos. ‘Scrmoring and Mise of he Matals. Scrsning shall be require forthe mater ‘Ged in agoragateeubbace and base courses. Sean shall oof he sz and number ‘required to remove oversize aggregate and, nacestay, 0 separate the msi nto two or mora racine ao tat they may be combined to meet the roqued gradaton, \inen conveyor bot sampes from the end of te seraning andr cshing-sreening ‘operation eld product consistent within the specified gradeton, wo futher rang shal be requ ana the meri ma be lade and hauled dec the oad nthe ‘vent he mits stoped, shall bo stockped so a o prevent sagrepston ng of mater ean be servevea tough he Use ofthe Sota ng panto ward Imaer ee per Cauee 201.02, Equpmen Used for Aggrepsta Sutbese and Base ‘Courses, of hese Stans Spoceatons Whore separate size matals oe o ba landed to meet the gradtn, such Hern ‘hal be ae deces by the Engineer and eal be sccomplshod prior doivery fo the rondway. Mexing of sepereta meorils on the roadway by motor grader wl not be permite by te Engineer. ‘Sereadna and Compacting. Aor cang ot the screening and mixing of aggregate iar, samples of the approved matori shal be taken in ower determine the plimum leurs conta Nate ehall han be spread onthe prepared srtace In layers not more than Sem ‘compacted thekness o achiev the ttl hiskress a nda onthe Drawing, Core sha be taken in spreading and compacting the aggrgatesutbase note damage the brie ae spooled In Claes 207.05, Geoltle Fabio, of tase Standard Spectiatins. The nl mols crt feng subband bas cous {fat be ere. nal moss cot sles i sm ate Ente e ena aa tr mus a tan Sant long fo be cot wh ay et by evaporate ‘Bag, lting and eonpacig, Spends co smonpher emote eo Intl ant eq sd fob ae ts pen ihe Sate cpa wien te owt tant ben Sn 2 0 Versan20 ‘Sesion 2 Noverber 20% Paget 6 nd ‘STANDARD SPECIFICATIONS optimum moisture content n de o oben maximum dry denaty, ad the mci CWniant is uniform ina pars of he secton where the werk is Being cared out and Ine varous depne othe layer hikes Ite natal moisture content in matras exceeds the optimum mois content. hen ‘he Gantactr shall aerate the material der to reach the opomam raise content ‘Compaction sat stat immediately theres, by means of ppeumatc and ste! rors corviatory ler and in aecorante withthe nrcton of he Engine Ccompacon sal ster wih oles fom extreme ses proceeding gresvaly toward he road ws. Rong shal contin ui relative density of rot ss tan 8 percent ofthe Imaxmin ay dansty has teen obtained se detemined by the Molstue-Densty Relatonsip Test AASHTO TO. The CBR of he subase matral shal not belt ‘hans 4 MutLayers During the operations of mitng, spreedng,compscine and iovling of fbbeee and base couree mateo care shal bo tke so that Inyersaready compacted Under the layer being executed af nat fete, otha the fished subgrade or base ‘sure 6 ato nt eect. This equromont shat gen spec arenten pcos ‘here equipment makes ture mn going back and forth an any such care esting ‘mnng th verious layers consttutg the aifrentcubgrads and base courses shal be {arty made good bythe Contato at his expense and to the saefacton of he Engnoor. It more thn one subbace or base cours ered fer eacing he requ hcknees| enered i the specticatone, each euch couse shal be consbuded 88 spectod hein \Wmare the fished total compacted thickness excoeds 18cm, each layer shal be ‘xocuted in compost layers not exceding TScm in tikes alr compaction, unl ‘othernise aproved bythe Engineer nwig. 302.07 Protection of Surface ‘The Contractor shal protect the subbase or base course so that shall be minal sound ting werk progress, fr ts completion and port receiving te bluminous bers or pir fo laying the surece overiay thereon. Any damage caused tothe layer exposed tafe or natural condone resulting In damage to ls surface should be mado good to the ssislaction ofthe Engineer The subbao