True/False
Question
The problems of congestion, bottlenecks and backtracking can not be visualized by using
templates and models.
Correct Answer
False
Your Answer
False
True/False
Question
Skill of labour force in a product type layout is usually higher than in the process type of
layout
Correct Answer
False
Your Answer
True
True/False
Question
Recording of movement is not necessary in case of method study in any form.
Correct Answer
False
Your Answer
True
True/False
Question
Inspection should be conducted on all incoming materials, semifinished items, bought out
components, subcontract items prior to any operation, assembly.
Correct Answer
True
Your Answer
True
True/False
Question
A load chart specifies the work to be carried out by each person of company during shift
hours.
Correct Answer
False
Your Answer
False
True/False
Question
Breakdown is inversly proportional to the investment in W.I.P.
Correct Answer
False
Your Answer
True
True/False
Question
short cycle job should be studied for macroscopic motions.
Correct Answer
False
Your Answer
True
Select The Blank
Question
The ________ is a set of tools and techniques by which products are made to comply with
the specifications at minimum cost to the firm.
Correct Answer
Quality control system
Your Answer
Quality control system
True/False
Question
Inspection Order can be a verbal order
Correct Answer
True
Your Answer
False
True/False
Question
In case of backward pass computation, the latest event time of the end event equals to the
earliest event time minus duration of that activity.
Correct Answer
False
Your Answer
True
True/False
Question
In Gantt Chart, the horizontal lines devide vertical lines into sections which represents either
operations or work centres.
Correct Answer
True
Your Answer
True
True/False
Question
In case of two handed process chart, the simultaneous activities of both hands are recorded
opposite to each other on the chart.
Correct Answer
True
Your Answer
True
True/False
Question
An activity should represent an operation or set of operations which can be performed using
a particular kind of equipment or a special skill.
Correct Answer
True
Your Answer
True
True/False
Question
In case of X bar, if the process is not under control indicated by some points falling outside
the control limits, such points outside the control limits are eliminated and new trial control
limits for the remaining points are computed.
Correct Answer
True
Your Answer
True
True/False
Question
After goods have been manufactured, route sheets and operation layouts should not be
collected back.
Correct Answer
Falsek
Your Answer
False
True/False
Question
Planned lubrication is said to be the nervous system of the equipment.
Correct Answer
True
Your Answer
True
True/False
Question
An activity can share the same tail event and same head event with any other activity.
Correct Answer
False
Your Answer
True
True/False
Question
Only skilled worker can use the fixed limit gauge.
Correct Answer
False
Your Answer
False
True/False
Question
Breakdown of machines, absenteeism of worker does not dislocate the manufacturing
activity in process layout
Correct Answer
True
Your Answer
True
True/False
Question
Dust gets mixed with lubricants, forms an abrasive substance and causes pre-mature failure
of machinery.
Correct Answer
True
Your Answer
True
True/False
Question
Operation process charts though indicates the sequence of events but do not show
movements.
Correct Answer
True
Your Answer
True
POM Assignment
Multiple Choice Multiple Answer
Question
Which of the following aspects are essential to ensure quality of purchased items?
Correct Answer
Defining right quality for the job , Vendor performance evaluation , Making sure that
suppliers understand the requirements
Your Answer
Defining right quality for the job , Vendor performance evaluation , Making sure that
suppliers understand the requirements
True/False
Question
After goods have been manufactured, route sheets and operation layouts should not be
collected back.
Correct Answer
False
Your Answer
False
True/False
Question
In case of centralised inspection, inspection rooms generally become bottleneck and cause
delay in taking action regarding rejection or rework.
Correct Answer
True
Your Answer
True
True/False
Question
During set up of X bar-R control chart, control limts should be practically revised from time
to time as additional data is accumulated.
Correct Answer
True
Your Answer
False
Multiple Choice Multiple Answer
Question
Which of the following are the basic requirements of quality standard?
Correct Answer
Deifinite , Undesrstandable , Economically viable
Your Answer
Absolute uniformity , Undesrstandable , Economically viable
True/False
Question
Floor inspection delays the identification of faults which can not be rectified immediately
before large lots are spoiled.
Correct Answer
False
Your Answer
False
True/False
Question
Cent percent inspection is required on WIP prior to the key, critical or costly operation.
Correct Answer
True
Your Answer
True
True/False
Question
Repetitive movements between work stations which are difficult to be traced on string
diagrams can be conveniently shown on flow diagrams.
Correct Answer
False
Your Answer
True
True/False
Question
An activity can share the same tail event and same head event with any other activity.
Correct Answer
False
Your Answer
True
Select The Blank
Question
The ________ must ensure that the product satisfy the functional requirements of it's
usage.
Correct Answer
Quality of design
Your Answer
Quality of design
True/False
Question
Independent float either affects the float of preceding activities or that of succeeding
activities.
Correct Answer
False
Your Answer
False
True/False
Question
F W Taylor devised a system for classifying motions into basic divisions called Therbligs
Correct Answer
False
Your Answer
False
True/False
Question
As a general rule, the number of tail event of an activity is more than that of it's head
event.
Correct Answer
False
Your Answer
False
Select The Blank
Question
The ________ is the probability that a good lot will be rejected by the sampling plan.
Correct Answer
Producer's risk
Your Answer
Producer's risk
True/False
Question
All activities must not be tied up into the network
Correct Answer
False
Your Answer
False
True/False
Question
In case of X bar, if the process is not under control indicated by some points falling outside
the control limits, such points outside the control limits are eliminated and new trial control
limits for the remaining points are computed.
Correct Answer
True
Your Answer
True
True/False
Question
Inspection order is must even for simple jobs which can be inspected by shop inspector with
the tooling available on shop.
Correct Answer
False
Your Answer
False
True/False
Question
A load chart specifies the work to be carried out by each person of company during shift
hours.
Correct Answer
False
Your Answer
True
True/False
Question
Cellular layout is based on the concept of Group Technology
Correct Answer
True
Your Answer
True
True/False
Question
In case of forward pass computation, the earliest event time of the first event is zero.
Correct Answer
True
Your Answer
True
True/False
Question
As a general rule, a site five times the actual plant size is considered minimum for parking,
access facilities and future expansion.
Correct Answer
True
Your Answer
True
True/False
Question
Independent float either affects the float of preceding activities or that of succeeding
activities.
Correct Answer
False
Your Answer
False