You are on page 1of 35

BEAR CREEK MINING CORPORATION

ESTUDIO HIDROGEOLGICO DEL PROYECTO DE EXPLORACIN TASSA

CUADRO A. RESUMEN DE DISPONIBILIDAD DE DATOS POR VARIABLE EMPLEADA EN EL ESTUDIO HIDROLOGICO

PARAMETRO: PRECIPITACION TOTAL MENSUAL PMAX 24H TEMP. MAX. MEDIA MENSUAL TEMP. MIN. MEDIA MENSUAL TEMP. MEDIA MENSUAL

ESTACION: UBINAS UBINAS UBINAS

ALTITUD: (msnm) 3370 3370 3370

CUENCA/SUB CUENCA: RIO TAMBO RIO TAMBO RIO TAMBO


FUENTE: SENAMHI SENAMHI SENAMHI
1990 X X X X X
1991 X X X X X
1992 X X X X X
1993 X X X X X
1994 X X X X X
1995 X X X X X
1996 X X X X X
1997 X X X X X
1998 X X X X X
1999 X X X X X
2000 X X X X X
2001 X X X X X
2002 X X X X X
2003 X X X X X
2004 X X X X X
2005 X X X X X
2006
2007 X X X X X
2008 X X X X X
2009 X X X X X
2010 X X X X X
BEAR CREEK MINING CORPORATION
ESTUDIO HIDROGEOLGICO DEL PROYECTO DE EXPLORACIN TASSA

Cuadro C.1 ESTACION UBINAS - ANALISIS FINAL


LATITUD: 16 22' S DPTO. : MOQUEGUA
LONGITUD: 70 51' W PROV. : GENERAL SANCHEZ
ALTITUD: 3370 m.s.n.m. DIST. : UBINAS

REGISTRO DE PRECIPITACION TOTAL MENSUAL (mm)

AO ENE FEB MAR ABR MAY JUN JUL AGO SET OCT NOV DIC TOTAL
1990 51.8 18.8 42.1 1.5 2.2 33.4 0.0 0.0 0.0 1.2 47.1 105.1 303.2
1991 61.2 54.9 114.3 12.6 0.0 18.2 0.0 0.0 0.0 0.0 10.0 13.5 284.7
1992 4.7 1.5 0.0 0.2 0.0 7.0 0.0 2.1 0.0 10.3 12.5 53.8 92.1
1993 134.2 15.8 53.0 7.1 0.0 0.0 0.0 21.1 0.0 14.0 1.5 29.1 275.8
1994 84.5 130.0 8.4 32.2 10.9 0.0 0.0 0.0 0.0 0.0 2.6 26.8 295.4
1995 43.3 11.9 114.9 3.1 3.4 0.0 0.0 0.0 4.5 0.3 9.3 31.1 221.8
1996 63.4 97.9 17.2 13.9 1.7 0.0 0.0 1.8 0.0 0.0 12.3 44.1 252.3
1997 110.0 151.3 44.4 3.5 0.0 0.0 0.5 32.0 42.5 0.0 11.7 51.7 447.6
1998 153.7 23.9 27.4 18.4 0.0 2.4 0.0 0.0 0.0 0.0 11.4 36.3 273.5
1999 32.4 164.9 157.1 29.6 0.0 0.0 0.0 0.0 11.9 16.8 0.0 24.3 437.0
2000 137.5 117.7 56.2 10.6 3.8 0.3 0.0 0.0 0.0 14.7 0.0 40.3 381.1
2001 119.5 206.7 99.8 18.3 0.1 0.5 0.0 0.6 0.0 6.9 0.0 7.4 459.8
2002 72.0 131.5 98.2 24.0 1.0 0.3 29.9 0.0 0.0 0.0 22.9 27.6 407.4
2003 39.9 62.7 45.9 6.5 13.9 0.0 0.0 10.0 0.0 0.0 0.0 37.6 216.5
2004 78.8 90.0 31.2 20.0 0.0 0.0 14.1 4.0 0.0 0.0 0.0 23.2 261.3
2005 67.5 101.4 32.7 10.6 0.0 0.0 0.0 0.0 9.0 0.0 0.0 22.6 243.8
2007 111.5 71.6 110.3 16.0 0.0 1.1 0.0 0.0 0.0 0.0 5.8 20.7 337.0
2008 161.1 65.2 41.4 0.0 0.0 0.0 0.0 0.5 0.0 0.0 0.0 41.0 309.2
2009 33.5 99.8 49.0 14.0 0.0 0.0 6.0 0.0 6.9 0.0 7.3 5.1 221.6
2010 37.0 51.3 23.9 8.2 4.1 0.0 0.0 0.0 0.0 3.4 8.1 33.8 169.8
PROM 79.88 83.44 58.37 12.52 2.06 3.16 2.53 3.61 3.74 3.38 8.13 33.75 294.54
DESV. STA 44.88 56.11 42.45 9.30 3.83 8.28 7.26 8.38 9.78 5.77 11.11 21.24 95.41
MAX. 161.1 206.7 157.1 32.2 13.9 33.4 29.9 32.0 42.5 16.8 47.1 105.1 459.8
MIN. 4.7 1.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 5.1 92.1
Fuente: SENAMHI (1990 - 2010) Limite por encima del cual se hallan los aos humedos: 348.0
Limite por debajo del cual se hallan los aos secos: 238.3
BEAR CREEK MINING CORPORATION
ESTUDIO HIDROGEOLGICO DEL PROYECTO DE EXPLORACIN TASSA

CUADRO C.1.1. ESTACION UBINAS - RESUMEN AOS HUMEDOS


ENE FEB MAR ABR MAY JUN JUL AGO SET OCT NOV DIC TOTAL
PROM 94.28 154.42 91.14 17.20 0.98 0.22 6.08 6.52 10.88 7.68 6.92 30.26 426.58
DESV. STA 42.06 34.37 44.39 10.40 1.63 0.22 13.32 14.25 18.41 7.92 10.27 16.78 31.98
MAX. 137.5 206.7 157.1 29.6 3.8 0.5 29.9 32.0 42.5 16.8 22.9 51.7 459.8
MIN. 32.4 117.7 44.4 3.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 7.4 381.1

CUADRO C.1.2. ESTACION UBINAS - RESUMEN AOS SECOS


ENE FEB MAR ABR MAY JUN JUL AGO SET OCT NOV DIC TOTAL
PROM 31.68 45.44 46.74 6.40 4.28 1.40 1.20 2.42 2.28 2.80 7.45 32.27 184.35
DESV. STA 15.51 39.82 42.89 5.25 5.70 3.13 2.68 4.33 3.24 4.43 4.61 17.56 56.01
MAX. 43.3 99.8 114.9 14.0 13.9 7.0 6.0 10.0 6.9 10.3 12.5 53.8 221.8
P re cip ita cio n to ta l m e n su a l (m m )

MIN. 4.7 1.5 0.0 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 5.1 92.1

C.1.1 Variacion de la precipitacin total mensual - Quebrada Tassa


180.00

160.00

140.00

120.00

100.00

80.00

60.00

40.00

20.00

0.00
ENE FEB MAR ABR MAY JUN JUL AGO SET OCT NOV DIC
AO HUMEDO AO S ECO
BEAR CREEK MINING CORPORATION
ESTUDIO HIDROGEOLGICO DEL PROYECTO DE EXPLORACIN TASSA

P re cipita cion tota l m e nsua l (m m )

C.1.2 Variacion de la precipitacin total mensual - Quebrada Tassa


250.0

200.0

150.0

100.0

50.0

0.0
ENE FEB MAR ABR MAY JUN JUL AGO SET OCT NOV DIC
PROM MAX. MIN.
BEAR CREEK MINING CORPORATION
ESTUDIO HIDROGEOLGICO DEL PROYECTO DE EXPLORACIN TASSA

P re cip ita cio n to ta l m e n su a l (m m )

C.1.3 Variacion de la precipitacin total anual - Quebrada Tassa


500.0

450.0

400.0

350.0

300.0

250.0

200.0

150.0

100.0

50.0

0.0
1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2007 2008 2009 2010
BEAR CREEK MINING CORPORATION
ESTUDIO HIDROGEOLGICO DEL PROYECTO DE EXPLORACIN TASSA

