Professional Documents
Culture Documents
AC7110/4 E
AUDIT Issued 1995-01-06
161 Thorn Hill Road, CRITERIA Revised 2006-08-02
Warrendale, PA 15086-7527
Superseding AC7110/4 REV D
1. SCOPE
2. GENERAL INFORMATION
This checklist has been agreed with all mandating prime members. All questions in the
baseline document are required to be answered. Additional checklist supplements are
to be identified as applicable and questions in those supplements answered. Any NO
answer requires the issuance of a nonconformance report.
The base document defines the minimum requirement for this process. Supplements
related to specific processes, materials and unique customer requirements are also
contained in this checklist and must be identified prior to the audit so that they can be
included in the audit scope
PRI operating procedures provide that "This report is published by PRI to advance the state of technical, engineering, and
quality sciences. The use of this report is entirely voluntary, and its applicability and suitability for any particular use, including
any patent infringement arising therefrom, is the sole responsibility of the user."
3. REFERENCES
4. MATERIAL CONTROL
5. EQUIPMENT
-2-
PRI AC7110/4 REV E
5.7 Shunting
Is there a documented procedure to ensure that jigs and fixtures are YES NO
so designed that welding current cannot shunt through them?
-3-
PRI AC7110/4 REV E
6. PROCEDURE CONTROL
-4-
PRI AC7110/4 REV E
6.7 Certification
-5-
PRI AC7110/4 REV E
7. PROCESS CONTROL
7.1 Cleaning
-6-
PRI AC7110/4 REV E
7.1.5 Handling
Is there a documented procedure to ensure that after surface YES NO
preparation, parts are handled and protected to prevent
contamination?
7.2 Instructions
-7-
PRI AC7110/4 REV E
7.4.7 Register
Does the register include traceability to part number, serial numbers., YES NO
or lot/job numbers, production witness results, machine number, and
coupon weld times?
-8-
PRI AC7110/4 REV E
7.4.9 Requalification
Is there a documented procedure to ensure that where the assigned
YES NO
cause is attributed to the qualified machine/schedule being unable to
produce acceptable welds , the supplier stops welding and requalifies
the machine/schedule in accordance with the applicable specification
requirement?
8. PERSONNEL
-9-
PRI AC7110/4 REV E
9.2 Traceability
Are welded parts traceable to the welding machine, approved YES NO
procedure, operator, and inspector?
- 10 -
PRI AC7110/4 REV E
9.7 Records
Is there a documented procedure that defines the record retention YES NO
requirements for inspection records, including radiographic films or
digital equivalent?
- 11 -
PRI AC7110/4 REV E
11. COMPLIANCE
NOTE: Compliance to applicable specifications and customer
requirements shall be demonstrated by auditing two in-process jobs.
Copy of procedure/technique to be submitted for each job audit.
Job Identification
Drawing #
Part Name
Material Name
Material Specification
Top Thickness
Intermediate Thickness(es)
Bottom Thickness
Number of Sheets
Operation Sequence Number
Operator
- 12 -
PRI AC7110/4 REV E
- 13 -
PRI AC7110/4 REV E
11.13 Calibration
Is equipment calibrated in accordance with established procedures? YES NO
- 14 -
PRI AC7110/4 REV E
12. COMPLIANCE
NOTE: Compliance to applicable specifications and customer
requirements shall be demonstrated by auditing two in-process jobs.
Copy of procedure/technique to be submitted for each job audit.
Job Identification
Drawing #
Part Name
Material Name
Material Specification
Top Thickness
Intermediate Thickness(es)
Bottom Thickness
Number of Sheets
Operation Sequence Number
Operator
- 15 -
PRI AC7110/4 REV E
- 16 -
PRI AC7110/4 REV E
12.13 Calibration
Is equipment calibrated in accordance with established procedures? YES NO
- 17 -
PRI AC7110/4 REV E
SUPPLEMENTS
A If this supplement is not required / identified in the audit scope, check N/A
- 18 -
PRI AC7110/4 REV E
B If this supplement is not required / identified in the audit scope, check N/A
- 19 -
PRI AC7110/4 REV E
C If this supplement is not required / identified in the audit scope, check N/A
- 20 -
PRI AC7110/4 REV E
D If this supplement is not required / identified in the audit scope, check N/A
- 21 -
PRI AC7110/4 REV E
E If this supplement is not required / identified in the audit scope, check N/A
E.3 Receiving
- 22 -
PRI AC7110/4 REV E
E.4 Storage/Release
E.4.3.1 Compliance
Are filler material access procedures being followed? YES NO
- 23 -
PRI AC7110/4 REV E
E.6 Identification
- 24 -
PRI AC7110/4 REV E
F If this supplement is not required / identified in the audit scope, check N/A
- 25 -
PRI AC7110/4 REV E
G If this supplement is not required / identified in the audit scope, check N/A
- 26 -
PRI AC7110/4 REV E
H If this supplement is not required / identified in the audit scope, check N/A
- 27 -