125
225
RUNNING LONGITUDINALLY
PRECAST CONCRETE 200mm CONSOLIDATED THICKNESS 100
DROP INLET CHAMBER OF GRADED GRANITE AGGREGATE
SUBGRADE
ON
350
BASE COURSE
TI
m un 1000
TRANSI
CONC.
B BASE COURSE
SLAB
3m
CEMENT DUST
ni
Mi
500
(1:10)
D PAVEMENT
B
GI PIPE
40m
BACKFILL MATERIAL
GI
RI
3m
RED 1mm THICK
ALUMINIUM PLATE 3m 40m
CROSS SECTION OF TRENCH 1 m DEPTH
RIGID PAVEMENT
TO BE ENGRAVED CONC. 1 : 30
TRANSITION
SLAB
3m
3m
LIGHT 4 NOS. 100mm DIA G.I. PIPE WITH TRAFFIC LIGHT CABLE MARKER
TO BE LAID 1m BELOW FINISHED LEVEL
3m 6 NOS. 100mm DIA G.I. PIPE WITH TRAFFIC LIGHT CABLE MARKER
TO BE LAID 1m BELOW FINISHED LEVEL
(FOR SLIP ROAD THAT LEADS TO TRAFFIC CONTROLLER)
3m 3m
1mm THICK ALUMINIUM PLATE 40m
RIGID PAVEMENT
RI
CONC.
GI
SLAB
m
1 : 1
40m
A ROAD JUNCTION
A
( ALSO APPLICABLE TO OTHER CONFIGURATION
TRANSI
CONCRETE
3m
1 : 1000
TION
DATE OF REVISION
NOTES:-
STANDARD DETAIL
A. 05-05-2008
1. FOR ROADS IN INDUSTRIAL ESTATE, THE LENGTH OF RIGID PAVEMENT TO BE
B. 12-08-2009
INCREASED TO 50m.
1-5