and bso coureos shal ot bo rl when he underhng mater sf er Yen ‘rwhen the rolng causes 8 wave-ake maton this couse ion hang eps epi, he ep ut abe od Det See ee at Trt, Verson20 Sesion 2 “Newer 2044 Pages te — 7 ‘STANDARD SPECIFICATIONS. seeiicaons, Along places naccasabl to roles, he subse and base couse tor ‘amped hooughy with mechanical tapers. Warn the sutbase and base course eal not be permits dng ay weather Heuing equipment may be rosted over completed portions ofthe subbase ard base courses provtad no damage results and provided tat such equpmont Is outed ovr the ful with of the our avid rutng or uneven compaction. ‘The Engineer hes the night stp all haulng over competed o arial compleled subbase and base courses when in his opinion seh having is using damage, 202.08. Propating the Surface bofere Priming Flowing the completion ofthe base course and sutbase courses the Conrctor shal perform ll Irininance work necessary to Keep the couse na contin fr priming. The sme coat shall tbe apptad eer properaon of the provusly comeacted sufac, all in accordance with ‘Section IV, Prime Coat, ofthese Standard Specfeaions 1302.09 Testing and Acceptance of Aggregate Subbase and Base Courses ‘or to the appcton of any prime coat er any other paving couse, tho aggrogaie swbase andor base couse shal have boon testod ad accepted by the Engineer. The felowng shal be ‘chorea om accepting completed aggregate subbece end base courses ‘2. Bagutumanis or Compaction, wherever the degre of compaction found obese {han the 68 percent spectid, th area of subbase or base couse lvaved shall bo stttscorycoected to tha the minum spect deny is achivod , Rasulamente for Gradation, Wherever the gradation Is found to bo cts the Emits pected, the ee ofsubbere endfor base course involves shal be said, romoved oF ohenise roworkod ae drected by the Engineer to provide a metal within the ‘pected kts ‘& Thiskness Reauvamants. Tho ttl constructs hickness of agpregate utbase orbase ‘ours ured for new consnicon, econabuston or wining of roadways shall ot vary ‘more than nm rom hs ota theese ated on he Drawing. Inthe event the constructs thiknoss of the aggrogatssubbace or bass couse i mm more than the foal thickness isoatod on the Draniegs, tho ara vd shal bo Src ed En roe es mo ‘manner to provide the required thekness. Inthe event the constructed thiskness ofthe aggregate subbase or lass than the foal tckneesinseatd on tho Drawings, the Co 2) In et ‘ton mele nthe next course (base course or wearing cous erson2.0 ‘Seaton 2 Nove 20% Pagpeat te . STANDARD SPECIFICATIONS. ‘he dfictency of the subbaso or base course exceed 25 mm, ‘The sgarepste subbaso or basa course shall be consbucted to the grade lve a Irate onthe Orawings, a specie and ae approved bythe Ens. Inno case sha the tot! sum thickness ofthe subbase cures, base cause and woarng ‘course belss than the total sun hkness ofl courses a insted en the Orewings. 4 Regdioments or Evenness of Suse and Grae Lal “Tho nal suacss of the subbase o base course shall be tested by means of #5 mote long straightedge: and no rises or depressions in excess of om shall appear onthe surface: cherwise such areas shal be stipped, careced and recompacte to comply ‘wth all spectcaton requtements end ae spproved by the Enger. Further, the finshed surface of te subbaco or baso cours shall be consbucted ewitin Tamm of the grade levels indcated onthe Drawings. Minmum Test Reoutements ‘One sample evry one thousand (1,000) eis vb al bu ae fom he stoop for Grating, Soundnoss, Loss by Abrasion Maxarum Dry Dens, Plt Index, Sand Equivalent and CBR- One in sits deny tot shal be takon every tes hundred (200) square moves of agorogata subbase or base couse 302.10. Recycled! Secondary Aggregates Recyletseconday aggregates for use in Aggregsie Bate or Subbase shall bo n accordance wih DMA Cieulr