You are on page 1of 8

Document Control

Document Details

Project IMPACT

Status / Version Draft


Business Process Scope Local
Reference Code NL_PDD-PP.01.02.03 BOM
Disclaimer

If you are reading a copy of this document (i.e. print out of controlled electronic document or an electronic
copy of a wet ink signed paper document) you may be reading an uncontrolled version. Before making
updates, please ensure that you are using the latest version.

Document Approval / Review


Name &
Criteria Signature Date Remarks
Role
Amit
Prepared By (IBM Consultant) 13.05.2014
Aggarwal

Apollo Review (Core Team Member)

IBM Project Lead Review

Apollo Project Lead Review

Apollo Global Process Owner


Review

Apollo Local Process Owner Review

Page 1 of 8
Version Control

Description
Version Date Author Remarks
of Changes

Draft
1.0.0 13.05.2014 Amit Aggarwal
Preparation

Document Scope

Document Scope Details

Organization Apollo Tyres Limited

India SA Thailand Dubai Netherlands


Locations
X

Process Scope This document describes process for BOM creation in AVBV

Scope Exclusion

Page 2 of 8
1. INTRODUCTION..................................................................................................................................... 4
1.1. WHAT IS THE BUSINESS BLUEPRINT?.................................................................................................. 4
1.2. DOCUMENT AVAILABILITY.................................................................................................................... 4
1.3. DOCUMENT SIGN OFF........................................................................................................................ 4
2. PROCESS DESCRIPTION...................................................................................................................... 5
2.1. SUMMARY.......................................................................................................................................... 5
2.2. KEY EXPECTATIONS........................................................................................................................... 5
3. PROCESS DESIGN IN SAP...................................................................................................................... 5
3.1. BUSINESS PROCESS DESCRIPTION..................................................................................................... 5
3.2. BUSINESS PROCESS STEP: BOM CREATION........................................................................................ 6
3.3. BUSINESS PROCESS FLOW MAP: BOM CREATION PROCESS................................................................6
4. KEY DATA ELEMENTS (KDS).................................................................................................................. 6
5. INTEGRATION POINT............................................................................................................................... 6
6. INTERFACES.......................................................................................................................................... 6
7. GAPS AND SOLUTIONS........................................................................................................................... 7
8. REPORTING REQUIREMENTS.................................................................................................................. 7
9. DATA MIGRATION/CONVERSION................................................................................................................ 7
10. AUTHORIZATION................................................................................................................................. 7

Page 3 of 8
1. Introduction

1.1. What is the Business Blueprint?

The purpose of this document is to document To-Be design of Apollo business processes. The blueprint
also finalizes the detailed scope of the project.

1.2. Document Availability

This document is readily available to all people on the project for understanding and can access through the
controlled environment as well as through a hard copy.

1.3. Document Sign Off

Business Blue Print Document will be submitted to process owners for final sign off. Process owners are
requested to respond within three (3) business days from the date of submission, after which a discussion
on the changes required will be initiated. The document must be signed-off within five (5) business days
after the same is submitted to the process owner for the first time. If no response is received from the
Process Owner within five (5) business days, then the document will be deemed signed-off.

Page 4 of 8
Page 5 of 8
2. Process Description
2.1. Summary

This process covers the creation of multi level BOM of Finished Product and includes
the list of components with quantity required to produce the parent material.

2.2. Key Expectations


BOM should be available in the system for Planning and tracking the inventory
at various manufacturing stages.

3. Process Design in SAP

3.1. Business Process Description


BOM is a comprehensive list of components maintained hierarchically for a
product to be produced in a logical manner.

There are many levels in BOM for Apollo Group to keep track of critical
inventory points.

The BOM is exploded and the dependent requirements are determined within
Material Requirement Planning during the planning run, after the system has
performed the procurement quantity calculation, lot-size calculation and
scheduling.

The BOM for a material can be created with multiple BOM Usage which defines
the area (such as, production or costing etc) where a BOM can be used.For
Apollo Group , Production BOM is used.

Component Scrap defined in BOM is the percentage of scrap that occurs during
production of the parent material. Component scrap is used in material
requirements planning (MRP) to determine the quantities of components
required. When exploding the bill of material (BOM), the system increases the
required quantities of the components by the calculated scrap quantity. If
component scrap has been entered in the BOM, this value applies; otherwise,
the value specified in the material master record is used.

Scrap material code can also be incorporated in BOM with ve quantity so that
during production confirmation, scrap can be receipted automatically along
with production confirmation.

Alternate items can also be maintained in a BOM. The discontinuation


functionality is used to transfer dependent requirements of a component to one
or several follow-up materials, if the requirements are no longer covered by
stock.Follow-up material can be defined in the bill of material.

Page 6 of 8
Alternate BOM can also be made for single parent material.SAP allows for the
creation of maximum 99 BOMs. Alternative Boms can be created depending
upon the business case.

INTERSPEC to SAP interface

Following data elements are required from INTERSPEC to create BOM in SAP.

S NO. Data Elements


1 Parent Material
Parent Material Base
2
quantity
3 Child material Code
4 Child material quantity
5 Scrap % factor

3.2. Business Process Step: BOM creation


NA

3.3. Business Process Flow Map: BOM creation Process

NA

4. Key Data Elements (KDS)

S. No. Key Data Structure Key Data Structure Reference


1 NA

5. Integration Point

S. Description Identification/PDD Reference


No.
1 NA

Page 7 of 8
6. Interfaces

S. Description Identification
No.
1 INTERSPEC to SAP

7. Gaps and Solutions

SL No Gaps Workaround Enhancement


Not Applicable

8. Reporting Requirements

S. Description Standard T Code /


No. SAP/Development Dveloppent
Rfrence No.
1 BOM Level by Level Standard CS11
2 Multilevel BOM Display Standard CS12
3 Summarized BOM Standard CS13
4 Where used List Standard CS15

9. Data migration/conversion