You are on page 1of 2

EQUIPMENT MAINTENANCE SCHEDULE

EQUIPMENT TYPE OVEN /DECKER OVEN

EQUIPMENT CODE Lager mania 00clan23

LOCATION KITCHEN LABORATORY

Schedule for the Month of March

ACTIVITIES MANPOWE

Weekly

Monthly
Daily

Remarks
Day Every Other

Day Every 15th


R

1. Check the oven


condition
Laboratory
specially the x
gas tank if its Admin
functioning
well.
2. Check the oven
hose if there
Laboratory
will be no x
Admin
leaks.

3. Check the oven


Laboratory
top ranges if x
its working all. Admin

4. Check the
temperature if
Laboratory
its functioning x
well in exact Admin
heat.

Prepared by: Noted by:

Chrislyn O. Ilagan Mrs. Dionesia Muana

You might also like