No, S72012 requiring the mandatory ws (F specie in the Contract and utjec to avalblly) of reoyed construsion and demotion wast inroads procs a well © any oer insecure projects throughout the Ema of Abu Dhabi. “This spctation shoul also be read in conjunction wih cree number 92011, 2 sued by the Deparment of Munispal Aff in Abu Dhabi (Chakman’s Ofies) giving aperovel for RCA spectzatons ote used inal inrasructure an oad projet in th Eat of Abs Ona, should be nod that references fo RCA shall mean read crushed sopregate as produced by tho co and ofa concession hada fr the Emirate of Abu Ohad only and cyl ered sggregate matoral shal net be imparted rom oer Erato fr uso within the Ema of A a) ‘Compliance wth athe requirements of Seton I-2 i raquie for reel speci requrements for esch type as deal below. Approval Deparment foreach product variton, the adeona quenty, pt ove ‘uatycorrl and assurance procedures to be scopes bythe contractor. Verson 20 ‘Sesion 2 Novenberaov¢ Pogo 18 ‘STANDARD SPECIFICATIONS. 1302.10.01. Recycled Crushed Aggregate (RCA) Subbase ‘ne works desebed below shall cont of fumishing and placing one (1) or more layers of Recycled Crashes Aggregate (RCA), Including adetivos required, on 8 prepered surface in Sccordace with te Spciosons and in conory wh the ines, redo, nicknessos and ‘ype cross-sections shown onthe plans o stablshed by te Engines. ‘materiale Material shall conform to the feauements forthe cass of “Recycled Crushed Aggregate ‘Sobaue pectin onthe plane o rected bythe Engine. ARCA fr subbate mater shall ‘const of rshed rock and crushed coneet tne repent, clus sand Someones CA shall cori of clean har, durable, angus agents of rock, conte and sand trgments cof unorm quay compling wh the general rquroments specified in Physics Requrements' et Prusicl Reauiements [AERA subbese shal conform tothe physical requirements described below, Foreign matral nthe acon retained on the 475m seve shall not xc00d the percentages by mass specie: High density materia such 0 lass, bck and asphalt 10 etalic tem such a soe, lini and ron 7 ‘ow density materials such as plese, wbber, paste, ly] lumps and ther fib material Wood and other vgatabe or decomposable mater 07 ‘Grado and Test Reavlements RCA subse shat conform tho folowing requirements: (pom. a ew # Versonz0 Secon 2 Seis Page bate ae STANDARD SPECIFICATIONS Parameter ‘uit Lows by Abrasion Test AASHTO TOS6 40% maser gu Lint AASHTO To89 (ASTM D4918) 25% masrur Plastics Index AASHTO TO9O (ASTM 04318) 4% maximan Send Equant AASHTO T178 35% misma California Bearing Ratio st 96% MOD ~ AASHTOT199 | 120% mirimsm Sounines (Magnesium) = AASHTO T104 19% manu Flkiness -85 812 36% maximum Elongation =a 812 38% maxim ‘Sulphote Content 85 612 2% masa Chloride Content 85 812 2% man 2. Equipment Equipment shel be according to the type and number ouned in the Contactors detaled Programme of Work, as approved by the Engineer 2. ConsrstonReuaments Srontuter eis and Potion Te Cantor mat ela gh vate sO ng eft ro ‘str teaser natn Fan Gh spat ‘Sattm win rate offer» saat eee! on fob snore ey = Sn tates prover rovnwtr somig crac wih NCA Versi 20 Seaton Never 2044 Page dette es STANDARD SPECIFICATIONS Unless othe aubarade preparation called for an the plans or appears s @ pay tem inthe Bl of ‘Quanta, the Contractor shel, as pat af the Work ahd pret te deliver of nal forthe ‘subbase, propre the roadbed surface by spiking, blading, lig and ght scaring where ‘caesar, wl th proper crown i oblined However, tho pocoes of shaping the rosdbe, {he orgnaly compacted erst or top parton of th roadbed shat be disturbed as tees posse \Vinen completed and ready for subbase contusion be fosceed shall bo well compacted, ‘smooth, hard and unfor, a regulates having boon Biaded ut ae roled dow. Soceading ‘subbase RCA shal be spread onthe subgrade which has buen