What are schedule lines? Impact of schedule lines in MRP. REMS - what is Product Cost Collector? Difference between PP-PI & Discrete manufacturing? What is Material Staging? How does COGI gets impacted in shop floor order settlement? How & why is it bein g impacted? At what level does batches be unique? What is milestone confirmation / operation based confirmation? Definition of work centre - resources through which one achieves something? Variant configuration Sales & Operations planning PP-PM integration - basic concepts PP-CO - activity based costing, how is it done? Where is the activity first assi gned to? enhancements / developments surrounding PP module order type dependent parameters, auto batch determination logic special procurement key interface with legacy strategy type 10, 11 difference concept
LIMS integration - Lab information management system
Typical quality inspection types Are all quality inspections through inspection plans?