DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE


OUTLINE
UnbondedandBondedPostTensioning
Comparison
UnbondedPostTensioning:
Systemsandequipment
Functionofthecoatedtendon
Construction
BondedPostTensioning:
Varioussystems,componentsandequipment
Functionofthegroutedtendon
Construction
PostTensioningApplications
UNBONDEDANDBONDEDPT
COMPARISON
UnbondedPostTensioning(PT)
Tendonisnotbondedtothesurroundingconcrete
PTforceistransmittedtothestructurebymeansofthe
anchorages.
BondedPostTensioning(PT)
Tendonisbondedtotheconcrete
Bondisachievedthroughoutthelengthofthetendon
byacementitious matrixcalledgrout.
Bondbetweenthestrandandtheconcreteisachieved
throughtheductaftergrouting
PTforceateverysectionisafunctionofthe
deformationoftheconcrete(straincompatibility)
UNBONDEDANDBONDEDPT
COMPARISON
Applications:bothsystemsareusedinbuildingandcivil
structures(bridges,containmentstructures,etc)
InUSA,unbondedismorecommoninbuildings
Bondedismorecommonincivilstructures
Bothsystemscanbeusedasexternalposttensioning
Performanceanddurability:bothsystemsprovide
comparablesatisfactoryresults
Selectionofasystemdependson:
Availability
Economics
Specificneedsofeachproject
MAJORCONSTRUCTABILITY
DIFFERENCES
Unbonded Bonded

Fabrication of tendons
in plant (extrusion &
Necessary Not necessary but possible
cutting to specific
length)
Very practical and
Very practical and flexible.
flexible. Easy to handle
Depending on application and
Placement and does not
system used, may require heavy
necessitate heavy
equipment and reduced flexibility
equipment

Grouting Not Applicable Necessary

Typically multi-strands with high


stressing forces.
Stressing Single strand stressing
Single strand stressing in specifc
systems
Straight forward (similar to regular
Demolition Requires special care
reinforcement)
UNBONDEDSYSTEMS
MonostrandPT
systems: Coated
Coatedstrand Strand

Coatedanchors
Encapsulation
accessories Grease Lockable
Cap Sleeve
Wedges

Coated
Wedge Anchor
UNBONDEDPTCOATED
STRAND
Theprocessofcoatingthe
strandiscalledextrusion
Coatedstrand Plastic Sheathing

7wirePCstrand:ultimate
strengthfpu=270ksi 7-Wire
Plasticsheathing:High Strand

DensityPolyethylene PT coating
(HDPE)orPolypropylene (Corrosion
inhibiting grease)
Tendon Section
(PP)
PTcoating:Corrosion
inhibitinggrease
UNBONDEDPTANCHORAGE
Encapsulatedanchorage
Preventwaterinfiltration
andcorrosion
Monostrandsteelanchor
coatedwithcorrosion
protection
Lockableencapsulation
sleeves
Encapsulationcaptocover
strandtails(ends)
Plasticpocketformer
STEELWEDGE
Wedgesareresponsibleof
lockingthestrandafter
stressingsoitholdstheforce
Wedgesaremadeofsteeland
haveductilecoretoadjustto
strandshapes
FUNCTIONOFSTRANDCOATING
Function of the PT coating
Allow a bond free movement of the strand
inside the sheathing.
Increase protection against corrosion and
provide a non-conductive environment for
corrosion
Reduce friction between the strand and
sheathing
Function of the sheathing
Provide corrosion protection to the strand
Provide encasement against damage and
moisture penetration
UNBONDEDPT
STRESSINGEQUIPMENT