Cuadro D.1.1 PRECIPITACION TOTAL MENSUAL EN EL AREA DEL PROYECTO -


AOS PROMEDIOS

P
MES
mm
ENE 79.9
FEB 83.4
MAR 58.4
ABR 12.5
MAY 2.1
JUN 3.2
JUL 2.5
AGO 3.6
SET 3.7
OCT 3.4
NOV 8.1
DIC 33.8

Cuadro D.1.2 PRECIPITACION TOTAL MENSUAL EN EL AREA DEL PROYECTO -


AOS HUMEDOS

P
MES
mm
ENE 94.3
FEB 154.4
MAR 91.1
ABR 17.2
MAY 1.0
JUN 0.2
JUL 6.1
AGO 6.5
SET 10.9
OCT 7.7
NOV 6.9
DIC 30.3

Cuadro D.1.3 PRECIPITACION TOTAL MENSUAL EN EL AREA DEL PROYECTO -


AOS SECOS

P
MES
mm
ENE 31.7
FEB 45.4
MAR 46.7
ABR 6.4
MAY 4.3
JUN 1.4
JUL 1.2
AGO 2.4
SET 2.3
OCT 2.8
NOV 7.4
DIC 32.3
BEAR CREEK MINING CORPORATION
ESTUDIO HIDROGEOLGICO DEL PROYECTO DE EXPLORACIN TASSA

Cuadro E.1 DATOS DE PRECIPITACIN MXIMA EN 24 HORAS *

ESTACION
N AO UBINAS
mm
1 1990 29.5
2 1991 39.0
3 1992 14.1
4 1993 25.4
5 1994 30.8
6 1995 38.4
7 1996 30.5
8 1997 27.2
9 1998 33.0
10 1999 37.3
11 2000 24.9
12 2001 39.3
13 2002 23.5
14 2003 20.5
15 2004 30.1
16 2005 35.9
17 2007 22.5
18 2008 20.8
19 2009 21.5
20 2010 15.6
Numero de datos n 20
Promedio x 28.0
Desviacion estndar s 7.7
Coeficiente asimetria Cs -0.07

* Los datos fueron corregidos por el factor 1.13 que relaciona la variacion existente entre la P max diaria y
P max instantanea (WMO, 1973)
BEAR CREEK MINING CORPORATION
ESTUDIO HIDROGEOLGICO DEL PROYECTO DE EXPLORACIN TASSA

Cuadro E.1.1 ESTACION UBINAS


LAT. : 16 22' S DPTO : MOQUEGUA
LONG. : 70 51' W PROV : GENERAL SANCHEZ
ALT. : 3370 m.s.n.m. DIST. : UBINAS

REGISTRO DE PRECIPITACION MAXIMA EN 24 HORAS (mm)

AOS PMAX24
1990 26.1
1991 34.5
1992 12.5
1993 22.5
1994 27.3
1995 34.0
1996 27.0
1997 24.1
1998 29.2
1999 33.0
2000 22.0
2001 34.8
2002 20.8
2003 18.1
2004 26.6
2005 31.8
2007 19.9
2008 18.4
2009 19.0
2010 13.8
PROM 24.8
DESV. STA 6.8
MAX 34.8
MIN 12.5
Fuente: SENAMHI
BEAR CREEK MINING CORPORATION
ESTUDIO HIDROGEOLGICO DEL PROYECTO DE EXPLORACIN TASSA

Cuadros E.2 ESTACION UBINAS - Prueba de bondad Smirnov Kolmogorov

E.2.1.1 DISTRIBUCION NORMAL - Momentos lineales


m X P(X) F(Z) Ordinario F(Z) Mom Lineal Delta
1 14.1 0.0476 0.0350 0.0406 0.0070
2 15.6 0.0952 0.0530 0.0599 0.0353
3 20.5 0.1429 0.1642 0.1736 0.0307
4 20.8 0.1905 0.1741 0.1834 0.0071
5 21.5 0.2381 0.1986 0.2076 0.0305
6 22.5 0.2857 0.2369 0.2454 0.0403
7 23.5 0.3333 0.2790 0.2865 0.0468
8 24.9 0.3810 0.3434 0.3491 0.0319
9 25.4 0.4286 0.3677 0.3726 0.0560
10 27.2 0.4762 0.4590 0.4605 0.0157
11 29.5 0.5238 0.5781 0.5752 0.0514
12 30.1 0.5714 0.6084 0.6044 0.0330
13 30.5 0.6190 0.6283 0.6236 0.0046
14 30.8 0.6667 0.6430 0.6378 0.0288
15 33.0 0.7143 0.7433 0.7353 0.0210
16 35.9 0.7619 0.8490 0.8396 0.0777
17 37.3 0.8095 0.8877 0.8787 0.0692
18 38.4 0.8571 0.9128 0.9043 0.0472
19 39.0 0.9048 0.9246 0.9165 0.0118
20 39.3 0.9524 0.9300 0.9221 0.0302
DELTA TEORICO = 0.0777

E.2.1.2 DISTRIBUCION LOG NORMAL 2 PARAMETROS - Momentos lineales


m X P(X) F(Z) Ordinario F(Z) Mom Lineal Delta
1 14.1 0.0476 0.0143 0.0160 0.0316
2 15.6 0.0952 0.0325 0.0352 0.0600
3 20.5 0.1429 0.1785 0.1833 0.0404
4 20.8 0.1905 0.1916 0.1964 0.0059
5 21.5 0.2381 0.2236 0.2282 0.0099
6 22.5 0.2857 0.2722 0.2762 0.0095
7 23.5 0.3333 0.3231 0.3264 0.0070
8 24.9 0.3810 0.3962 0.3982 0.0172
9 25.4 0.4286 0.4223 0.4238 0.0047
10 27.2 0.4762 0.5142 0.5139 0.0378
11 29.5 0.5238 0.6219 0.6195 0.0957
12 30.1 0.5714 0.6475 0.6447 0.0732
13 30.5 0.6190 0.6639 0.6608 0.0418
14 30.8 0.6667 0.6759 0.6726 0.0060
15 33.0 0.7143 0.7548 0.7505 0.0362
16 35.9 0.7619 0.8352 0.8303 0.0684
17 37.3 0.8095 0.8652 0.8604 0.0509
18 38.4 0.8571 0.8854 0.8807 0.0236
19 39.0 0.9048 0.8953 0.8907 0.0141
20 39.3 0.9524 0.8999 0.8953 0.0570
DELTA TEORICO = 0.0957
BEAR CREEK MINING CORPORATION
ESTUDIO HIDROGEOLGICO DEL PROYECTO DE EXPLORACIN TASSA

ESTACION UBINAS - Prueba de bondad Smirnov Kolmogorov (continuacion 2)

E.2.1.3 DISTRIBUCION GAMMA 2 PARAMETROS - Momentos lineales


m X P(X) G(Y) Ordinario G(Y) Mom Lineal Delta
1 14.1 0.0476 0.0172 0.0818 0.0342
2 15.6 0.0952 0.0345 0.1175 0.0223
3 20.5 0.1429 0.1662 0.2742 0.1313
4 20.8 0.1905 0.1782 0.2852 0.0947
5 21.5 0.2381 0.2079 0.3111 0.0730
6 22.5 0.2857 0.2537 0.3489 0.0632
7 23.5 0.3333 0.3027 0.3870 0.0536
8 24.9 0.3810 0.3749 0.4402 0.0593
9 25.4 0.4286 0.4013 0.4591 0.0305
10 27.2 0.4762 0.4963 0.5253 0.0492
11 29.5 0.5238 0.6114 0.6048 0.0810
12 30.1 0.5714 0.6394 0.6243 0.0529
13 30.5 0.6190 0.6574 0.6370 0.0179
14 30.8 0.6667 0.6706 0.6463 0.0203
15 33.0 0.7143 0.7581 0.7103 0.0040
16 35.9 0.7619 0.8472 0.7818 0.0199
17 37.3 0.8095 0.8800 0.8112 0.0017
18 38.4 0.8571 0.9016 0.8320 0.0251
19 39.0 0.9048 0.9119 0.8426 0.0622
20 39.3 0.9524 0.9167 0.8477 0.1047
DELTA TEORICO = 0.1313

E.2.1.4 DISTRIBUCION LOG PEARSON TIPO III - Momentos lineales


m X P(X) G(Y) Ordinario G(Y) Mom Lineal Delta
1 14.1 0.0476 0.0000 0.0002 0.0474
2 15.6 0.0952 0.0000 0.0068 0.0885
3 20.5 0.1429 0.0000 0.1895 0.0467
4 20.8 0.1905 0.0000 0.2072 0.0167
5 21.5 0.2381 0.0000 0.2493 0.0112
6 22.5 0.2857 0.0000 0.3104 0.0247
7 23.5 0.3333 0.0000 0.3708 0.0375
8 24.9 0.3810 0.0000 0.4514 0.0704
9 25.4 0.4286 0.0000 0.4786 0.0500
10 27.2 0.4762 0.0000 0.5685 0.0923
11 29.5 0.5238 0.0000 0.6640 0.1402
12 30.1 0.5714 0.0000 0.6855 0.1141
13 30.5 0.6190 0.0000 0.6991 0.0801
14 30.8 0.6667 0.0000 0.7090 0.0423
15 33.0 0.7143 0.0000 0.7719 0.0576
16 35.9 0.7619 0.0000 0.8341 0.0722
17 37.3 0.8095 0.0000 0.8575 0.0480
18 38.4 0.8571 0.0000 0.8734 0.0162
19 39.0 0.9048 0.0000 0.8812 0.0236
20 39.3 0.9524 0.0000 0.8849 0.0675
DELTA TEORICO = 0.1402
BEAR CREEK MINING CORPORATION
ESTUDIO HIDROGEOLGICO DEL PROYECTO DE EXPLORACIN TASSA

