Professional Documents
Culture Documents
Test Procedure
ZXSDR LMT Offline Operation Test Procedure
LEGAL INFORMATION
By accepting this certain document of ZTE CORPORATION you agree to the following
terms. If you do not agree to the following terms, please notice that you are not allowed
to use this document.
Copyright 2015 ZTE CORPORATION. Any rights not expressly granted herein are
reserved. This document contains proprietary information of ZTE CORPORATION. Any
reproduction, transfer, distribution, use or disclosure of this document or any portion of
this document, in any form by any means, without the prior written consent of ZTE
CORPORATION is prohibited.
The design of this product complies with requirements of environmental protection and
personal security. This product shall be stored, used or discarded in accordance with
product manual, relevant contract or laws and regulations in relevant country
(countries).
ZTE CORPORATION
Addres NO. 55
s: Hi-tech Road South
ShenZhen
P.R.China
518057
Websit
http://dms.zte.com.cn
e:
Email: doc@zte.com.cn
TABLE OF CONTENTS
ZTE Confidential Proprietary 2011 ZTE Corporation. All rights reserved. 2
ZXSDR LMT Offline Operation Test Procedure
TS01 LMT Offline login......................................................................................................4
TS01-1 LMT Offline login.....................................................................................................4
3. Browse the local disk to choose an appropriate software version and click Open.
LoadTool Interface reappears, as shown fellow:
4.Select the added version for Version. Click Run Version to open the interface as
shown in
5.Select a template file or a configuration file saved in local hard disk. Click Open.