TESTING MANUAL
Prepared by:
More over it is our one of the main objectives to make this manual
as a reference guide for the newly inducted engineers to have
awareness in new substation activities .
Scope.
This manual covers procedures of installation and commisisoing
Preface
We feel this procedure will make the engineers aware about the
commissioning procedures of the switchgears to a professional level.
All the commissioning department Switchgear engineers are fully
committed to put our all future experiences in revising this
procedure to make it more professional & Systematic.
Contents.
1. Transformer
1.1. Basic theory
1.2. General
1.2.1. Transportation and receiving.
1.2.2. Storage at site
1.3. Assembly and Installation
1.3.1. procedure.
1.3.1.1.Aux Transformer
1.3.1.2.Power Transformer
1.3.2. Check lists
1.3.2.1.Aux Transformer
1.3.2.2.Power Transformer
1.3.3. Method of statement.
1.4. Commissioning.
1.4.1. procedure
1.4.1.1. Aux Transformer
1.4.1.2. Power transformer
1.4.2. Test forms
1.4.2.1. Aux Transformer
1.4.2.2 Power transformer