Professional Documents
Culture Documents
2015
General
Fluid: Water @ 20 C
= 1000 kg/m3 = 9810 N/m3
patm = 1.013 bar g= 9.81 m/s2
pv = 0.024 bar = 3.1416
= 0.001 kg/m/s (N s/m2)
Z = 6 m
p/ = 0 m
v2/2g = kN*Q2 m
kN = 8/(2gdN4)
= 13220.3
Discharge Pipe
4" steel pipe sch 40 ID = 102.00 mm
L = 100 m
e = 0.045 mm
Asume v = 3.7 m/s .. (when operating @ BEP)
Re = 3.81E+05
f = 0.01767
fL/d = 17.32
K = 3.0
kD = 15514.62 s2/m5
Suction Pipe
5" steel pipe sch 40 ID = 128.00 mm
L= 10 m
e = 0.045 mm
Asume v = 2.4 m/s .. (when operating @ BEP)
Re = 3.04E+05
f = 0.01739
fL/d = 1.36
K = 1.0
kS = 725.89 s2/m5
1) Operation point
NPSH Hsys-
Q [m3/h] Hp [m] [m] Hsys
R 2
60.0 35.80 0.610 5.50 14.18 16.18
70.0 35.40 0.640 5.75 17.14 19.14
80.0 34.80 0.660 6.00 20.55 22.55
90.0 34.00 0.680 6.25 24.41 26.41
100.0 33.10 0.700 6.50 28.73 30.73
110.0 31.80 0.715 6.80 33.51 35.51
120.0 30.00 0.705 7.10 38.73 40.73
130.0 27.30 0.670 7.40 44.42 46.42
50.00
45.00
40.00
35.00
H [m]
30.00
25.00
20.00
15.00
10.00
50.0 60.0 70.0 80.0 90.0 100.0 110.0 120.0 130.0 140.0
Q [m3/h]
vS = 1.94 m/s
Pd = ?
hP = p/ + Z + v2/2g
hp = 34 m
Z = 0 m
v /2g = 0.28
2
m m
p/ = (pd-ps)/ = 33.7 m ZS = 0 m
hLS = 0.45 m Z1 = -2 bar
ps/ = -2.65 m p1 = 0
pd/ = 31.07 m
3.05 bar
4) Changing Speed
N1 = 1450
N2 = 1300
1450 1300
Q Hp Q Hp
[m3/h] [m] [m3/h] [m]
60.0 35.80 0.610 53.793 28.776 0.610
70.0 35.40 0.640 62.759 28.455 0.640
80.0 34.80 0.660 71.724 27.972 0.660
90.0 34.00 0.680 80.69 27.329 0.680
100.0 33.10 0.700 89.655 26.606 0.700
110.0 31.80 0.715 98.621 25.561 0.715
120.0 30.00 0.705 107.59 24.114 0.705
130.0 27.30 0.670 116.55 21.944 0.670
Q [m3/h] 0 112.5 145 195 230 270
H [m] 35.9 35.9 35.8 35.7 35.5 35
0.000 0.500 0.600 0.700 0.750 0.800
NPSHR [m] 1.6 1.6 1.8 2 2.1 2.5