C1 C2 C3 C4 C5 C6
2-12T+2-12T EXTRA 2-12T EXTRA 2-16T Through 3-12T+2-16T EXTRA 2-16T EXTRA
2-12T THROUGH 3-12T THROUGH
3-12T THROUGH
3-16T EXTRA 2-16T EXTRA 2-16T EXTRA 2-12T EXTRA
2-12T EXTRA
LRB1 FB 1 C6 FB 2 C5 FB 3 C4
3-12T THROUGH
8T@150 C/C 8T@150 C/C 8T@150 C/C
8T@125 C/C RING RING RING
2-16T+1-12T EXTRA
C1 C2 C3 C4 C5 C6
3-12T THROUGH 3-12T THROUGH
2-16T EXTRA 2-16T EXTRA
3-16T THROUGH 3-16T EXTRA 3-12T THROUGH 2-12T EXTRA
3-12T THROUGH
MB2
3-16T EXTRA 2-16T EXTRA 2-16T EXTRA 2-12T EXTRA
3-12 THROUGH
8T@150C/C
8T@125C/C
2-12T EXTRA 2-12T EXTRA
3-16T EXTRA
2-12T EXTRA 2-12T EXTRA
FB 1
4 C3 SHIFT TO WALL
3-12T THROUGH
FB8T@150
5 C2C/C FB 6 2-12T EXTRA BOTH SIDE
MB3
2-12T+2-12T EXTRA 2-16T EXTRA
2-12T THROUGH
8T@125 C/C
RING 2-16T+1-12T EXTRA
8T@125C/C
2-16T EXTRA
3-16T EXTRA
3-12T THROUGH
FB8T@150
6 C1C/C 3-12T THROUGH
4-12T MARGINAL BEAM RING
8T@150C/C
C3 MB4/MB5
1 2
2.
ALL DIMENSIONS ARE IN MM UNLESS NOTED.
COVER SHOULD BE 25 MM
GREEN PARK , MP
MOB: 9827079978 3. DIMENSIONS SHOULD BE CHECKED AND VERIFIED ON SITE BEFORE EXECUTION OF WORK. GENERAL NOTES: GOOD FOR DETAIL OF RC BEAM 2 FLOOR
PROJECT: JOB NO: 2016 / 07