CODE OF INSTRUCTIONPT-MB-2-SOI-T-08-01-1D
43 Check and Confrim N2 system and chemical clean injection to no.6 LP Heater start up venting pipe at tube side
44 Chek and confrim no.6 LP Heater venting pipe at tube side 3 of the hand valves and close after priming process
45 Check and confrim no.6 LP Heater operation vent hand valve (10LCJ60AA501) is Open
46 Check and Confrim no.6 LP Heater start up vent hand valve A (10LCJ63AA501) and close after start up is Open
47 check and confrim no.6 LP Heater start up vent hand valve B (10LCJ63AA502) and close after start up is open
48 Check and Confrim no.6 LP Heater water level gauge (LIT) steam side hand valve (KKS) is Open
50 Check and Confrim no.6 LP Heater water level gauge (LIT) water side hand valve (KKS) is Open
51 Check and Confrm no.6 LP Heater water level transmitter A (LT) steam side hand valve (KKS) is Open
52 Check and Confrim no.6 LP Heater water level transmitter A (LT) water side hand valve (KKS) is Open
53 Check and Confrim no.6 LP Heater water level transmitter B (LT) steam side hand valve (KKS) is Open
54 Check and Confrim no.6 LP Heater water level transmitter B (LT) water side hand valve (KKS) is Open
55 Check and confrim no.6 LP Heater feed water inlet motorized valve (10LCA70AA001)is power on and Open
56 check and confrim no.6 LP Heater feed water outlet motorized valve (10LCA70AA002) is power on and Open
57 Check and Confrim no.6 LP Heater feed water bypass motorized valve (10LCA40AA004) is Power on and Close
58 check and confrim no.6 LP Heater emergency drain pneumatic control valve (10LCJ62AA101) outlet hand valve
59 check and confrim no.6 LP Heater emergency drain pneumatic control valve (10LCJ62AA101) outlet hand valve
60 check and confrim instrument air hand valve to pneumatic control valve (10LCJ62AA101) and check valve is op
61 check and confrim no.6 LP Heater normal drain pneumatic control valve (10LCJ61AA101) inlet hand valve (10LC
62 check and confrim no.6 LP Heater normal drain pneumatic control valve (10LCJ61AA101) outlet hand valve (10L
63 check and confrim instrument air hand valve to pneumatic control valve (10LCJ61AA101) and check valve is op
64 Check and Confrim no.5 LP Heater drain to no.6 LP Heater pneumatic control valve (10LCJ51AA101) outlet hand
65 Check and confrim no.5 LP Heater drain to no.6 LP Heater pneumatic control valve (10LCJ51AA101) inlet hand v
66 check and confrim instrument air hand valve to pneumatic control valve (10LCJ51AA101) and check valve is op
67 check and confrim no.6 LP Heater bled steam line drain primary hand valve (KKS) ( before bled steam motorize
check and confrim instrument air hand valve to no.6 LP Heater bled steam line drain secondary pneumatic valv
68
(before bled steam motorized valve) is open
69 Check and Confrim no.6 LP Heater bled steam line drain primary hand valve (KKS) ( after bled steam motorized
Check and Confrim instrument air hand valve to no.6 LP Heater bled steam line drain secondary pneumatic valv
70
(after bled steam motorized valve) is Open
71 Check and Confrim no.6 LP Heater bled steam line drain primary hand valve (KKS) after pneumatic check valve
Check and confrim instrument air hand valve to no.6 LP Heater bled steam line drain secondary pneumatic valv
72
(after pneumatic check valve) is Open
73 Check and Confrim no.6 LP Heater bled steam motorized valve (10LBS60AA001) is Power On and Open
74 check and confrim Open instrument air hand valve to no.6 LP Heater bled steam and check valve (10LBS60AA0
75 After Check and confrim all equiment no.6 LP Heater, check and confrim
76 Check and Confrim no.7 LP Heater drain at tube side primary hand valve (KKS) is Close
77 Check and Confrim no.7 LP Heater drain at tube side secondary hand valve (KKS) is Close
78 Check and Confrim no.7 LP Heater drain shell side hand valve A (KKS) is close
79 check and confrim no.7 LP Heater drain shell side hand valve B (KKS) is close
