Introduction :
Assumptions :
Calculations :
1. 2 Nos. 3 core x 240 sq. mm. cable required as per attached annexure. In addition to this
1 No. 3 core x 240 sq. mm. cable as a spare, which can provide 55% spare power transfer capacity.
In case of first cable fault no power cut is required. Second cable fault, 55% capacity will be
available.
2. 2 Nos. 1 core x 240 sq. mm./ Phase (total 6 cables) cable required as per attached annexure.
2 No. 1 core x 240sq. mm. cable as a spare, which can provide redundancy upto any two cable
faults.
Cable Data :
Installation Ampacity Resi React. Dia. Weight Cost
Ohm/kM Ohm/kM mm kG/kM Rs./Mtr.
1c - 240 Air 445 0.161 0.101 39 1850 415
3c - 240 Air 317 0.161 0.085 71 6300 1093
Conclusion :