Professional Documents
Culture Documents
Petrol Station
Community Centre
& Kindergarten
Commercial Area
Surau
Option Of location 2
Shop Office Lot Underground Sewage
Treatment Plant
Drainage Outlet
+
Near to River
Low Gradient
Detention Pond
With Landscape
Playground Area
+
Single Storey Bungalow
Drainage Outlet
Near to River
Bungalow Lot Low Gradient Kawasan Lapang
With Landscape
Option Of location 1
Underground Sewage Detention Pond
Treatment Plant
Minimise haulage of waste materials such as soil, subsoil, rock, off site by redistribute on site.
Minimise cut and fill works by control & arrange the proposed level to suit with original ground floor.
Maintain the part of the green areas in the development area.
Maintain the natural catchment area by making it as a sediment pond during the construction phase and Propose Of Retaining Wall For The Area Which Has
upgrade it as a detention pond the completion of the construction phase. Higher Difference Of Platform Level.
Locating the Sewage Treatment Plant (STP) at lowest and remote area but at the same time near to the
discharge area.