You are on page 1of 2

Substation Hand Book

1- Preface
2- Volume I : Testing and commissioning
1.0 Transformer
1.1 Power Tran
1.1 Pre checks
1.2 Testing Procedures
1.4.1. Insulation Resistance measurement
1.4.2.Ratio and Vector Group.
1.4.3.DC Winding Resistance Test
1.4.4.MAGNETIZING CURRENT MEASUREMENT.
1.4.5.MEASUREMENT OF TAN DELTA &
CAPACITANCE.
1.4.6.Calibration of Temp. Indicators.
1.4.7.Gradient check of Winding Temperature
indicators.
1.4.8.Bushing Current transformer for WTI checks.
1.4.9.Insulation resistance check of devices.
1.4.10.Protective device wiring/operation check.
1.4.11Final checks
1.3 Method of statement
1.4 Test formats

2.0 Medium Voltage Switchgear


2.1 Index
2.2 Pre checks
2.3 Testing procedures
2.4 Method of Statement
2.5 Test Formats

3- Volume II : Installation.
Transformer :
1.1 Pre checks

You might also like