MonostrandStressingJack

StressingPump Gauge
UNBONDEDPT
CONSTRUCTION
Tendonfabrication(PTI
certifiedplants)
Siteinstallation
Inspectionandconcrete
placement
Stressingoperation
UNBONDEDPTFABRICATION
Tendonextrusion
andcuttingtolength
Tendonbundling
Tendoncolorcoding
&labeling
Loadingandshipping
tosite
UNBONDEDPTINSTALLATION
Placingofformwork
Fixingofanchorsto
sideformwork
Installingchairsto
profileheightsshown
onPTdrawings
Installing
reinforcementandPT
tendons
UNBONDEDINSPECTIONAND
CONCRETECASTING
Inspectreinforcement
andPTinstallation
accordingtodrawings
Castconcrete
Thoroughvibration
aroundanchorages
AvoiddamagingPT
tendons
Propercuring
UNBONDEDPTSTRESSING
Removeedgeformwork
Preparetendonsfor
stressing
Checkachievedconcrete
strength
Stresstendonsusing
calibratedmonostrand
equipment
Filloutelongationrecords
Approveelongations
Sealtendonsandpatch
pockets
BONDEDPTSYSTEMS
Severalsystemsexistwithmaincomponentsbeing:
BareStrandsorBars
SteelAnchorageAssemblies(bearingplatesandwedgeplates);
proprietarydesigns
PlasticorGalvanizedMetalDucts
SteelWedges
Typicallymultistrands encasedingroutedduct
Bondedsystemsalsoknownasgroutedsystems
FUNCTIONOFGROUTED
DUCTS
Function of the duct
Maintain a voided path for strands
during construction
Transfer the bond between the grout &
the concrete
Act as additional corrosion protection
against penetration of moisture and
chemicals
Function of the grout
Provide a continuous bond between the
strand and the duct
Increase protection against corrosion
Provide a non-conductive environment
for corrosion
BONDEDPTSYSTEMS
Highcapacitymultistrandsystemsusedincivilstructuresand
transferbeamsorslabconstruction
Maincomponents
Barestrands
Multistrandanchorage
assembly
Roundcorrugatedduct Duct
Groutaccessories
(cap,shutoffvalves DeviationCone
vents,etc) (Optional)
Wedges
BearingPlate

WedgePlate
Wedges
BONDEDPTSYSTEMS
Flatsystemsusedtypicallyinthinconcreteelementsandslab
construction
Maincomponents
Barestrands
Multistrandanchorage
assembly
Flatcorrugatedduct Duct
Groutaccessories
(cap,venttubes,etc.) DeviationCone
Wedges (Optional)

BearingPlate
WedgePlate
Wedges
BONDEDPTSYSTEMS
Barsystems:
PTbar
Steelanchor
Duct
Groutaccessories
Monostrandgroutedsystem
Singlestrandanchor
Roundduct
Wedge
Groutaccessories
BONDEDPT
STRESSINGEQUIPMENT

StressingJack StrandPusher

StressingPump GroutingMachine
BONDEDPTCONSTRUCTION
Installation
Inspectionandconcreteplacement
Stressingoperation
Groutingoperation
BONDEDPTSYSTEMS
INSTALLATION
Placingofformworkandside
shutter
Fixingofbearingplates
Placingofductsand
reinforcement
Profilingductsaccordingto
Beam/BridgeConstruction
drapespecifiedonPT
installationdrawings
Placementofstrandsinside
duct(canbedonebeforeoraftercasting
ofconcrete)
SlabConstruction
INSPECTIONANDCONCRETE
PLACEMENT
Inspectreinforcement
andPTinstallation
accordingtoplacement
drawings
Castconcrete
Thoroughvibrationaround
bearingplates
AvoiddamagingPT
tendons
Propercuring
BONDEDPTSYSTEMS
STRESSING
Removeedgeformwork
Preparetendonsforstressing
Checkachievedconcretestrength
Stresstendonsusing
calibratedequipment
Fillupelongation
records
Approveelongations
BONDEDPTSYSTEMS
GROUTING
Checkductsfor
blockage
Groutandseal
tendons
Recordgrouting
results
Checkventsfor
groutadequacy
PTAPPLICATIONS:
2WAYSLABS

Photo Courtesy of Seneca Structural Engineering Inc.


PTAPPLICATIONS:TWOWAYSLABS
PTAPPLICATIONS:SLABSONGROUND

Ribbed Foundation
PTAPPLICATIONS:SLABSONGROUND

Uniform Thickness Foundation


PTAPPLICATIONS:MATFOUNDATIONS
PTAPPLICATIONS:INDUSTRIALFLOORS
PTAPPLICATIONS:PARKINGSTRUCTURES
PTAPPLICATIONS:GROUNDANCHORS
PTAPPLICATIONS:STORAGESTRUCTURES
PTAPPLICATIONS:BARRIERCABLE
PTAPPLICATIONS:STRENGTHENING

Photo courtesy of Seneca Structural Engineering


PTAPPLICATIONS:STRENGTHENING
PTAPPLICATIONS:SPLICEDGIRDERS

Photos courtesy of: