Different options available in NETCH.

Processing key for MRP - NETCH


What are schedule lines? Impact of schedule lines in MRP.
REMS - what is Product Cost Collector?
Difference between PP-PI & Discrete manufacturing?
What is Material Staging?
How does COGI gets impacted in shop floor order settlement? How & why is it bein
g impacted?
At what level does batches be unique?
What is milestone confirmation / operation based confirmation?
Definition of work centre - resources through which one achieves something?
Variant configuration
Sales & Operations planning
PP-PM integration - basic concepts
PP-CO - activity based costing, how is it done? Where is the activity first assi
gned to?
enhancements / developments surrounding PP module
order type dependent parameters, auto batch determination logic
special procurement key
interface with legacy
strategy type 10, 11 difference
concept

LIMS integration - Lab information management system


Typical quality inspection types
Are all quality inspections through inspection plans?