Professional Documents
Culture Documents
On
2*10 MVA 33/6.6kv Western Substation NCL , Nigahi
Project
Submitted
BACHELOR OF TECHNOLOGY
In
Electrical & Electronics Engineering
By
Roll No-1305421085
LUCKNOW
2013-2017
Table of contents
ACKNOWLEDGEMENT
i
CERTIFICATE
i
LIST OF FIGURES
iii
Transformer
12-15
Power transformer
Current transformer
Potential transformer
Autotransformer
Distribution transformer
Busbars
16
Circuit Breaker
17-20
Isolators
21
Insulator
22-23
Relay
24-26
Differential Relay
Overcurrent Relay
Earth Fault Relay
Tripping Relay
Auxillary Relay
Capacitor Bank
27
Protection of Substation
28-31
Bucholz Relay
Conservator and Breather
Marshelling Box
Conclusion
32
References
33
ACKNOWLEDGEMENT
Now, I would like to thank the people who guided me and have been a
constant source of inspiration throughout the tenure of my summer training .
Who accepted my request for training without any hesitation and patiently
answering my all queries for providing clarity to my cluttered thought. They
were instrumental in providing us good accommodation as well as very
successful training at NCL Nigahi Coal Sub-station.
Last but not the least I am extremely grateful to all the engineer and staff
members of Nigahi Substation 33/6.6KV who could find time in spite of their
busy schedule.
List of figures
Figure 8 Autotransformer
14
Figure 10 Busbar
16
Figure 11 Low voltage Circuit Breaker
17
Figure 12 Magnetic CB
17
Figure 15 Air CB
19
Figure 19 ISolaters
21