Professional Documents
Culture Documents
No Broad Classification
1
2
3
4
6
7
9
10
11
12
13
14
15
16
17
ACDB Panel-1&2 PO
ACDB Panel-1&2 Drawing Approval
ACDB Panel-1&2 Delivery at Site
ACDB Panel-1&2 Commissioning Job Work PO
ACDB Panel-1&2 Layout Apporved Drawing
Busduct-1&2 PO
Busduct-1&2 Drawing Approval
Busduct-1&2 Delivery at the Site
Busduct 1&2Commissioning Job Work PO
Busduct 1&2Laying Approved Drawing
Lighting Arrestor Strcuture Supply PO
Lighting Arrestor Structure Structure Drawing Apporval
Lighting Arrestor Structure Deliavery at Site
Lighting Arrestor Structure Erection Job Work PO
Lighting Arrestor Layout Approved Drawing
CT (R Phase,Y Phase,B Phase) Strcuture Supply PO
CT (R Phase,Y Phase,B Phase) Structure Drawing Approval
CT (R Phase,Y Phase,B Phase) Structure Deliavery at Site
CT (R Phase,Y Phase,B Phase) Structure Erection Job Work PO
CT (R Phase,Y Phase,B Phase) Layout Approved Drawing
SF6 Breaker Structure Supply PO
SF6 Breaker Structure Drawing Approval
SF6 Breaker Structure Delivery at the Site
SF6 Breaker Structure Commissioning Job Work PO
PT (R Phase,Y Phase,B Phase) Strcuture Supply PO
PT (R Phase,Y Phase,B Phase) Structure Drawing Apporval
PT (R Phase,Y Phase,B Phase) Structure Deliavery at Site
PT (R Phase,Y Phase,B Phase) Structure Erection Job Work PO
PT (R Phase,Y Phase,B Phase) Layout Approved Drawing
1250A Isolator Structure Supply PO
1250A Isolator Structure Drawing Approval
1250A Isolator Structure Delivery at the Site
1250A Isolator Structure Commissioning Job Work PO
1250A Isolator Structure Supply PO
1250A Isolator Structure Drawing Approval
1250A Isolator Structure Delivery at the Site
1250A Isolator Structure Commissioning Job Work PO
1250A Isolator Structure Supply PO
1250A Isolator Structure Drawing Approval
1250A Isolator Structure Delivery at the Site
1250A Isolator Structure Commissioning Job Work PO
1250A Isolator Structure Supply PO
1250A Isolator Structure Drawing Approval
1250A Isolator Structure Delivery at the Site
1250A Isolator Structure Commissioning Job Work PO
FG+FP Column Structure Supply PO
FG+FP Column Structure Drawing Approval
FG+FP Column Structure Delivery at the Site
FG+FP Column Structure Commissioning Job Work PO
FG+FP Column Structure Supply PO
FG+FP Column Structure Drawing Approval
FG+FP Column Structure Delivery at the Site
FG+FP Column Structure Commissioning Job Work PO
FB Beam Structure Supply PO
FB Beam Structure Drawing Approval
FB Beam Structure Delivery at the Site
FB Beam Structure Commissioning Job Work PO
FG+FP Column Structure Supply PO
FG+FP Column Structure Drawing Approval
FG+FP Column Structure Delivery at the Site
FG+FP Column Structure Commissioning Job Work PO
FF+FP Column Structure Supply PO
FF+FP Column Structure Drawing Approval
FF+FP Column Structure Delivery at the Site
FF+FP Column Structure Commissioning Job Work PO
FB Beam Structure Supply PO
FB Beam Structure Drawing Approval
FB Beam Structure Delivery at the Site
FB Beam Structure Commissioning Job Work PO
0.2 ACSR Conductor Supply PO
0.2 ACSR Conductor GTP Approval
0.2 ACSR Conductor Delivery at Site
0.2 ACSR Conductor Termination Job Work PO
Silicone Polymer Suspension Insulator Supply PO
Silicone Polymer Suspension Insulator GTP Approval
Silcione Polyme Suspension Insulator Conductor Delivery at Site
Silicone Polymer Suspension Insulator Installation PO
1250A Isolator Structure Supply PO
1250A Isolator Structure Drawing Approval
1250A Isolator Structure Delivery at the Site
1250A Isolator Structure Commissioning Job Work PO
3150A Isolator Structure Supply PO
3150A Isolator Structure Drawing Approval
3150A Isolator Structure Delivery at the Site
3150A Isolator Structure Commissioning Job Work PO
3150A Isolator Structure Supply PO
3150A Isolator Structure Drawing Approval
3150A Isolator Structure Delivery at the Site
3150A Isolator Structure Commissioning Job Work PO
Dead End Tower Foundation Drawing Approval
Finalization of Rerouting Plan of Dead End Tower
Dead End Tower Foundation Job Work PO
Dead End Tower Foundation Work Material Supply PO
Dead End Tower Foundation Work Material delivery at Site
Grid Isolation Permission Approval (2-3 Days)
Activities Deptt.
