You are on page 1of 32

The kickoff point can be selected based on hole conditionsThe kickoff point

may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer
The kickoff point can be selected based on hole conditionsThe kickoff point
may be selected so that the build section will be cased at the end (selected
based on casing seat) It may be advantageous to drill a troublesome portion
of the well vertically and get it cased Directional drilling usually takes longer

You might also like