ESTACION UBINAS - Prueba de bondad Smirnov Kolmogorov (continuacion 2)

E.2.1.5 DISTRIBUCION GUMBEL - Momentos lineales


m X P(X) G(Y) Ordinario G(Y) Mom Lineal Delta
1 14.1 0.0476 0.0032 0.0084 0.0392
2 15.6 0.0952 0.0115 0.0225 0.0727
3 20.5 0.1429 0.1400 0.1683 0.0254
4 20.8 0.1905 0.1542 0.1824 0.0081
5 21.5 0.2381 0.1895 0.2171 0.0210
6 22.5 0.2857 0.2449 0.2700 0.0157
7 23.5 0.3333 0.3042 0.3256 0.0077
8 24.9 0.3810 0.3900 0.4049 0.0239
9 25.4 0.4286 0.4206 0.4330 0.0044
10 27.2 0.4762 0.5269 0.5304 0.0542
11 29.5 0.5238 0.6466 0.6409 0.1171
12 30.1 0.5714 0.6741 0.6666 0.0952
13 30.5 0.6190 0.6915 0.6830 0.0640
14 30.8 0.6667 0.7041 0.6949 0.0282
15 33.0 0.7143 0.7844 0.7716 0.0573
16 35.9 0.7619 0.8612 0.8472 0.0853
17 37.3 0.8095 0.8885 0.8749 0.0654
18 38.4 0.8571 0.9063 0.8934 0.0362
19 39.0 0.9048 0.9149 0.9023 0.0024
20 39.3 0.9524 0.9189 0.9065 0.0459
DELTA TEORICO = 0.1171

E.2.1.6 DISTRIBUCION LOG GUMBEL - Momentos lineales


m X P(X) G(Y) Ordinario G(Y) Mom Lineal Delta
1 14.1 0.0476 0.0001 0.0004 0.0472
2 15.6 0.0952 0.0025 0.0056 0.0896
3 20.5 0.1429 0.1604 0.1822 0.0394
4 20.8 0.1905 0.1794 0.2010 0.0105
5 21.5 0.2381 0.2258 0.2461 0.0080
6 22.5 0.2857 0.2947 0.3119 0.0262
7 23.5 0.3333 0.3636 0.3769 0.0435
8 24.9 0.3810 0.4552 0.4626 0.0816
9 25.4 0.4286 0.4858 0.4912 0.0626
10 27.2 0.4762 0.5849 0.5840 0.1078
11 29.5 0.5238 0.6859 0.6795 0.1557
12 30.1 0.5714 0.7078 0.7005 0.1291
13 30.5 0.6190 0.7216 0.7137 0.0946
14 30.8 0.6667 0.7314 0.7232 0.0565
15 33.0 0.7143 0.7931 0.7829 0.0687
16 35.9 0.7619 0.8514 0.8406 0.0787
17 37.3 0.8095 0.8726 0.8620 0.0524
18 38.4 0.8571 0.8868 0.8764 0.0192
19 39.0 0.9048 0.8938 0.8835 0.0213
20 39.3 0.9524 0.8971 0.8869 0.0655
DELTA TEORICO = 0.1557
BEAR CREEK MINING CORPORATION
ESTUDIO HIDROGEOLGICO DEL PROYECTO DE EXPLORACIN TASSA

RESUMEN
DELTA TABULAR 0.3041
DELTA TEORICO - DELTA TABULAR:
NORMAL: 0.2264
LOG NORMAL DE 2 P: 0.2084
LOG NORMAL DE 3 P:
GAMMA 2 P: 0.1728
GAMMA 3 P:
LOG PEARSON III: 0.1639
GUMBEL: 0.1870
LOG GUMBEL: 0.1484

MINIMO 0.1484
LA DISTRIBUCION A EMPLEAR SERA LA DISTRIBUCION LOG GUMBEL
BEAR CREEK MINING CORPORATION
ESTUDIO HIDROGEOLGICO DEL PROYECTO DE EXPLORACIN TASSA

Cuadro E.3 PRECIPITACIONES MAXIMAS INSTANTANEAS ANUALES EN 24 HORAS

ESTACION UBINAS
Promedio : x= 28.0
Desviacion estndar : s= 7.7

Tr P(XxT) GAMMA DE 2 P
(aos)
P mm

5 0.800 33.76

10 0.900 40.58

25 0.960 51.21

50 0.980 60.86

100 0.990 72.24

500 0.998 107.34


BEAR CREEK MINING CORPORATION
ESTUDIO HIDROGEOLGICO DEL PROYECTO DE EXPLORACIN TASSA

Cuadro E.4 PMAX24H (mm) y ALTITUD (msnm)

ALTITUD PERIODO DE RETORNO (AOS)


ESTACION
msnm 10 25 50 100 500

UBINAS 3370 40.58 51.21 60.86 72.24 107.34

NOTA: Se elige a la estacin UBINAS como estacin de influencia para el proyecto en el parametro de Precipitacin Mxima en 24
Horas.

Cuadro E.4.1 PMAX24H (mm) en el rea del Proyecto para diferentes periodos de retorno

PERIODO DE RETORNO (AOS)


ESTACION ALTITUD
10 25 50 100 500

PROYECTO 3942.98 40.58 51.21 60.86 72.24 107.34


BEAR CREEK MINING CORPORATION
ESTUDIO HIDROGEOLGICO DEL PROYECTO DE EXPLORACIN TASSA

Cuadro E.4.2 PRECIPITACION DE DISEO PARA DURACIONES MENORES A 24 HORAS

ZONA DEL PROYECTO


DURACION PERIODO DE RETORNO
Hr min 10 25 50 100 500
0.17 10.00 11.71 14.78 17.57 20.85 30.99
0.33 20.00 13.93 17.58 20.89 24.80 36.85
0.50 30.00 15.42 19.46 23.12 27.45 40.78
0.67 40.00 16.57 20.91 24.85 29.49 43.82
0.83 50.00 17.52 22.11 26.27 31.18 46.34
1.00 60.00 18.33 23.14 27.50 32.64 48.50
1.50 90.00 20.29 25.61 30.43 36.12 53.67
2.00 120.00 21.80 27.51 32.70 38.81 57.67
4.00 240.00 25.93 32.72 38.89 46.16 68.58
6.00 360.00 28.69 36.21 43.03 51.08 75.90
7.00 420.00 29.82 37.63 44.73 53.09 78.88
8.00 480.00 30.83 38.91 46.24 54.89 81.56
10.00 600.00 32.60 41.14 48.90 58.04 86.24
11.00 660.00 33.39 42.14 50.08 59.44 88.32
12.00 720.00 34.12 43.06 51.18 60.75 90.26
24.00 1440.00 40.58 51.21 60.86 72.24 107.34
P rec ip ita cion (m m )

Fig E.4.2. Hietogramas de diseo - Tipo II SCS


100
90
80
70 Hietograma 10
aos
60
Hietograma 25
50 aos
40 Hietograma 50
aos
30
Hietograma 100
20 aos
10
0
-6 -1 4 9 14 19 24
Horas
BEAR CREEK MINING CORPORATION
ESTUDIO HIDROGEOLGICO DEL PROYECTO DE EXPLORACIN TASSA

Cuadro E.4.3 INTENSIDADES DE DISEO PARA DURACIONES MENORES A 24 HORAS

ZONA DEL PROYECTO


DURACION PERIODO DE RETORNO
Hr min 10 25 50 100 500
0.17 10.00 70.29 88.70 105.41 125.12 185.92
0.33 20.00 41.79 52.74 62.68 74.40 110.55
0.50 30.00 30.83 38.91 46.24 54.89 81.56
0.67 40.00 24.85 31.36 37.27 44.24 65.73
0.83 50.00 21.02 26.53 31.53 37.42 55.60
1.00 60.00 18.33 23.14 27.50 32.64 48.50
1.50 90.00 13.53 17.07 20.29 24.08 35.78
2.00 120.00 10.90 13.76 16.35 19.41 28.84
4.00 240.00 6.48 8.18 9.72 11.54 17.15
6.00 360.00 4.78 6.04 7.17 8.51 12.65
7.00 420.00 4.26 5.38 6.39 7.58 11.27
8.00 480.00 3.85 4.86 5.78 6.86 10.20
10.00 600.00 3.26 4.11 4.89 5.80 8.62
11.00 660.00 3.04 3.83 4.55 5.40 8.03
12.00 720.00 2.84 3.59 4.26 5.06 7.52
24.00 1440.00 1.69 2.13 2.54 3.01 4.47
In ten sid ad d e p recip itacio n (m m /h r)

