REQUIREMENTS FOR LIGHT RAIL SYSTEM LINE 2 (LRT 2) TRANSITS The Manila Light Rail Transit 1. MANILA LIGHT RAIL TRANSIT System Line 2, also known as SYSTEM LINE 1 (LRT 1) LRT Line 2, LRT-2, or Megatren, is a rapid transit line The Manila Light Rail Transit in Metro Manila in the System Line 1 is the first metro Philippines, generally running in line of the Manila Light Rail Transit an east-west direction along the System. Presently, the line contains Radial Road 6 and a portion of twenty stations and runs on 19.65 the Circumferential Road 1. kilometers (12.21 mi) of fully Although operated by the Light elevated route. The line is colored Rail Transit Authority, resulting yellow (old) and green (new) on all in its being called "LRT-2", it is LRT maps. actually a heavy rail, rapid transit system owing to its use The line runs in a general north- of electric multiple units instead south direction from Baclaran to of the light rail vehicles used in Monumento; then, it runs in an earlier lines and is the only line east-west direction from utilizing such type of system in Monumento to North Avenue, the country. Envisioned in the linking the cities of Quezon City, 1970s as part of the Caloocan, Manila, Pasay, and Metropolitan Manila Strategic Paraaque. Passengers can Mass Rail Transit Development transfer to the Line 2 at Doroteo Plan, the eleven-station, 13.8- Jose station, while passengers can kilometer (8.6 mi) line was the transfer to the Line 3 at EDSA and third rapid transit line to be built North Avenue stations. in Metro Manila when it started operations in 2003. Technical: Technical: Track length 19.65 km (12.21 mi) Track gauge 1,435 mm (4 ft 8 in) Track length 13.8 km (8.6 mi) standard gauge Track gauge 1,435 mm (4 ft 8 in) Minimum radius 170 meters (558 ft) standard gauge Mainline 25 meters (82 ft) Depot Electrification Overhead lines Electrification Overhead lines Operating speed 60-80km/h (37-50 Operating speed 40-60 km/h (25-37 mph) mph) 3. MANILA METRO RAIL TRANSIT Although the line is aimed at SYSTEM (MRT Lines 3) reducing traffic congestion and travel time along EDSA, the The Manila Metro Rail Transit transportation system has only System, also known as the been partially successful due to MRT Line 3, MRT-3, or the DOTC's inaction on the Metrostar Express, is a rapid private sector's proposals to transit system of Metro Manila, expand the capacity of the Philippines, and is composed of system to take up to 1.1 million a single line that runs along the passengers a day. Expanding north and south lanes of the network's capacity to Epifanio de los Santos Avenue accommodate the rising number (EDSA). Although it has the of passengers is currently set characteristics of light rail, such on tackling this problem. as with the type of rolling stock used, it is more akin to a rapid Technical: transit system owing to its total grade separation and high Track length 16.9 km (10.5 mi) passenger throughput. Track gauge 1,435 mm (4 ft 8 in) standard gauge MRT-3 is integrated with the Minimum radius 370 meters public transit system in Metro (1,213.9108 ft) Mainline / 25 meters Manila, and passengers also (82 ft) Depot take various forms of road- Electrification 750 V DC Overhead based public transport, such as lines buses, to and from a station to Operating speed 40-60 km/h (25-37 reach their intended destination. mph)