Quartz School for Well Site Supervisors

Module 8
Directional Drilling

Section 10
Manual Planning
Manual Planning

Tips for Well Planning Objectives:

Understand the triangles needed for planning:


Simple J shaped Wells
S shaped Wells
Double Build Wells
Plan wells in the simplest method available

2 IF. Rev 1
10/23/2009
Manual Planning

Overview

Manual well planning is essentially the manipulation of right-angle


triangles to compare differences in Displacement & TVD to place
each point in the wellbore.

The Tips are designed to help you determine which points you need
to connect to build the correct triangles to find the solution to the
problem.

3 IF. Rev 1
10/23/2009
Manual Planning

Keys for Triangles


Read and understand question properly
Use all the data in your drawing and equations
Draw large and clear diagram with right scale
Find right triangles
Know and use all triangles Tips
Connect triangles together to find the solution to the problem

4 IF. Rev 1
10/23/2009
Manual Planning Exercise J or Slant Well

Given Information:
Target Location= 1638.3 ft S and 1147.15 ft W
Targets TVD = 8500 ft
KOP = 1981 ft
Build Radius = 2291.83 ft

Solve for the following variables:


1. Profile drawing
2. Well Coordinate
3. Build up rate (BUR)
4. MAX hold angle
5. End of build (EOB) true vertical depth (TVD)
6. EOB Measured Depth
7. Total MD to the target

5 IF. Rev 1
10/23/2009
Vertical Section and Plan View Drawings

Given Information:
Target Location= 1638.3 ft S
and 1147.15 ft W
Targets TVD = 8500 ft
KOP = 1981 ft
Build Radius = 2291.83 ft

Solve for the following variables:


1. Profile drawing
2. Well Coordinate
3. Build up rate (BUR)
4. MAX hold angle
5. End of build (EOB) true vertical depth
6. EOB Measured Depth
7. Total MD to the target

6 IF. Rev 1
10/23/2009
Manual Planning Exercise S Type Well

Given Information:
Target Location= 3500 ft at 235 azm
Targets TVD = 12,000 ft
KOP = 6084 ft
Build up rate (BUR) = 3 grd/100ft
Drop off rate (DOR) = 2 grd/100ft

Solve for the following variables:


1.Profile drawing
2.Well Coordinate
3.Build and drop radius
4.MAX hold angle
5.EOB TVD
6.EOB MD
7.EOB displacement
8.Start of drop (SOD) MD
9.SOD TVD
10.SOD Displacement
11.Total MD to the target
7 IF. Rev 1
10/23/2009
Vertical Section and Plan View Drawings

Given Information:
Target Location= 3500 ft at 235 azm
Targets TVD = 12,000 ft
KOP = 6084 ft
Build up rate (BUR) = 3 grd/100ft
Drop off rate (DOR) = 2 grd/100ft

Solve for the following variables:


1.Profile drawing
2.Well Coordinate
3.Build and drop radius
4.MAX hold angle
5.EOB TVD
6.EOB MD
7.EOB displacement
8.Start of drop (SOD) MD
9.SOD TVD
10.SOD Displacement
11.Total MD to the target

8 IF. Rev 1
10/23/2009
Manual Planning
Tip 1

This Tip applies to J


profile wells only. Center of Radius of
Curvature

A line needs to be drawn


between the target and the
Center of Radius of Curvature.

Target
9 IF. Rev 1
10/23/2009
Manual Planning

Tip 1
This Tip applies to J
profile wells only.
Center of Radius of
Curvature

This then needs to be triangulated


by comparing the Displacement
and TVD

Target
10 IF. Rev 1
10/23/2009
Manual Planning

Tip 1

This Tip applies to J


profile wells only. Center of Radius of
Curvature

This can also be triangulated by


comparing the Displacement
and TVD the other way
However these angles dont add up
to either 90 or 180 making the
calculation more difficult
Target
11 IF. Rev 1
10/23/2009
Manual Planning

Tip 1
This Tip applies to J
profile wells only. Center of Radius
of Curvature

Whereas these angles add up to


180 making the calculation
easier to work through

Targe
12 IF. Rev 1
10/23/2009 t
Manual Planning

Tip 2

This Tip applies to Center of


Radius of
Horizontal profile & Curvature
1
double build wells. Here
we look at a double build:

A line needs to be drawn


between the Centers of Radius
of Curvature for each curve. Center of
Radius of
Curvature 2
13 IF. Rev 1
10/23/2009
Manual Planning

Tip 2
Center of
Radius of
Curvature 1
This Tip applies to S
profile & double build
wells. Here we look at
a double build:

These then also need to be


triangulated by comparing Center of
the Displacement and TVD Radius of
Curvature 2
14 IF. Rev 1
10/23/2009
Manual Planning

Tip 2
Center of
This Tip applies to S Radius of
Curvature 1
profile & double build
wells. Here is an S well:

A line needs to be drawn


between the Centers of Radius
of Curvature for each curve. Center of
Radius of
Curvature 2
15 IF. Rev 1
10/23/2009
Manual Planning

Tip 2

Center of
This Tip applies to S Radius of
Curvature
profile & double build 1

wells. Here is an S well:

This then needs to be triangulated


by comparing the Displacement
Center of
and TVD Radius of
Curvature 2
16 IF. Rev 1
10/23/2009
Manual Planning

Tip 3 Center of
Radius of
Curvature 1
This Tip applies to S
profile & double build
wells. Here is an S well:

The Radius of Curvature of one curve is


projected onto the other R of C as Center of
Radius of
an addition, as in this case, or a Curvature 2

subtraction.
17 IF. Rev 1
10/23/2009
Manual Planning

Tip 3
Center of
Radius of
Curvature 1
This Tip applies to S
profile & double build
wells. Here is an S well:

This is then triangulated by connecting


the outside end to the Center of
Radius of Curvature of the other
Center of
curve. Radius of
18 IF. Rev 1 Curvature 2
10/23/2009
Manual Planning

Tip 3
This Tip applies to S
Center of
profile & double build Radius of
Curvature 1
wells. Here is a double
build well:

The Radius of Curvature of one curve


is projected onto the other R of C
as, in this case, a subtraction.
Center of
Radius of
19 IF. Rev 1 Curvature 2
10/23/2009
Manual Planning

Tip 3

This Tip applies to S Center of


Radius of
profile & double build Curvature 1

wells. Here is a double


build well:

This is then triangulated by connecting


the inside end to the Center of
Radius of Curvature of the other
Center of
curve. Radius of
Curvature 2
20 IF. Rev 1
10/23/2009
Manual Planning

Tip 4
Center of
This Tip applies to all well Radius of
Curvature 1
profiles.

Key Points in the well path need to be


triangulated back to the nearest
Center of Radius of Curvature by
comparing relative Displacements Center of
Radius of
and TVDs. Curvature 2

21 IF. Rev 1
10/23/2009
Manual Planning

Summary
There are 4 Tips to Manual Well Planning:
For J wells
A line from the target to the Center of Radius
For S & Double Build Wells
A line joining the two centers of radius
A projection of one radius of curvature onto the other (+/-)
For all well profiles
Triangulate back to the nearest Center of Radius by comparing
relative displacement & TVD
22 IF. Rev 1