You are on page 1of 2

49

Parts 100 to 185


Revised as of October 1, 2010

Transportation

Containing a codification of documents


of general applicability and future effect

As of October 1, 2010

With Ancillaries

Published by
Office of the Federal Register
National Archives and Records
Administration

A Special Edition of the Federal Register

US DOT

VerDate Mar<15>2010 15:30 Dec 30, 2010 Jkt 220213 PO 00000 Frm 00001 Fmt 8091 Sfmt 8091 Q:\49\X49\220213.XXX ofr150 PsN: PC150
178.35 49 CFR Ch. I (10110 Edition)

(vi) Verify threads by gauge; must be placed near the serial number.
(vii) Reporting volumetric capacity This information must be placed so
and tare weight (see report form) and that dates of subsequent tests can be
minimum thickness of wall noted; and easily added. An example of the mark-
(viii) Verifying that each cylinder is ings prescribed in this paragraph (f)(1)
marked in accordance with the applica- is as follows:
ble specification. DOT-3A1800 1800
(4) Furnish complete test reports re-
quired by this subpart to the maker of
1234
XY
1800 psi
the cylinder and, upon request, to the AB 595
purchaser. The test report must be re- Or;
tained by the inspector for fifteen DOT-3A18001234XY
years from the original test date of the AB 595
cylinder. Where:
(d) Defects and attachments. Cylinders
must conform to the following:
DOT-3A = specification number
1800 = service pressure

(1) A cylinder may not be constructed 1234 = serial number
of material with seams, cracks or lam- XY = symbol of manufacturer
inations, or other injurious defects. AB = inspectors mark
(2) Metal attachments to cylinders 595 = date of test
must have rounded or chamfered cor- (2) Additional required marking must
ners or must be protected in such a be applied to the cylinder as follows:
manner as to prevent the likelihood of (i) The word spun or plug must
causing puncture or damage to other be placed near the DOT specification
hazardous materials packages. This re- marking when an end closure in the
quirement applies to anything tempo- finished cylinder has been welded by
rarily or permanently attached to the the spinning process, or effected by
cylinder, such as metal skids. plugging.
(e) Safety devices. Pressure relief de- (ii) As prescribed in specification 3HT
vices and protection for valves, safety ( 178.44) or 3T ( 178.45), if applicable.
devices, and other connections, if ap- (3) Marking exceptions. A DOT 3E cyl-
plied, must be as required or author- inder is not required to be marked with
ized by the appropriate specification, an inspectors mark or a serial number.
and as required in 173.301 of this sub- (4) Unless otherwise specified in the
chapter. applicable specification, the markings
(f) Markings. Markings on a DOT on each cylinder must be stamped
Specification cylinder must conform to plainly and permanently on the shoul-
applicable requirements. der, top head, or neck.
(1) Each cylinder must be marked (5) The size of each marking must be
with the following information: at least 0.25 inch or as space permits.
(i) The DOT specification marking (6) Other markings are authorized
must appear first, followed imme- provided they are made in low stress
diately by the service pressure. For ex- areas other than the side wall and are
ample, DOT-3A1800. not of a size and depth that will create
(ii) The serial number must be placed harmful stress concentrations. Such
just below or immediately following marks may not conflict with any DOT
the DOT specification marking. required markings.
(iii) A symbol (letters) must be (g) Inspectors report. Each inspector
placed just below, immediately before shall prepare a report containing, at a
or following the serial number. Other minimum, the applicable information
variations in sequence of markings are listed in CGA Pamphlet C11 (IBR, see
authorized only when necessitated by a 171.7 of this subchapter) or, until Oc-
lack of space. The symbol and numbers tober 1, 1997, in accordance with the ap-
must be those of the manufacturer. plicable test report requirements of
The symbol must be registered with this subchapter in effect on September
the Associate Administrator; duplica- 30, 1996. Any additional information or
tions are not authorized. markings that are required by the ap-
(iv) The inspectors official mark and plicable specification must be shown
date of test (such as 595 for May 1995) on the test report. The signature of the

828

VerDate Mar<15>2010 15:30 Dec 30, 2010 Jkt 220213 PO 00000 Frm 00838 Fmt 8010 Sfmt 8010 Q:\49\X49\220213.XXX ofr150 PsN: PC150

You might also like