Fig E.4.3 Curv a Intensidad Duracion y Frecuencia


160.00

140.00

120.00

100.00
T R 10 AOS
T R 25 AOS
80.00
T R 50 AOS

60.00 T R 100 AOS


T R 500 AOS
40.00

20.00

0.00
10.00 110.00 210.00 310.00 410.00 510.00 610.00 710.00 810.00 910.00
Duracion (min)

0 .75 0.75 0. 75
I 10=395 .2D
0 .75
I 25=498.7 D
0 .75
I 50=592 .7 D I 100=703.6 D I 500=1045 . 0 D
BEAR CREEK MINING CORPORATION
ESTUDIO HIDROGEOLGICO DEL PROYECTO DE EXPLORACIN TASSA

Cuadro F.1 TEMPERATURA MEDIA MENSUAL - ESTACION UBINAS


LAT. : 16 22' S DPTO : MOQUEGUA
LONG. : 70 51' W PROV : GENERAL SANCHEZ
ALT. : 3370 m.s.n.m. DIST. : UBINAS

AO ENE FEB MAR ABR MAY JUN JUL AGO SET OCT NOV DIC PROMEDIO
1990 12.9 12.2 12.3 11.1 10.1 8.9 8.0 9.6 10.7 12.5 13.8 12.4 11.21
1991 11.9 12.9 11.9 11.4 10.4 8.1 8.7 10.5 11.4 13.0 12.9 13.2 11.36
1992 13.4 13.1 13.1 11.3 10.2 8.9 8.3 8.8 10.0 12.8 12.7 13.1 11.31
1993 11.3 12.1 11.5 11.7 9.7 9.3 8.5 9.2 11.0 13.2 13.4 13.2 11.18
1994 11.4 10.7 11.9 11.4 10.2 9.1 9.0 10.5 12.4 13.0 13.7 13.6 11.41
1995 13.7 13.0 11.5 11.4 10.1 8.8 8.8 10.5 12.0 12.9 13.5 13.2 11.62
1996 11.4 11.6 11.6 11.6 10.2 8.2 8.6 10.0 11.7 13.0 12.9 12.8 11.13
1997 9.7 11.5 11.2 10.5 9.9 7.8 10.0 9.9 11.4 13.4 13.9 14.9 11.18
1998 13.8 14.2 14.4 12.3 10.5 9.9 9.8 10.1 11.3 13.6 13.2 12.9 12.17
1999 12.7 10.3 10.3 11.2 9.8 8.2 8.9 10.2 10.8 12.9 13.1 13.5 10.99
2000 10.1 9.8 10.7 11.7 10.3 8.5 8.0 10.2 11.1 13.3 13.3 13.3 10.86
2001 10.8 10.9 10.8 11.7 9.8 9.4 9.1 10.6 11.5 13.5 13.9 14.2 11.35
2002 13.6 11.1 11.8 11.4 10.8 10.0 8.6 10.7 11.7 13.6 14.0 14.6 11.83
2003 13.7 13.2 12.5 11.6 10.6 9.6 9.1 9.9 11.4 13.6 14.6 14.1 11.99
2004 11.8 12.2 13.8 11.7 9.5 9.1 8.6 10.0 12.2 13.2 14.2 14.3 11.72
2005 12.5 12.6 12.3 12.3 10.2 8.5 9.6 10.2 10.7 13.0 13.8 12.5 11.52
2007 14.2 12.4 12.3 11.7 9.8 9.9 8.9 10.2 12.7 13.4 13.8 13.0 11.86
2008 11.4 11.3 12.2 10.6 8.9 8.8 9.0 9.7 11.2 13.3 14.4 12.8 11.13
2009 14.2 11.7 12.5 12.7 10.1 8.9 9.0 9.8 12.3 14.3 14.3 14.8 12.05
2010 14.3 14.1 14.3 13.2 10.3 9.6 7.9 10.5 10.7 11.3 11.6 11.6 11.62
PROM 12.44 12.05 12.15 11.63 10.07 8.98 8.82 10.06 11.41 13.14 13.55 13.40 11.47
DESV. STA 1.42 1.19 1.11 0.63 0.42 0.64 0.56 0.48 0.68 0.58 0.70 0.86 0.37
MAX 14.3 14.2 14.4 13.2 10.8 10 10 10.7 12.7 14.3 14.6 14.9 12.17
MIN 9.7 9.8 10.3 10.5 8.9 7.8 7.9 8.8 10 11.3 11.6 11.6 10.86
Fuente: SENAMHI
Dato completado con la media
BEAR CREEK MINING CORPORATION
ESTUDIO HIDROGEOLGICO DEL PROYECTO DE EXPLORACIN TASSA

Temperatura Media (C)

F.1.1 Variacion de la temperatura media - Quebrada Tassa


16

14

12

10

0
ENE FEB MAR ABR MAY JUN JUL AGO SET OCT NOV DIC
PROM MAX. MIN.
BEAR CREEK MINING CORPORATION
ESTUDIO HIDROGEOLGICO DEL PROYECTO DE EXPLORACIN TASSA

Temperatura Media (C)

F.1.2 Variacion de la temperatura media - Quebrada Tassa


12.50

12.00

11.50

11.00

10.50

10.00
BEAR CREEK MINING CORPORATION
ESTUDIO HIDROGEOLGICO DEL PROYECTO DE EXPLORACIN TASSA

Cuadro F.2.1 TEMPERATURA MAXIMA MEDIA MENSUAL (C) - ESTACION UBINAS

AO ENE FEB MAR ABR MAY JUN JUL AGO SET OCT NOV DIC PROM
1990 19.5 19.2 19.8 18.9 18.1 16.3 16.5 18.0 18.8 19.1 20.4 17.8 18.53
1991 17.7 19.0 17.7 19.0 19.7 17.0 17.6 19.7 19.0 20.1 19.8 19.5 18.82
1992 20.1 20.0 20.3 18.7 18.7 16.9 16.5 16.6 17.6 19.6 19.2 18.4 18.55
1993 16.0 17.9 17.3 18.9 17.9 18.1 16.9 17.3 18.4 19.7 19.9 18.8 18.09
1994 16.9 15.5 18.2 18.5 19.1 18.0 18.3 19.4 20.4 20.2 20.5 20.2 18.77
1995 19.9 19.5 17.6 19.5 19.2 18.1 17.9 19.6 19.6 19.9 19.9 19.2 19.16
1996 17.1 17.5 17.8 18.7 18.4 16.6 17.3 18.0 19.6 19.7 19.3 19.4 18.28
1997 15.0 17.0 17.1 18.1 18.2 16.3 18.9 17.4 18.1 20.2 19.9 20.9 18.09
1998 19.6 20.2 21.0 19.9 19.6 18.2 18.6 18.6 19.4 20.5 19.8 18.8 19.52
1999 18.9 14.9 15.3 18.3 18.1 17.1 17.3 18.9 19.2 19.8 19.8 19.0 18.05
2000 15.7 14.9 16.6 19.5 19.5 17.3 16.6 18.8 19.1 20.4 20.1 20.0 18.21
2001 16.6 16.5 16.3 18.9 17.7 17.9 17.8 19.1 19.2 20.4 20.3 20.5 18.43
2002 20.3 16.1 17.7 18.4 18.8 18.5 16.3 19.1 19.1 20.7 20.5 21.0 18.88
2003 20.1 19.6 18.9 19.4 18.6 19.0 17.9 18.4 19.3 20.5 20.9 20.6 19.43
2004 17.6 18.1 20.8 18.7 18.2 17.7 16.4 18.2 20.0 20.1 20.7 20.7 18.93
2005 19.0 19.3 18.7 20.2 19.3 18.5 18.5 20.2 18.8 20.2 21.2 19.4 19.44
2007 21.2 19.1 18.7 19.7 18.7 19.4 17.9 19.2 21.2 20.9 21.0 19.6 19.72
2008 16.8 17.4 19.1 18.5 18.7 18.6 18.7 18.9 20.0 21.1 21.5 19.8 19.09
2009 20.9 17.8 18.8 19.8 18.6 18.4 18.0 19.6 20.5 21.4 21.3 21.4 19.71
2010 21.1 20.7 21.5 21.3 18.9 18.8 17.8 19.5 19.2 18.6 18.4 17.7 19.46
PROM 18.50 18.01 18.46 19.15 18.70 17.84 17.59 18.73 19.33 20.16 20.22 19.64 18.86
DESV. STA 1.94 1.77 1.64 0.77 0.57 0.90 0.82 0.92 0.84 0.65 0.77 1.04 18.87
MAX 21.2 20.7 21.5 21.3 19.7 19.4 18.9 20.2 21.2 21.4 21.5 21.4 18.9
MIN 15 14.9 15.3 18.1 17.7 16.3 16.3 16.6 17.6 18.6 18.4 17.7 18.9

