KARNATAKA RENEWABLE ENERGY DEVELOPMENT LIMITED

TARIFF FOR RENEWABLE ENERGY PROJECTS IN KARNATAKA

Projects Approved Tariff in Rs/Unit


Wind 4.5
Small Hydro(Levelised over 35 year life of the project) 4.16
Solar
Solar Photo Voltaic 6.51
Solar Thermal 10.85
Approved Tariff in Approved Tariff in Rs/Unit
Capacity of Solar Rooftop and small Rs/Unit (Without Capital (With Capital Subsidy of
PV power plants Subsidy) 30%)
1 to 10kW 7.08 6.03
Above 10kW and upto 50kW 6.61 5.63
Above 50kW and upto 100kW 6.14 5.23
Above 100kW and upto 500kW 5.67 4.83
Above 500kW and upto 1MW. 5.2 4.43

1st Yr 2nd Yr 3rd Yr 4th Yr 5th Yr 6th Yr 7th Yr 8th Yr 9th Yr 10th Yr
NEW Biomass (Rs.per (Rs.per (Rs.per (Rs.per (Rs.per (Rs.per (Rs.per (Rs.per (Rs.per (Rs.per
Power Projects unit) unit) unit) unit) unit) unit) unit) unit) unit) unit)
Air Cooled
Condensors
(KERC ORDER NO:
OP NO 18/2013
Dated: 10th July
2014) 5.15 5.21 5.29 5.37 5.46 5.55 5.66 5.78 5.9 6.04
Water Cooled
condensors Validity
(KERC ORDER Period
Dated: 1st January is Upto
2015) 5.19 5.35 5.52 5.7 2018

Validity Period is Upto


1st Yr 2nd Yr 3rd Yr 4th Yr 2018
New Cogeneration Power
Projects(KERC ORDER
Dated: 1st January2015) 4.83 4.99 5.16 5.34

For Existing projects. Validity


KERC ORDER Dated: 22ND Period is
January 2015 2014-15 2015-16 2016-17 2017-18 Upto 2018
Exisiting Biomass Power
Projects 4.67 4.83 5 5.18
Exisitng Cogeneration Power
Projects 4.12 4.28 4.45 4.63

As on 15.07.2016