80 Check and confrim N2 system and chemical clean injection to no.7 LP Heater start up vent isolating hand valve
81 Check and confrim N2 system and chemical clean injection to no.7 LP Heater start up venting pipe at tube side
82 check and confrim no.7 LP Heater venting pipe at tube side 3 of the hand valves and close valves after priming
83 check and confrim no.7 LP Heater operation vent hand valve (10LCJ60AA501) is open
84 check and confrim Open no.7 LP Heater start up vent hand valve A (10LCJ73AA501) and close valve after start
85 chec and confrim Open no.7 LP Heater start up vent hand valve B (10LCJ73AA502) and close valve after start u
86 check and confrim no.7 LP Heater water level gauge (LIT) steam side hand valve (KKS) is open
87 check and confrim no.7 LP Heater water level gauge (LIT) water side hand valve (KKS) is open
88 check and confrim no.7 LP Heater water level transmitter A (LT) steam side hand valve (KKS) is open
89 check and confrim no.7 LP Heater water level transmitter A (LT) water side hand valve (KKS) is open
90 check and confrrim no.7 LP Heater water level transmitter B (LT) steam side hand valve (KKS) is open
91 check anno.7 LP Heater water level transmitter B (LT) water side hand valve (KKS) is open
92 check and confrm no.7 LP Heater feed water inlet motorized valve (10LCA60AA001) is power on and open
93 check and confrim no.7 LP Heater feed water outlet motorized valve (10LCA60AA002) is power on and open
94 check and confrim no.7 LP Heater feed water bypass motorized valve (10LCA40AA003) is power on and close
95 check and confrim no.7 LP Heater emergency drain pneumatic control valve (10LCJ72AA101) outlet hand valve
96 check and confrim no.7 LP Heater emergency drain pneumatic control valve (10LCJ72AA101) outlet hand valve
97 check and confrim open instrument air hand valve to pneumatic control valve (10LCJ72AA101) and check valve
98 check and confrim no.7 LP Heater drain pump A suction filter drain hand valve (KKS) is open
99 check and confrim no.7 LP Heater drain pump B suction filter drain hand valve (KKS) is open
100 check and confrim no.7 LP Heater drain pump A suction filter inlet hand valve (10LCJ91AA251) is open
101 check and confrim no.7 LP Heater drain pump A discharge motorized valve (10LCJ93AA001) is power on and clo
102 check and confrim no.7 LP Heater drain pump A (10LCJ91AP001) after condensate water system available confi
103 check and confrim 7 LP Heater drain pump B suction filter drain hand valve (10LCJ92AA251) is open
104 check and confrim no.7 LP Heater drain pump B discharge motorizd valve (10LCJ94AA001)is open and power on
105 check and confrim no.7 LP Heater drain pump B (10LCJ92AP001) after condensate water system available confi
check and confrim no.7 LP Heater drain to no.8 LP Heater to deaerator condensate water pipe pneumatic contr
106
open
Open instrument air hand valve (KKS) to no.7 LP Heater drain to no.8 LP Heater to deaerator condensate water
107
and check valve is operative.
108 check and confrim no.7 LP Heater drain pump recirculation motorized valve (10LCJ95AA001) is power on and cl
109 check and confrim no.6 LP Heater drain to no.7 LP Heater pneumatic control valve (10LCJ61AA101) outlet hand
110 Check and confrim no.6 LP Heater drain to no.7 LP Heater pneumatic control valve (10LCJ61AA101) inlet hand
111 check and confrim Open instrument air hand valve (KKS) to pneumatic control valve (10LCJ61AA101) and check
112 check and confrim no.7 LP Heater bled steam line drain primary hand valve (KKS) (before bled steam pneumati
check and confrim Open instrument air hand valve (KKS) to no.7 LP Heater bled steam line drain secondary pne
113
is close (before bled steam pneumatic check valve).
114 Check and confrim no.7 LP Heater bled steam line drain primary hand valve (KKS) (after bled steam pneumatic
check and confrim Open instrument air hand valve (KKS) to no.7 LP Heater bled steam line drain secondary pne
115
is close (after bled steam pneumatic check valve).
