NEW Biomass (Rs.per (Rs.per (Rs.per (Rs.per (Rs.per (Rs.per (Rs.per (Rs.per (Rs.per (Rs.per
Power Projects unit) unit) unit) unit) unit) unit) unit) unit) unit) unit)
Air Cooled
Condensors
(KERC ORDER NO:
OP NO 18/2013
Dated: 10th July
2014) 5.15 5.21 5.29 5.37 5.46 5.55 5.66 5.78 5.9 6.04
Water Cooled
condensors Validity
(KERC ORDER Period
Dated: 1st January is Upto
2015) 5.19 5.35 5.52 5.7 2018