Cuadro F.2.2 TEMPERATURA MINIMA MEDIA MENSUAL (C) - ESTACION UBINAS

AO ENE FEB MAR ABR MAY JUN JUL AGO SET OCT NOV DIC PROM
1990 5.9 5.1 5.2 4.0 2.4 1.6 -0.4 1.6 1.8 4.3 5.5 5.9 3.58
1991 5.9 6.3 5.7 4.6 2.3 -0.3 0.1 2.2 3.6 4.1 4.4 4.9 3.65
1992 6.6 5.5 5.6 3.9 2.6 1.5 0.6 0.9 1.3 4.3 4.2 5.8 3.57
1993 6.1 5.4 6.0 5.0 2.6 1.1 0.4 1.7 3.0 5.0 5.6 6.4 4.03
1994 6.4 6.3 5.8 5.2 2.4 1.3 0.7 2.3 4.3 3.5 4.8 6.3 4.11
1995 6.9 5.9 5.9 4.3 2.5 0.7 0.6 2.5 4.5 3.9 5.2 5.5 4.03
1996 5.6 6.5 5.6 5.3 3.3 0.6 0.4 2.8 3.3 4.2 4.7 6.1 4.03
1997 6.3 6.3 6.1 4.0 2.2 -0.3 1.8 2.7 5.1 4.6 5.7 7.1 4.30
1998 8.6 8.0 8.0 5.6 2.9 2.7 2.2 2.6 2.8 5.2 5.0 5.5 4.93
1999 5.8 7.0 6.6 6.0 3.1 0.9 1.9 2.9 3.1 5.6 3.8 5.5 4.35
2000 6.5 6.3 6.1 5.5 3.4 1.0 0.5 3.0 3.0 5.1 3.8 6.0 4.18
2001 6.3 7.0 6.6 6.0 3.1 2.3 1.3 3.2 4.2 5.4 5.0 6.1 4.71
2002 6.1 7.2 6.9 5.9 4.5 3.3 2.0 3.3 4.0 5.7 5.8 6.6 5.11
2003 7.1 7.2 6.8 5.2 3.9 2.0 1.7 2.3 3.1 4.8 5.2 6.3 4.63
2004 6.5 6.6 7.7 5.3 1.5 1.3 1.5 3.7 4.2 4.4 5.1 6.0 4.48
2005 6.5 7.3 6.3 5.6 2.5 0.2 1.4 1.7 3.0 3.5 4.4 5.3 3.98
2007 7.4 6.2 6.8 6.3 3.0 2.9 1.8 2.6 5.1 4.6 5.7 4.4 4.73
2008 6.9 5.3 6.3 3.5 0.8 1.0 1.0 1.5 2.0 4.4 4.8 4.2 3.48
2009 6.3 6.8 6.0 4.9 3.2 0.8 2.1 1.1 3.9 5.2 6.7 6.4 4.45
2010 7.3 8.0 7.6 6.4 3.7 3.1 -0.1 2.7 3.4 3.1 2.0 4.7 4.33
PROM 6.55 6.51 6.38 5.13 2.80 1.39 1.08 2.37 3.44 4.55 4.87 5.75 4.23
DESV. STA 0.69 0.83 0.75 0.84 0.82 1.05 0.79 0.75 1.02 0.72 0.98 0.75 0.83
MAX 8.6 8 8 6.4 4.5 3.3 2.2 3.7 5.1 5.7 6.7 7.1 5.8
MIN 5.6 5.1 5.2 3.5 0.8 -0.3 -0.4 0.9 1.3 3.1 2 4.2 2.6
BEAR CREEK MINING CORPORATION
ESTUDIO HIDROGEOLGICO DEL PROYECTO DE EXPLORACIN TASSA

Cuadro F.3 ESTIMACION DE LA EVAPORACION MEDIA (METODO DE TURC)

No se cuenta con informacion suficiente de evaporacin de tanque en las zonas cercanas al proyecto

La metodologia de Turc permite estimar la evapotranpiracin media mensual y anual (mm). La evapotranspiracin media para las condiciones analizadas puede considerarse equivalente
a la evaporacin media.
Variables:
t = Temperatura media (C) P
P = Precipitacin media (mm) E 2 , L 300 25t 0.05t 3
P
L = Polinomio de temperatura para el mtodo de Turc ( 0 .9 2 ) 2
E = Evapotraspiracin media (mm) L

VARIABLE ENE FEB MAR ABR MAY JUN JUL AGO SET OCT NOV DIC ANUAL
t (C) 12.44 12.05 12.15 11.63 10.07 8.98 8.82 10.06 11.41 13.14 13.55 13.40 11.47
L 707.26 688.50 693.19 669.18 602.81 560.52 554.81 602.20 659.52 741.94 763.14 755.31 662.33
E v a p o ra c i n To ta l m e n s u a l ( m m )

P (mm) 79.88 83.44 58.37 12.52 2.06 3.16 2.53 3.61 3.74 3.38 8.13 33.75 294.5
E 76.24 79.64 55.71 11.94 1.96 3.02 2.41 3.44 3.57 3.23 7.76 32.21 281.12

F.3.1 Variacion de la evaporacin media estimada por el mtodo de Turc


90.00

80.00

70.00

60.00

50.00

40.00

30.00

20.00

10.00

0.00
ENE FEB MAR ABR MAY JUN JUL AGO SET OCT NOV DIC
BEAR CREEK MINING CORPORATION
ESTUDIO HIDROGEOLGICO DEL PROYECTO DE EXPLORACIN TASSA

GENERACION DE DESCARGAS PARA LA MICROCUENCA - QUEBRADA TASSA


METODO PROPUESTO POR LA MISION TECNICA ALEMANA - 1980
AOS PROMEDIOS

Cuadro G.1.1 Precipitacin Efectiva (Bureau of Reclamation)

Precipitacin Efectiva (mm)


P P. Efectiva: PE (mm)
mm Curva I Curva II Curva III
0.0 0.0 0.0 0.0
10.0 0.0 1.0 2.0
20.0 0.0 2.0 4.0
30.0 0.0 3.0 6.0
40.0 0.5 4.0 8.0
Figura: Precipitacin Efectiva Segn Bureau Of Reclamation
50.0 1.0 6.0 11.0
60.0 1.5 8.0 14.0
140
70.0 3.0 10.0 18.0
120
80.0 4.0 14.0 24.0
90.0 5.5 18.0 30.0 100
100.0 8.0 23.0 39.0 80
110.0 11.0 29.0 48.0 60
120.0 15.0 36.0 58.0
40
130.0 19.0 43.0 68.0
20
140.0 24.0 52.0 78.0
150.0 30.0 60.0 88.0 0
0 20 40 Precipitacin
60 80 Mensual
100 120 140
(mm) 160 180
160.0 37.0 69.0 98.0 Curva I Curva II Curva III
170.0 45.0 79.0 108.0
180.0 55.0 89.0 118.0

Cuadro G.1.2 Clculo del Coeficiente de Escorrenta

Mtodo de la Misin Alemana Mtodo de L - Turc

Precipitacin Total Anual: PT 294.54 mm Temperatura Media Anual: T 11.47 C


Evaporacin Total Anual: ETP 281.12 mm Coeficiente de Temperatura: L 662.3
Dficit de Escurrimiento: D 281.1 mm/ao
Coeficiente de Escorrenta: C 115.66 Coeficiente de Escorrenta: C 0.05

Cuadro G.1.4 Coeficientes de


Cuadro G.1.3 Caractersticas Generales de la Microcuenca Clculo - Precipitacin Efectiva

Area de la Microcuenca: Tassa 13.025 Km2 Coef. Curva I Curva II Curva III
Altitud Media de la Cuenca: H 3943.0 msnm a0 -0.216336 1.099795 0.375940
Pendiente Media de la Cuenca 0.19 m/m a1 0.026063 -0.037154 0.041788
Precipitacin Total Anual: PT 294.54 mm a2 -0.000660 0.002260 0.003515
Evaporacin Total Anual: ETP 281.12 mm a3 0.000012 0.000004
Temperatura Media Anual: T 11.47 C
Dficit de Escurrimiento: D 281.1 mm/ao
Coeficiente de Escorrenta: C 0.05
Coeficiente de Agotamiento: a 0.0235 El rango de aplicacin de los
Relacin de Caudales (30 das): bo 0.494 coeficientes de la ecuacin
Areas hmedas 0.000 Km2 Polinmica de la PE est
Gasto Mensual de Retencin: R 0.0 mm/ao comprendida para 0 < P < 250 mm
GENERACION DE DESCARGAS PARA LA MICROCUENCA - QUEBRADA TASSA
METODO PROPUESTO POR LA MISION TECNICA ALEMANA - 1980
AOS PROMEDIOS

