This document provides a schedule of cables needed for a 100 MVA power transformer installation at a 220kV automation substation in Kuppam. It lists 6 cable runs between various components like the FCC, DM Panel, ACDB, DCDB, C&R Panel, and RTCC, specifying the number of cores and square millimeter size of each cable. It notes that the DM Panel and FCC are attached to the power transformer.
This document provides a schedule of cables needed for a 100 MVA power transformer installation at a 220kV automation substation in Kuppam. It lists 6 cable runs between various components like the FCC, DM Panel, ACDB, DCDB, C&R Panel, and RTCC, specifying the number of cores and square millimeter size of each cable. It notes that the DM Panel and FCC are attached to the power transformer.
This document provides a schedule of cables needed for a 100 MVA power transformer installation at a 220kV automation substation in Kuppam. It lists 6 cable runs between various components like the FCC, DM Panel, ACDB, DCDB, C&R Panel, and RTCC, specifying the number of cores and square millimeter size of each cable. It notes that the DM Panel and FCC are attached to the power transformer.