approved by the Enginet ‘Sobbase which hasbeen plaed ona eubgrage ra pprves by the Enginer shal be romoved. ‘Subbase RCA shal be spread on the approved subgrade in lyers not exceeding ten (15) Ccontetes in compacted depth, Where the requed subbesetheknass Is grater than feen (G5) centers, the matrlshollbe plsced In yor of equa thickness, ono ese shal a lyor ‘be less than seven and one hal (78) contetres thick. Unde no creumstances sal ubbase be tat the least aunt of war willbe let by evaporation fom uncompleted surfaces. Wate shal be apoted ot ‘5h times ane in such quate as crected bythe Eninsr, andthe Enginer shall have ul ‘auhoy fo requte the tuspanson of al other Works on the projet enue the proper mattanance of provousy compacted materi If ater he base e compactd, any areas are above or below proper grade and tv ovations, ‘sch areas shal be loosened sd after having ad aconal materials aed or excess mater ‘emoved, a he cate may require, shel be econsrused es doscbed hari. ater tho bas ‘completed, any reas fat met the specie’ danaty and gradation requiemerts, they shal be leosaned o removed as crecod bythe Enginer and recontcted ss desetbed een, Maintenance of fss6 Course aS, tzu summit ha ROA bas cats, 0 enemy ray ba Tarun ty Se ce Te Coit sass Son a apy fsa en ore eet fon og an oe oc ee eo c ee ae Se sci STANDARD SPECIFICATIONS. ‘ter surface is soled, Wlr shall be applied at such te and in such quan dected by the Engineer, ‘The Engineer shall dctarmina when the surface of the base eaurse sn the prperconciton 0 smite btuminous pene andr eutazing tobe appli If te Contactor ehoeeae not 0 SPO the bluminous prime andr surfacing atthe me, he must cordnue to malin De stare of he bse cours, inluting the epplcaton of necssary wale, a Ns expense unt uch te a the brurnous prime end surecng is appli 4. Minimum Test Requirements ‘The Contractor sal test the RCA and any soproved comgonents ta frequency which Is sulfcon 1 ensure thatthe mater! supplies under te contact comples win the spected Feguremeis. Th reqoency shal ot be aes tan hat show nthe Tae belo, oxen! hat the Enginaer may agree to lower frequency where the Contractor hat implmerted system cf ‘statistical process coil and can demansata tat such lower Fequoncy& adequate t arse ‘he qual ofthe procul. Minimum Frequency of Testing Grading ‘On each day ~one per 300 tones or pat hereof Foreign Maori Contant | On each day —one pe 300 tonnes or pat thereok ‘On ech day 3, Mette Contert | ona per 200 tonne o partheeot on each day Pasty index In each month — one por 5000 tonnes or pr herect Port the commencement of wok end when i the opinion of Calo Bearing Rat | Eaginger the nar ofthe mateal hae changed sgniienty fle Abrasion | 0% PS meth or when Inthe opinion of te Engineer the Los Angele Abrasion | ture ofthe mata has changed signtcaty Other oat As Instucted by tho Engnose (oras insucod bythe Engineer. 302.11 Measurement and Payment Mossurement fr agpregste subbase and bass courses wl be by calculated from the top surface area, excising the tapered edges, be ‘omit ses etn cigten and weed ne want manna Tab Pope 116 eons STANDARD SPECIFICATIONS Paymont for aggregate subbaso and base courss wil be made at the rato per square mete (of ‘hekress inated) cided inte Bal of Quaitos which ata sha inclu, tut nt by way of Tmtaten, all abou, tos, plant, mails, vanepor, meng, screening, sreadng, ot, compaction, shaping, leveling, esting and all eter tems necessary or he proper comsition af ‘he workin accocance with he Drawtge, psctiations ad nstuclon of he Egioo. No exaionl ayant wil be made by the Dopaniment for rpas o layers causd by was or rt cares, No adetonal payment wil bs made by the Department fer extra material proved inthe next, ‘courte fora dfcleney inthe ewce orbase cours, ‘ersin 20 ‘Sesten 2 Noveer2014 Page tat 16

You might also like