CUADRO G.1.5 GENERACION DE CAUDALES MEDIOS MENSUALES PARA EL AO PROMEDIO

PRECIPITACION MENSUAL CONTRIBUCION DE LA RETENCION CAUDALES


N P Efectiva Gasto Abastecimiento GENERADOS
MES das del Total PE II PE III PE bi Gi ai Ai
mes mm/mes mm/mes mm/mes mm/mes mm/mes mm/mes mm/mes m3/s
ENE 31 79.9 14.5 26.1 1.9 0.000 0.0 0.140 0.0 1.88 0.009
FEB 28 83.4 15.9 28.3 2.5 0.000 0.0 0.189 0.0 2.54 0.014
MAR 31 58.4 7.4 14.8 -0.6 0.000 0.0 -0.046 0.0 -0.62 -0.003
ABR 30 12.5 1.0 1.4 0.5 0.494 0.0 0.038 0.0 0.51 0.003
MAY 31 2.1 1.0 0.5 1.6 0.232 0.0 0.122 0.0 1.63 0.008
JUN 30 3.2 1.0 0.5 1.5 0.120 0.0 0.112 0.0 1.50 0.008
JUL 31 2.5 1.0 0.5 1.6 0.054 0.0 0.118 0.0 1.58 0.008
AGO 31 3.6 1.0 0.6 1.5 0.026 0.0 0.108 0.0 1.45 0.007
SEP 30 3.7 1.0 0.6 1.4 0.014 0.0 0.107 0.0 1.44 0.007
OCT 31 3.4 1.0 0.6 1.5 0.006 0.0 0.110 0.0 1.48 0.007
NOV 30 8.1 0.9 0.9 1.0 0.000 0.0 0.071 0.0 0.95 0.005
DIC 31 33.8 2.6 5.8 -0.9 0.000 0.0 -0.069 0.0 -0.92 -0.004
AO 294.5 48.4 80.7 13.4 0.947 0.0 1.000 0.0 13.42 0.006
Coeficientes 0.05 2.081 -1.081 1.000
Fuente: Elaboracin propia

CUADRO G.1.6 CALCULO DE LOS COEFICIENTES DE CORRELACION PARA EL AO PROMEDIO

Qt Qt-1 PE
1.9 -0.9 1.9
2.5 1.9 2.5 Resultado de la regresin
-0.6 2.5 -0.6
0.5 -0.6 0.5 Error tpico de est Y 1.1471
1.6 0.5 1.6 R cuadrado 0.9980
1.5 1.6 1.5 N de observaciones 12
1.6 1.5 1.6 Grados de libertad 11
1.5 1.6 1.5
1.4 1.5 1.4 Coeficientes X 0.2308 0.6893
1.5 1.4 1.5 Error tpico del coef 0.0180 0.0149
1.0 1.5 1.0
-0.9 1.0 -0.9
Fuente: Elaboracin propia
BEAR CREEK MINING CORPORATION
ESTUDIO HIDROGEOLGICO DEL PROYECTO DE EXPLORACIN TASSA

GENERACION DE DESCARGAS PARA LA MICROCUENCA - QUEBRADA TASSA


METODO PROPUESTO POR LA MISION TECNICA ALEMANA - 1980
AOS HUMEDOS

Cuadro G.2.1 Precipitacin Efectiva (Bureau of Reclamation)

P P. Efectiva: PE (mm)

Precipitacin Efectiva (mm)


mm Curva I Curva II Curva III
0.0 0.0 0.0 0.0
10.0 0.0 1.0 2.0
20.0 0.0 2.0 4.0
30.0 0.0 3.0 6.0
40.0 0.5 4.0 8.0 Figura Porcin de Precipitacin Efectiva Segn Bureau Of Reclamation
50.0 1.0 6.0 11.0
60.0 1.5 8.0 14.0
140
70.0 3.0 10.0 18.0
120
80.0 4.0 14.0 24.0
90.0 5.5 18.0 30.0 100
100.0 8.0 23.0 39.0 80
110.0 11.0 29.0 48.0 60
120.0 15.0 36.0 58.0
40
130.0 19.0 43.0 68.0
20
140.0 24.0 52.0 78.0
150.0 30.0 60.0 88.0 0
0 20 40 60 80
Precipitacin 100 120
Mensual 140
(mm) 160 180
160.0 37.0 69.0 98.0 Curva I Curva II Curva III
170.0 45.0 79.0 108.0
180.0 55.0 89.0 118.0

Cuadro G.2.2 Clculo del Coeficiente de Escorrenta

Mtodo de la Misin Alemana Mtodo de L - Turc

Precipitacin Total Anual: PT 426.58 mm Temperatura Media Anual: T 11.47 C


Evaporacin Total Anual: ETP 281.12 mm Coeficiente de Temperatura: L 662.3
Dficit de Escurrimiento: D 372.0 mm/ao
Coeficiente de Escorrenta: C 93.61 Coeficiente de Escorrenta: C 0.13

Cuadro G.2.4 Coeficientes de


Cuadro G.2.3 Caractersticas Generales de la Microcuenca Clculo - Precipitacin Efectiva

Area de la Microcuenca: D 13.03 Km2 Coef. Curva I Curva II Curva III


Altitud Media de la Cuenca: H 3943 msnm a0 -0.216336 1.099795 0.375940
Pendiente Media de la Cuenca 0.19 m/m a1 0.026063 -0.037154 0.041788
Precipitacin Total Anual: PT 426.58 mm a2 -0.000660 0.002260 0.003515
Evaporacin Total Anual: ETP 281.12 mm a3 0.000012 0.000004
Temperatura Media Anual: T 11.47 C
Dficit de Escurrimiento: D 372.0 mm/ao
Coeficiente de Escorrenta: C 0.13
Coeficiente de Agotamiento: a 0.0235 El rango de aplicacin de los
Relacin de Caudales (30 das): bo 0.494 coeficientes de la ecuacin
Areas hmedas 0.0000 Km2 Polinmica de la PE est
Gasto Mensual de Retencin: R 0.0 mm/ao comprendida para 0 < P < 250 mm
GENERACION DE DESCARGAS PARA LA MICROCUENCA - QUEBRADA TASSA
METODO PROPUESTO POR LA MISION TECNICA ALEMANA - 1980
AOS HUMEDOS

CUADRO G.2.5 GENERACION DE CAUDALES MEDIOS MENSUALES PARA LOS AOS HUMEDOS

PRECIPITACION MENSUAL CONTRIBUCION DE LA RETENCION CAUDALES


N P Efectiva Gasto Abastecimiento GENERADOS
MES das del Total PE II PE III PE bi Gi ai Ai
mes mm/mes mm/mes mm/mes mm/mes mm/mes mm/mes mm/mes m3/s
ENE 31 94.3 20.9 35.6 5.9 0.000 0.0 0.109 0.0 5.94 0.029
FEB 28 154.4 63.2 90.7 35.4 0.000 0.0 0.649 0.0 35.40 0.191
MAR 31 91.1 19.4 33.4 5.1 0.000 0.0 0.094 0.0 5.12 0.025
ABR 30 17.2 1.1 2.1 0.1 0.494 0.0 0.003 0.0 0.15 0.001
MAY 31 1.0 1.1 0.4 1.7 0.232 0.0 0.032 0.0 1.72 0.008
JUN 30 0.2 1.1 0.4 1.8 0.120 0.0 0.033 0.0 1.81 0.009
JUL 31 6.1 1.0 0.8 1.2 0.054 0.0 0.021 0.0 1.16 0.006
AGO 31 6.5 1.0 0.8 1.1 0.026 0.0 0.020 0.0 1.11 0.005
SEP 30 10.9 1.0 1.2 0.7 0.014 0.0 0.013 0.0 0.68 0.003
OCT 31 7.7 0.9 0.9 1.0 0.006 0.0 0.018 0.0 1.00 0.005
NOV 30 6.9 1.0 0.8 1.1 0.000 0.0 0.020 0.0 1.07 0.005
DIC 31 30.3 2.2 4.9 -0.6 0.000 0.0 -0.011 0.0 -0.60 -0.003
AO 426.6 113.7 171.9 54.6 0.947 0.0 1.000 0.0 54.56 0.024
Coeficientes 0.13 2.016 -1.016 1.000
Fuente: Elaboracin propia

CUADRO G.2.6 CALCULO DE LOS COEFICIENTES DE CORRELACION PARA AOS HUMEDOS

Qt Qt-1 PE
5.9 -0.6 5.9
35.4 5.9 35.4 Resultado de la regresin
5.1 35.4 5.1
0.1 5.1 0.1 Error tpico de est Y 1.087
1.7 0.1 1.7 R cuadrado 0.9992
1.8 1.7 1.8 N de observaciones 12
1.2 1.8 1.2 Grados de libertad 11
1.1 1.2 1.1
0.7 1.1 0.7 Coeficientes X 0.1627 0.7670
1.0 0.7 1.0 Error tpico del coef 0.0121 0.0106
1.1 1.0 1.1
-0.6 1.1 -0.6
Fuente: Elaboracin propia
BEAR CREEK MINING CORPORATION
ESTUDIO HIDROGEOLGICO DEL PROYECTO DE EXPLORACIN TASSA

GENERACION DE DESCARGAS PARA LA MICROCUENCA - QUEBRADA TASSA


METODO PROPUESTO POR LA MISION TECNICA ALEMANA - 1980
AOS SECOS

Cuadro G.3.1 Precipitacin Efectiva (Bureau of Reclamation)

P P. Efectiva: PE (mm)

Precipitacin Efectiva (mm)


mm Curva I Curva II Curva III
0.0 0.0 0.0 0.0
10.0 0.0 1.0 2.0
20.0 0.0 2.0 4.0
30.0 0.0 3.0 6.0
40.0 0.5 4.0 8.0 Figura Porcin de Precipitacin Efectiva Segn Bureau Of Reclamation
50.0 1.0 6.0 11.0
60.0 1.5 8.0 14.0
140
70.0 3.0 10.0 18.0
120
80.0 4.0 14.0 24.0
90.0 5.5 18.0 30.0 100
100.0 8.0 23.0 39.0 80
110.0 11.0 29.0 48.0 60
120.0 15.0 36.0 58.0
40
130.0 19.0 43.0 68.0
20
140.0 24.0 52.0 78.0
150.0 30.0 60.0 88.0 0
0 20 40 60 80
Precipitacin 100 120
Mensual 140
(mm) 160 180
160.0 37.0 69.0 98.0 Curva I Curva II Curva III
170.0 45.0 79.0 108.0
180.0 55.0 89.0 118.0

Cuadro G.3.2 Clculo del Coeficiente de Escorrenta

Mtodo de la Misin Alemana Mtodo de L - Turc

Precipitacin Total Anual: PT 184.35 mm Temperatura Media Anual: T 11.47 C


Evaporacin Total Anual: ETP 281.12 mm Coeficiente de Temperatura: L 662.3
Dficit de Escurrimiento: D 186.5 mm/ao
Coeficiente de Escorrenta: C 151.14 Coeficiente de Escorrenta: C -0.01

Cuadro G.3.4 Coeficientes de


Cuadro G.3.3 Caractersticas Generales de la Microcuenca Clculo - Precipitacin Efectiva

Area de la Microcuenca: D 13.03 Km2 Coef. Curva I Curva II Curva III


Altitud Media de la Cuenca: H 3943 msnm a0 -0.216336 1.099795 0.375940
Pendiente Media de la Cuenca 0.19 m/m a1 0.026063 -0.037154 0.041788
Precipitacin Total Anual: PT 184.35 mm a2 -0.000660 0.002260 0.003515
Evaporacin Total Anual: ETP 281.12 mm a3 0.000012 0.000004
Temperatura Media Anual: T 11.47 C
Dficit de Escurrimiento: D 186.5 mm/ao
Coeficiente de Escorrenta: C -0.01
Coeficiente de Agotamiento: a 0.0235 El rango de aplicacin de los
Relacin de Caudales (30 das): bo 0.494 coeficientes de la ecuacin
Areas hmedas 0.0000 Km2 Polinmica de la PE est
Gasto Mensual de Retencin: R 0.0 mm/ao comprendida para 0 < P < 250 mm
GENERACION DE DESCARGAS PARA LA MICROCUENCA - QUEBRADA TASSA
METODO PROPUESTO POR LA MISION TECNICA ALEMANA - 1980
AOS SECOS

CUADRO G.3.5 GENERACION DE CAUDALES MEDIOS MENSUALES PARA LOS AOS SECOS

PRECIPITACION MENSUAL CONTRIBUCION DE LA RETENCION CAUDALES


N P Efectiva Gasto Abastecimiento GENERADOS
MES das del Total PE II PE III PE bi Gi ai Ai
mes mm/mes mm/mes mm/mes mm/mes mm/mes mm/mes mm/mes m3/s
ENE 31 31.7 2.3 5.2 -3.1 0.000 0.0 1.464 0.0 -3.09 -0.015
FEB 28 45.4 4.4 9.5 -5.0 0.000 0.0 2.374 0.0 -5.02 -0.027
MAR 31 46.7 4.7 10.0 -5.2 0.000 0.0 2.449 0.0 -5.17 -0.025
ABR 30 6.4 1.0 0.8 1.3 0.494 0.0 -0.600 0.0 1.27 0.006
MAY 31 4.3 1.0 0.6 1.7 0.232 0.0 -0.784 0.0 1.66 0.008
JUN 30 1.4 1.1 0.4 2.2 0.120 0.0 -1.034 0.0 2.18 0.011
JUL 31 1.2 1.1 0.4 2.2 0.054 0.0 -1.051 0.0 2.22 0.011
AGO 31 2.4 1.0 0.5 2.0 0.026 0.0 -0.945 0.0 2.00 0.010
SEP 30 2.3 1.0 0.5 2.0 0.014 0.0 -0.958 0.0 2.02 0.010
OCT 31 2.8 1.0 0.5 1.9 0.006 0.0 -0.913 0.0 1.93 0.009
NOV 30 7.4 1.0 0.9 1.1 0.000 0.0 -0.509 0.0 1.08 0.005
DIC 31 32.3 2.4 5.4 -3.2 0.000 0.0 1.507 0.0 -3.18 -0.015
AO 184.4 21.9 34.8 -2.1 0.947 0.0 1.000 0.0 -2.11 -0.001
Coeficientes -0.01 2.853 -1.853 1.000
Fuente: Elaboracin propia

CUADRO G.3.6 CALCULO DE LOS COEFICIENTES DE CORRELACION PARA AOS SECOS

Qt Qt-1 PE
-3.1 -3.2 -3.1
-5.0 -3.1 -5.0 Resultado de la regresin
-5.2 -5.0 -5.2
1.3 -5.2 1.3 Error tpico de est Y 2.3785
1.7 1.3 1.7 R cuadrado 0.9780
2.2 1.7 2.2 N de observaciones 12
2.2 2.2 2.2 Grados de libertad 11
2.0 2.2 2.0
2.0 2.0 2.0 Coeficientes X 0.3233 0.5830
1.9 2.0 1.9 Error tpico del coef 0.0563 0.0431
1.1 1.9 1.1
-3.2 1.1 -3.2
Fuente: Elaboracin propia
BEAR CREEK MINING CORPORATION
ESTUDIO HIDROGEOLGICO DEL PROYECTO DE EXPLORACIN TASSA

Cuadro I.1 BALANCE HIDRICO PARA AOS PROMEDIO - REA DEL PROYECTO*

BALANCE HIDRICO
P= Precipitacion total mensual promedio
Es = Escurrimiento superficial
EVP = Evaporacion media anual
I= Infiltracion media anual P - Es - EVP - I +- VAR S = 0
VAR S = Variacion del almacenamiento subterraneo

PARAMETRO ENE FEB MAR ABR MAY JUN JUL AGO SET OCT NOV DIC ANUAL
mm/mes mm/mes mm/mes mm/mes mm/mes mm/mes mm/mes mm/mes mm/mes mm/mes mm/mes mm/mes mm/ao
P 79.88 83.44 58.37 12.52 2.06 3.16 2.53 3.61 3.74 3.38 8.13 33.75 294.54
EVP 76.24 79.64 55.71 11.94 1.96 3.02 2.41 3.44 3.57 3.23 7.76 32.21 281.12
Es 1.88 2.54 -0.62 0.51 1.63 1.50 1.58 1.45 1.44 1.48 0.95 -0.92 13.42

