You are on page 1of 8

UNIVERSITI TEKNOLOGI MARA

FACULTY OF ARCHITECTURE, PLANNING AND SURVEYING


DEPARTMENT OF SURVEYING SCIENCE AND GEOMATIC

HYDROGRAPHIC SURVEY AND FIELD DATA COLLECTION FOR PROPOSED


BRIDGE FROM PANTAI MERDEKA TO TANJUNG DAWAI

PREPARED BY:
MOHAMAD RIDZUAN BIN MOHAMED TALHAH
2008369127
AP120

SEPTEMBER 2011
Hydrographic Survey and Field Data Collection For
Proposed Bridge From Pantai Merdeka To Tanjung Dawai

Industrial Training Report

Delivered to meet the Award of Terms


Diploma in Geomatic Science
Department of Surveying Science and Geomatics
Faculty of Architecture, Planning and Surveying
Universiti Teknologi MARA Perlis

Prepared By:
MOHAMAD RIDZUAN BIN MOHAMED TALHAH
2008369127

SEPTEMBER 2011
A project report submitted in partial fulfillment of the
requirement for the award of the
Diploma in Geomatic Science
Candidates Declaration

I declare that this report entitled Hydrographic Survey and Field Data Collection for
Proposed Bridge from Pantai Merdeka to Tanjung Dawai is the result of my own works
except as cited in the references. The report has not been accepted for any diploma and
is not concurrently submitted in candidature of any other diploma.

Name of Candidate: Mohamad Ridzuan Bin Mohamed Talhah


Candidates ID No.: 2008369127
Programme : AP120
Faculty : Faculty of Architecture, Planning and Surveying

Signature of Candidate ...


Date ...
This Report Delivered to Department of Surveying Science and Geomatics
Faculty of Architecture, Planning and Surveying
Universiti Teknologi MARA Perlis
As Fullfill the Requirement to Awarded
Diploma in Geomatic Science AP120

Date:

Date:
ABSTRACT

Hydrography survey is a survey that was carries out to measure the depth of the
ocean. This survey is carrying out by using DGPS where it has replaced the using of
total station. We also just need to control the boat by using the monitor that was located
in our boat. Then, we could measure the depth on every sounding line that we had
created. But, before we do the depth measurement, we also need to do the tide reading,
traverse, leveling and detailing.
Tide reading is be done by refer to the benchmark at the jetty. Then, from that,
we could get the reduce depth. Traverse is done by referring to the planimetric control,
where the PM1, PM2 and PM3 are use as reference at Pantai Merdeka and TD2, TD3
and TD4 are use as reference at Tanjung Dawai. The detailing will be done on the
traverse station where it is involve 200m from the watermark and edge at 50m spacing
at Pantai Merdeka and 50m from the watermark and edge at 50m spacing at Tanjung
Dawai. Besides that, leveling also is done to get the height for every station.
All the data need to be process in HydroPro,Terramodel, CDS, and AutoCad. The
final result that will appear is Bathymetric Plan.
ABSTRAK

Hydrography Survey adalah satu kerja ukur yang dijalankan untuk mengukur
kedalaman laut. Pengukuran ini dilakukan dengan menggunakan DGPS dimana ia
menggantikan Total Station. Kita juga hanya perlu mengawal bot dengan berpandukan
skrin yang yang diletakkan di dalam bot. Kemudian, kita boleh mengukur kedalaman laut
berdasarkan sounding line yang telah kita reka. Selain mengukur kedalaman laut, kita
juga perlu merekodkan bacaan pasang surut, traverse, levelling and detailing.
Bacaan pasang surut dilakukan dengan berpandukan benchmark yang terdapat
di jeti. Melalui itu, kita boleh mendapatken reduce depth. Traverse pula dijalankan
dengan berpandukan planimetric control, dimana PM1, PM2 dan PM3 dijadikan sebagai
panduan di Pantai Merdeka dan TD2, TD3 dan TD4 dijadikan sebagai panduan di
Tanjung Dawai. Detailing pula dilakukan pada stesen traverse dimana detail perlu
dilakukan sekitar 200m bermula dari gigi air pada jarak 50m setiap detail di Pantai
Merdeka dan 50m bermula dari gigi air pada jarak 50m setiap detail di Tanjung Dawai.
Selain itu , levelling juga perlu dilakukan untuk mendapatkan ketinggian pada setiap
stesen.
Kesemua data akan diproses dalam HydroPro, Terramodel, CDS dan AutoCad.
Hasil akhir yang perlu dihasilkan adalah pelan Bathymetric.
ACKNOWLEDGEMENT

Assalamualaikum,

Alhamdulillah, firstly I would like to thank to Allah as giving me strength to complete and
finish this practical training successfully which were compulsory to all final year students
of Diploma in Geomatic Science (AP 120 ).

I also like to thank to all lecturers and staffs of Department of Surveying and Geomatics,
MARA University of Technology, Perlis which were helping me a lot since I was become
a Geomatic student.

Then a bunch of thanks I forward to En. Senu, En Tengku and Puan Norzalainee for their
guidance and advice to do this report. We have learnt many things in this period.

Lastly, I also like to thank to the entire person who directly and indirectly involved in this
practical training especially to my parents and friends in supporting me to complete this
work. Only God would repay your kindness.