116 Open instrument air hand valve (KKS) to no.7 LP Heater bled steam pneumatic check valve(10LBS70AA002) an
117 check and confrim no.7 LP Heater bed steam motorized valve (10LBS70AA001) is power on and open
118 After Check and confrim all equiment no.7LP Heater, check and confrim No.8
119 Check and confrim no.8 LP Heater drain at tube side primary hand valve (KKS) is close
120 Check and confrim no.8 LP Heater drain at tube side scondary hand valve (KKS)is close
121 Check and confrim no.8 LP Heater drain at shell side hand valve A (KKS) is close
122 Check and confrim no.8 LP Heater drain at shell side hand valve B (KKS)is close
123 Check and confrim no.8 LP Heater drain at tube side and shell side N2 system and chemical clean (2 off totally)
124 check and confrim no.8 LP Heater vent at tube side (3 off totally) hand valve (KKS) close valve after priming pro
125 check and confrim no.8 LP Heater operation vent hand valve (10LCJ80AA501) is open
126 check and confrim no.8 LP Heater start up vent hand valve A (10LCJ83AA501) close valve after start up is open
127 check and confrim no.8 LP Heater start up vent hand valve B (10LCJ83AA502) close valve after start up is open
128 check and confrim no.8 LP Heater water level gauge (LIT) steam side hand valve (KKS) is open
129 check and confrim no.8 LP Heater water level gauge (LIT) water side hand valve (KKS) is open
130 check and confrim no.8 LP Heater water level transmitter A steam side hand valve (KKS) Is open
131 check and confrim no.8 LP Heater water level transmitter B water side hand valve (KKS) is open
132 check and confrim no.8 LP Heater water level transmitter B steam side hand valve (KKS) is open
133 check and confrim no.8 LP Heater water level tansmitter B water side hand valve (KKS)is open
134 check and confrim no.8 LP Heater feed water inlet motorized valve (10LCA50AA001) is power on and open
135 check and confrim no.8 LP Heater feed water outlet motorized valve (10LCA50AA002) is power on and open
136 check and confrim no.8 LP Heater feedwater bypass motorized valve (10LCA40AA002) is power on and open
137 check and confrim no.8 LP Heater emergenccy drain pneumatic control valve (10LCJ82AA101) inlet hand valve
138 no.8 LP Heater emergenccy drain pneumatic control valve (10LCJ82AA101) outlet hand valve (10LCJ82AA252) i
check and confrim instrument air supply hand valve (KKS) to no.8 LP Heater emergency drain pneumatic contro
139
put in service and open
140 check and confrim no.8 LP Heater normal drain pneumatic control valve (10LCJ81AA101) inlet hand valve (10L
141 check and confrim no.8 LP Heater normal drain pneumatic control valve (10LCJ81AA101) outlet hand valve (10
check and confrim instrument air supply hand valve (KKS) to no.8 LP Heater normal drain pneumatic control va
142
in service and open
143 Check and confrim no.8 LP Heater bled steam steam line darin primary hand valve (KKS) (before bled steam m
check and confrim instrument air supply hand valve (KKS) to no.8 LP Heater bled steam line drain secondary p
144
valve closed (before bled steam motorized valve) put in service and open.
145 Check and confrim no.8 LP Heater bled steam steam line darin primary hand valve (KKS) (after bled steam mo
check and confrim open instrument air supply hand valve (KKS) to.8 LP Heater bled steam line drain secondary
146
valve close (after bld steam motorized valve)
147 check and confrim no.8 LP Heater bled steam motorized valve (10LBS80AA001) is power on and open
Check and confrim all lp Heater in service and report to supervis
END OF PROCEDURE
REMARK
TIONPT-MB/2/IOI/T/12/8B
SHIFT
MANAGER
:
SUPERVIS
OR :
OPERATO
R:
SITE
INSPECTI
ON BY :
EXECUTE
MENT CONTROL NORMAL STATUS
CONFIRMATION
cleared. Yes
Yes
, safety helmet, safety shoes, insulated
Yes
ffected by medication or alcohol. Yes
evention of electric short circuit Yes
be properly placed Yes
EXECUTE
DURE
CONFIRMATION
ment no.5 LP Heater
(10LCA81AA001).
system motorized valve (10LCA81AA002).
CA80AA001).
LCA80AA002).
0LCA40AA005).
AA101) inlet hand valve (10LCJ52AA251).
AA101) outlet hand valve (10LCJ52AA252).
n pneumatic cotrol valve (10LCJ52AA101) and check valve is
0AA001).
umatic check valve (10LBS50AA002) and check valve is opened.
Heater, check and confrim No.6 LP heater
close
is Close
Open
d close after start up is Open
d close after start up is open
(KKS) is Open
(KKS) is Open
valve (KKS) is Open
valve (KKS) is Open
valve (KKS) is Open
valve (KKS) is Open
001)is power on and Open
A002) is power on and Open
A004) is Power on and Close
CJ62AA101) outlet hand valve (10LCJ62AA251)is open
pen
1) and close valve after start up is finished.
2) and close valve after start up is finished.
(KKS) is open
KKS) is open
valve (KKS) is open
valve (KKS) is open
valve (KKS) is open
) is open
01) is power on and open
002) is power on and open
A003) is power on and close
team line drain secondary pneumatic valve (10LBS70AA401) and check valve
pen
ose valve after start up is open
se valve after start up is open
(KKS) is open
KKS) is open
e (KKS) Is open
e (KKS) is open
ve (KKS) is open
(KKS)is open
01) is power on and open
002) is power on and open
A002) is power on and open
END OF PROCEDURE