PARAMETRO ENE FEB MAR ABR MAY JUN JUL AGO SET OCT NOV DIC ANUAL
m3/s m3/s m3/s m3/s m3/s m3/s m3/s m3/s m3/s m3/s m3/s m3/s m3/s
P 0.388 0.449 0.284 0.063 0.010 0.016 0.012 0.018 0.019 0.016 0.041 0.164 1.480
EVP 0.371 0.429 0.271 0.060 0.010 0.015 0.012 0.017 0.018 0.016 0.039 0.157 1.413
Es 0.009 0.014 -0.003 0.003 0.008 0.008 0.008 0.007 0.007 0.007 0.005 -0.004 0.006
I 0.009 0.007 0.016 0.000 -0.007 -0.007 -0.007 -0.006 -0.006 -0.006 -0.003 0.012 0.062
* Balance hidrico en el rea delimitada de toda la microcuenca
BEAR CREEK MINING CORPORATION
ESTUDIO HIDROGEOLGICO DEL PROYECTO DE EXPLORACIN TASSA

Cuadro I.2 BALANCE HIDRICO PARA AOS HUMEDOS - AREA DEL PROYECTO

BALANCE HIDRICO
P= Precipitacion total mensual promedio
Es = Escurrimiento superficial
EVP = Evaporacion media anual
I= Infiltracion media anual P - Es - EVP - I +- VAR S = 0
VAR S = Variacion del almacenamiento subterraneo

PARAMETRO ENE FEB MAR ABR MAY JUN JUL AGO SET OCT NOV DIC ANUAL
mm/mes mm/mes mm/mes mm/mes mm/mes mm/mes mm/mes mm/mes mm/mes mm/mes mm/mes mm/mes mm/ao
P 94.28 154.42 91.14 17.20 0.98 0.22 6.08 6.52 10.88 7.68 6.92 30.26 426.58
EVP 76.24 79.64 55.71 11.94 1.96 3.02 2.41 3.44 3.57 3.23 7.76 32.21 281.12
Es 5.94 35.40 5.12 0.15 1.72 1.81 1.16 1.11 0.68 1.00 1.07 -0.60 54.56

PARAMETRO ENE FEB MAR ABR MAY JUN JUL AGO SET OCT NOV DIC ANUAL %
m3/s m3/s m3/s m3/s m3/s m3/s m3/s m3/s m3/s m3/s m3/s m3/s m3/s
P 0.458 0.831 0.443 0.086 0.005 0.001 0.030 0.032 0.055 0.037 0.035 0.147 2.144 100.0
EVP 0.371 0.429 0.271 0.060 0.010 0.015 0.012 0.017 0.018 0.016 0.039 0.157 1.413 65.9
Es 0.029 0.191 0.025 0.001 0.008 0.009 0.006 0.005 0.003 0.005 0.005 -0.003 0.024 1.1
I 0.059 0.212 0.147 0.026 -0.013 -0.023 0.012 0.010 0.033 0.017 -0.010 -0.007 0.707 33.0
BEAR CREEK MINING CORPORATION
ESTUDIO HIDROGEOLGICO DEL PROYECTO DE EXPLORACIN TASSA

Cuadro I.3 BALANCE HIDRICO PARA AOS SECOS - AREA DEL PROYECTO

BALANCE HIDRICO
P= Precipitacion total mensual promedio
Es = Escurrimiento superficial
EVP = Evaporacion media anual
I= Infiltracion media anual P - Es - EVP - I +- VAR S = 0
VAR S = Variacion del almacenamiento subterraneo

PARAMETRO ENE FEB MAR ABR MAY JUN JUL AGO SET OCT NOV DIC ANUAL
mm/mes mm/mes mm/mes mm/mes mm/mes mm/mes mm/mes mm/mes mm/mes mm/mes mm/mes mm/mes mm/ao
P 31.68 45.44 46.74 6.40 4.28 1.40 1.20 2.42 2.28 2.80 7.45 32.27 184.35
EVP 76.24 79.64 55.71 11.94 1.96 3.02 2.41 3.44 3.57 3.23 7.76 32.21 281.12
Es -3.09 -5.02 -5.17 1.27 1.66 2.18 2.22 2.00 2.02 1.93 1.08 -3.18 -2.11

PARAMETRO ENE FEB MAR ABR MAY JUN JUL AGO SET OCT NOV DIC ANUAL
m3/s m3/s m3/s m3/s m3/s m3/s m3/s m3/s m3/s m3/s m3/s m3/s m3/s
P 0.154 0.245 0.227 0.032 0.021 0.007 0.006 0.012 0.011 0.014 0.037 0.157 0.926
EVP 0.371 0.429 0.271 0.060 0.010 0.015 0.012 0.017 0.018 0.016 0.039 0.157 1.413
Es -0.015 -0.027 -0.025 0.006 0.008 0.011 0.011 0.010 0.010 0.009 0.005 -0.015 -0.001
I -0.202 -0.157 -0.018 -0.034 0.003 -0.019 -0.017 -0.015 -0.017 -0.011 -0.007 0.016 -0.485
BEAR CREEK MINING CORPORATION
ESTUDIO HIDROGEOLGICO DEL PROYECTO DE EXPLORACIN TASSA

Cuadro J.1 PARAMETROS GEOMORFOLOGICOS

PARAMETROS GEOMORFOLOGICOS
MICROCUENCA

LONGITUD COTA COTA


AREA PERIMETRO PENDIENTE COTA INDICE DE FACTOR
CAUCE MINIMA MAXIMA DESCRIPCION DE LA CUENCA
A P MEDIA COMPACIDAD DE FORMA
L
s
km2 km km msnm msnm m/m msnm
MICROCUENCA TASSA, predominancia de pastizales con
Tassa 13.025 16.555 6.964 3450.0 4750.0 0.187 4100.0 1.29 0.27 mediana cobertura; suelos de moderada a baja permeabilidad (CN =
76)
BEAR CREEK MINING CORPORATION
ESTUDIO HIDROGEOLGICO DEL PROYECTO DE EXPLORACIN TASSA

Cuadro J.2 PARAMETROS HIDROLOGICOS

TIEMPO DE CONCENTRACIN (hr) PRECIPITACION


MICROCUENCA

MAXIMA
US MEDIA T LAG
BRANSBY (mm)
KIRPICH HATHAWAY CORP. GEOME min
WILLIAMS PERIODO DE RETORNO
ING. TRICA
10 25 50 100 500
Tassa 0.56 1.05 1.83 1.80 1.18 42.60 40.58 51.21 60.86 72.24 107.34

TLAG = TIEMPO DE RETARDO

Frmula de Kirpich:

L0.77
Tc 0.06628
S 0.385
Frmula del US Corps of Engineers (Temez):

L0.76
Tc 0.3
S 0.19
Frmula de Bransby - Williams:

L
Tc 0.2433
A 0.1 S 0.2
Frmula de Hathaway

( L.n ) 0.467
Tc 36.60
S 0.234
Donde:
Tc = Tiempo de concentracin en horas.
L = Longitud del cauce en Km.
S = Pendiente en m/m.
A = rea Km2.
BEAR CREEK MINING CORPORATION
ESTUDIO HIDROGEOLGICO DEL PROYECTO DE EXPLORACIN TASSA

Cuadro J.3 METODO DEL HIDROGRAMA UNITARIO SCS

METODO DEL HIDROGRAMA UNITARIO


ALTURA DE LLUVIA LLUVIA EFECTIVA Pe CAUDAL MAXIMO
MICROCUENCA

AREA TIEMPO DE TIEMPO TIEMPO


CAUDAL NUMERO DE (mm) (mm) (m3/s)
A RETRASO PICO BASE
UNITARIO CURVA
Tr Tp Tb TR TR TR
qp (m3/s/mm) N(*)
(hr) (hr) (hr)
KM2 10 25 50 100 500 10 25 50 100 500 10 25 50 100 500
Tassa 13.025 0.56 2.74 7.32 0.99 76.0 40.58 51.21 60.86 72.24 107.34 5.75 10.72 16.07 23.15 48.60 5.690 10.610 15.900 22.920 48.110

( * ) Tabla 5.5.2 (Hidrologia Aplicada - Ven Te Chow; maidment; Mays).


BEAR CREEK MINING CORPORATION
ESTUDIO HIDROGEOLGICO DEL PROYECTO DE EXPLORACIN TASSA

Fig J.4.5 Hidrogramas de entrada y salida para un periodo de retorno de 500 aos - M. Tassa
BEAR CREEK MINING CORPORATION
ESTUDIO HIDROGEOLGICO DEL PROYECTO DE EXPLORACIN TASSA

Cuadro J.5 CAUDALES DE DISEO PARA LA MICROCUENCA. Modelo HEC HMS

CAUDAL MAXIMO m3/s


PERIODO DE RETORNO
MICROCUENCA
10 25 50 100 500
MICROCUENCA TASSA, predominancia de pastizales con mediana
Tassa 5.326 5.872 12.087 28.344 32.463
cobertura; suelos de moderada a baja permeabilidad (CN = 76)