VCB Room Foundation Work Civil Deptt.
Earthing Wire Structure Foundation Work.
Transformer-1 Foundation and Rail Work (Bay-1)
Lighting Arresstor (R Phase) Foundation Work Bay-1
Lighting Arresstor (Y Phase) Foundation Work Bay-1
Lighting Arresstor (B Phase) Foundation Work Bay-1
CT (R Phase) Foundation Work Bay-1
CT (Y Phase) Foundation Work Bay-1
CT (B Phase) Foundation Work Bay-1
SF6 Breaker Foundation Work Bay-1
PT (R Phase) Foundation Work Bay-1
PT (Y Phase) Foundation Work Bay-1
PT (B Phase) Foundation Work Bay-1
1250A Isolator Foundation Work Bay-1 (Bay-1 Incomer)
Bus Post-1 Insualtor Foundation Work Bay-1
Bus Post-2 Insualtor Foundation Work Bay-1
Transformer-1 Foundation and Rail Work (Bay-1)
Transformer-2 Foundation and Rail Work (Bay-2)
Lighting Arresstor (R Phase) Foundation Work Bay-2
Lighting Arresstor (Y Phase) Foundation Work Bay-2
Lighting Arresstor (B Phase) Foundation Work Bay-2
CT (R Phase) Foundation Work Bay-2
CT (Y Phase) Foundation Work Bay-2
CT (B Phase) Foundation Work Bay-2
SF6 Breaker Foundation Work Bay-2
PT (R Phase) Foundation Work Bay-2
PT (Y Phase) Foundation Work Bay-2
PT (B Phase) Foundation Work Bay-2
1250A Isolator Foundation Work Bay-2 (Bay-2 Incomer)
Bus Post-3 Insualtor Foundation Work Bay-2
Bus Post-4 Insualtor Foundation Work Bay-2
FH+FP Column Foundation Work
FH+FP Column Foundation Work
FH+FP Column Foundation Work
FF+FP Column Foundation Work
FG+FP Column Foundation Work
FG+FP Column Foundation Work
FG+FP Column Foundation Work
PT (R Phase) Main ABT Meter Foundation Work
PT (Y Phase) Main ABT Meter Foundation Work
PT (B Phase) Main ABT Meter Foundation Work
CT (R Phase) Main ABT Meter Foundation Work
CT (Y Phase) Main ABT Meter Foundation Work
CT (B Phase) Main ABT Meter Foundation Work
PT (R Phase) Check ABT Meter Foundation Work
PT (Y Phase) Check ABT Meter Foundation Work
PT (B Phase) Check ABT Meter Foundation Work
CT (R Phase) Check ABT Meter Foundation Work
CT (Y Phase) Check ABT Meter Foundation Work
CT (B Phase) Check ABT Meter Foundation Work
Metering Room Foundation Work
FH+FP Column Foundation Work
FH+FP Column Foundation Work
1250A Isolator Foundation Work (Metering Area Incomer)
Bus Post Insulator-5 Foundation Work
3150A Pass-1 Isolator Foundation Work
ABB Pass-1 Foundation Work
FG+FP Column Foundation Work (Pass Area)
FG+FP Column Foundation Work (Pass Area)
FG+FP Column Foundation Work (Pass Area)
Wave Trap (R Phase) Foundation Work (Line-1)
Wave Trap (B Phase) Foundation Work (Line-1)
Coupling Capacitor (R Phase) Foundation Work (Line-1)
Coupling Capacitor (B Phase) Foundation Work (Line-1)
Lighting Arresstor (R Phase) Foundation Work (Line-1)
Lighting Arresstor (Y Phase) Foundation Work (Line-1)
Lighting Arresstor (B Phase) Foundation Work (Line-1)
3150A Pass-2 Isolator Foundation Work
ABB Pass-2 Foundation Work
Wave Trap (R Phase) Foundation Work (Line-2)
Wave Trap (B Phase) Foundation Work (Line-2)
Coupling Capacitor (R Phase) Foundation Work (Line-2)
Coupling Capacitor (B Phase) Foundation Work (Line-2)
Lighting Arresstor (R Phase) Foundation Work (Line-2)
Lighting Arresstor (Y Phase) Foundation Work (Line-2)
Lighting Arresstor (B Phase) Foundation Work (Line-2)
Bus Post Insulator-6 Foundation Work
Bus Post Insulator-7 Foundation Work
FH+FP Column Foundation Work
FH+FP Column Foundation Work
Bus PT Isolator 1250A Foundation Work
Bus PT (R Phase) Foundation Work
Bus PT (Y Phase) Foundation Work
Bus PT (B Phase) Foundation Work
LILO Room Foundation Work
Placing of Transformer-2 at the Foundation Work
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes