Professional Documents
Culture Documents
PI Q Pi Pwf
units: bbl(STO)/day/psi
(used also for Gas well: scf/day/psi)
Ex: Q= 3000 BOPD
Pwf= 4500 psi P.I.= 3 bbl/day/psi
Pi= 5500 psi
That means , the well produced 3 bbls STO per day, per each psi
of drawdown.
MAXIMUM FLOW POTENTIAL
or
ABSOLUTE OPEN FLOW :
bopd
2000 3000
OIL WELL : (AOF)
Note: The inverse slope of the IPR curve is the Productivity Index
Oil Well Testing: (DST program)
Initial flow period, from 5 to 10 minutes.
Initial shut-in period, from 30minutes to 1 hour.
Clean up period, till clean.
Flowing period, from few hours to several days.
10
LOW Productivity Gas Wells: A.O.F.
ISOCHRONAL PRESSURE TEST
12
LOW Productivity Gas Wells: A.O.F.
MODIFIED ISOCHRONAL PRESSURE TEST
14
Productivity