Professional Documents
Culture Documents
RULE X POST-QUALIFICATION
Section 34. Objective and Process of Post-Qualification
Section 35. Failure of Bidding
Section 36. Single Calculated/Rated and Responsive Bid Submission
Section 54. Terms and Conditions for the use of Alternative Methods
ANNEX A
DETAILED ENGINEERING FOR THE PROCUREMENT OF
INFRASTRUCTURE PROJECTS
ANNEX B
GENERAL PRINCIPLES ON CONSULTING SERVICES
ANNEX C
RECOMMENDED EARLIEST POSSIBLE TIME AND MAXIMUM PERIOD
ALLOWED FOR THE PROCUREMENT OF GOODS AND SERVICES
ANNEX D
CONTRACT IMPLEMENTATION GUIDELINES FOR THE PROCUREMENT
OF GOODS, SUPPLIES AND MATERIALS
ANNEX E
CONTRACT IMPLEMENTATION GUIDELINES FOR THE PROCUREMENT
OF INFRASTRUCTURE PROJECTS
ANNEX F
CONTRACT IMPLEMENTATION GUIDELINES FOR THE PROCUREMENT
OF CONSULTING SERVICES
ANNEX G
GUIDELINES FOR THE PROCUREMENT AND IMPLEMENTATION OF
CONTRACTS FOR DESIGN AND BUILD INFRASTRUCTURE PROJECTS
ANNEX H
CONSOLIDATED GUIDELINES
FOR THE ALTERNATIVE METHODS OF PROCUREMENT
ANNEX H
APPENDIX A
DOCUMENTARY REQUIREMENTS FOR
ALTERNATIVE METHODS OF PROCUREMENT
ANNEX H
APPENDIX B
LEASE OF REAL PROPERTY AND VENUE:
RATING FACTORS AND
DETERMINATION OF REASONABLENESS OF RENTAL RATES
ANNEX I
GUIDELINES ON TERMINATION OF CONTRACTS