Professional Documents
Culture Documents
INSTALLATION MANUAL
Applied Machines: / /
<Important>
Be sure to correctly follow the procedures in order as explained in this Installation Manual.
If you do not follow the procedure in order, the image trouble may occur.
OC-513 DF-627
DK-512
When installing the machine and associated options as a system, follow the order shown on the upper.
Caution:
Lifting the machine in an awkward position or transporting it in a poorly balanced position could result in
personal injury. When transporting the machine, assign an adequate number of persons to the job and
ensure that each person can take a good position of not being excessively loaded.
(mass: approx. 71 kg (156-1/2 lb) (bizhub C281/C221), approx. 67.5 kg (148-7/8 lb) (bizhub C221s))
Note:
For the detailed installation procedures for each option, follow the instructions given in the corresponding
installation manual and perform the procedures correctly. (Optional devices must be installed after com-
pleting the main unit installation.)
Once the power switch is turned on, do not turn off it until the installation work has been completed.
To use this machine, install the Automatic Document Feeder or the original cover.
ZC018152A A6U9-9600-01
E-1
2. Installation space (unit: inch (mm)) 4. Accessory parts
bizhub C281/C221/C221s + DF-627 + DK-512 No. Name Qty
44-9/16 (1131.4)
1. Users guide holder 1
2. Quick start guide 1
25-5/16 19-1/4
(642.9) (488.5) 3. Installation manual 1 set
4. Users guide CD 1
5. CD-ROM 1 set
6. Paper size label 1
7. Label (Super G3 label) 1
8. Power cord * 1
9. Power cord instruction * 1
10. Screw * 1
11. Power cord clamp * 1
12. Network cable clamp 1
13. Duct 1
47-1/8 (1196.2) 14. Spacer 1
16-7/8 28-15/16
15. Waste toner box 1
(429.3) (734.3)
* Varies depending on the applicable marketing
area.
Note:
The part shown below is used when installing an
option. Keep it safe.
59-9/16 (1513.1)
E-2
5. Removing the machine 6. Removing protective tape, packing and
(1) Unpack and remove the machine package. other shipping materials
(2) Remove the machine, holding it by the locations
(1) Remove the protective tape and the protective
on the left side and the handles on the right side
materials.
as shown in the illustration and keeping it level.
Note:
Do not remove the gap sheet.
Caution:
Make available collective manpower of an appro-
priate size for transporting the machine.
Machine mass
bizhub C281/C221: approx. 71 kg/156-1/2 lb
bizhub C221s: approx. 67.5 kg/148-7/8 lb
Gap sheet
E-3
(2) Open the right door and remove the protective (4) Slide out the tray 1. Remove the protective tape
sheet and packaging materials. from the inside of the tray and remove accessory
Note: parts.
After removing the packaging materials, make
sure that the transfer roller assy is secured in
place. In the case of <NG>, press the transfer
roller assy into place so that it is secured as shown
in <OK>.
<OK> <NG>
E-4
(7) Remove the protective tape. (10) Release the lever of the drum unit. (One unit)
Protective tape
(8) Remove the protective tape from the developing (11) Slightly slide the drum unit out and remove the
unit. (Four pieces) protective tape and protective material.
Note:
Do not remove the tape A in this procedure.
Protective tape
E-5
7. Installing the toner cartridge (3) Push the toner cartridge all the way in and rotate
it clockwise to lock it.
Note: Note:
Since a toner cartridge is not supplied with the Make sure that the toner cartridge is pushed all the
machine, purchase one separately. way in.
(1) Shake the toner cartridge up and down and left
to right 5 to 10 times respectively.
Note:
Shake the cartridge adequately. Otherwise, it may
cause trouble.
E-6
(3) Plug the power cord into the power outlet. 12. Toner bottle type
Note:
Perform this setting according to the installed
toner bottle type.
(1) Select the Toner Bottle Type function as follows:
Image Process Adj Toner Bottle Type.
(2) Select CMY and then press the Select key.
(3) Select either Large Size or Small Size accord-
ing to the installed toner bottle type, and then
press the Select key.
(4) Select K and then press the Select key.
(5) Select either Large Size or Small Size accord-
ing to the installed toner bottle type, and then
press the Select key.
9. Toner supply
Turn on the power switch. 13. List output
Note: (1) Load the tray 1 with A4 or Letter paper.
Toner is automatically supplied in parallel with (2) Select PRINT MENU and press the Select
warm-up. key.
If a toner cartridge is not set, toner supply does (3) Select Management List and press the Select
not start. key.
(4) Select PRINT and press the Select key.
The list will be output.
10. Initial setting (5) Output Adjustment List in the same way.
(6) Output Parameter List in the same way.
(1) Turn on the power switch. (7) Press Stop/Reset key.
(2) Specify the initial setting in the following (8) Press Back key to exit the Service Mode.
sequence: Date Settings, Time Settings, TIME (9) Turn OFF and ON the power switch.
ZONE and Language Selection. Note:
When displayed the Service Mode screen, be sure
to turn off the power switch after exiting the Ser-
11. Install date vice Mode screen and wait for 10 seconds or more
before turning on.
(1) Display the Service Mode screen.
(For details of how to display the Service Mode
screen, see the service manual.)
(2) Select the Install Date function as follows: 14. Affixing the paper size label
System 1 Install Date. Affix the paper size labels that correspond to the
(3) Enter the data for the year, month, and day from sizes of paper used in each tray.
the 10-key pad.
(4) Press the Select key.
E-7
15. Check through test print (2) Peel the backing paper off the double-sided tape
on network cable clamp, and then attach it to the
Make operation checks by printing Configuration machine.
Page. (3) Route the cable through the clamp and secure
(1) Select the function to be used as follows: the cable to the machine.
REPORT/STATUS REPORT, and then press
the Select key.
The types of the test prints that can be printed
will be displayed.
(2) Select Configuration Page and press the
Select key.
(3) Select Print and then press the Select key.
Check that the machine produces the corre-
sponding printed page.
E-8
18. Installing the duct
Install the duct.
E-9
OC-513 Original Cover
INSTALLATION MANUAL
Applied Machines: bizhub C281/C221/C221s
COLOR MFP: 28 ppm/22 ppm
Product Code: A6U9/A6UA/A76A
2. Original mat
3. Shoulder screw
1
E-10
(3) Using a cleaning pad dampened with alcohol, (7) Open the original cover and press on the original
wipe the undersurface of the Automatic Docu- mat firmly so that it does not peel off.
ment Feeder, to which the original mat is
attached.
Spacer
E-11