Cement Mills Inspection Report

Date:

Fault Removed
S.No. Fault Discription
Date

Leakage observed from oil gauges and bearing housing of Finish


1 30/12/2016
Mill Gear box (Slag Mill Side).

Leakage observed from oil gauges and bearing housing of Finish


2 30/12/2016
Mill Gear box (CCR Side).

3 Oil leakage from Pinion bearing (Slag Mill Side) oil gauges. 30/12/2016

Material dropping from Sides of Finish Mill Slag Hopper. Side scat
4 -
rubber required adjustment.

5 Material leakage from Finish Mill pipe. 30/12/2016

6 Fluidizing Fan filter cover required repair work (finish mill). 30/12/2016

Holes in suction Pipe line from Weigh feeders to classifier (Finish


7 -
Mill).
Oil Leakage from chain cover of Finish Mill Bag Filters Screw
8 Conveyor and dropping to floor. SC motors foundation required -
repair work.

9 Finish Mill Main Air slide inspection doors are not in good condition. -

10 Material Leakage from Finish mill Bag filter outlet Air Slides cover. -

11 Leakage observed from Finish Mill IDF bearings. 30/12/2016

Sprocket roller chain oil dropping on Belt conveyor dropping chute


12 -
(Finish Mill).

13 Material falling from sides of dropping chute. Cover required. -

Oil Leakage from chain cover of Slag mill Elevator roller chain and
14 -
dropping to floor. Foundation required repair work

Material leakage from Classifier Outlet Air Slides inspection door &
15 -
inlet chute. Repair work required (Slag Mill).

Leakage observed from Air slides cover joint. Material is shattered


16 -
on the floor. Proper sealing required (Slag Mill).
17 Holes in classifier suction pipe line (Slag Mill). -

WIP Work in progress

Jobs are informed to Cement Mills Area In-charge and Finish Mill Fitter, remaining jobs w
Note
when Mills are available
ills Inspection Report
24/12/2016

Remarks

OK

OK

OK

OK

OK

W.I.P

OK
n-charge and Finish Mill Fitter, remaining jobs will be carried out