OVERVIEW
Asian Chemicals & Engineering is pleased to submit this proposal for services to support International
Paint in successfully transfer of manufacturing license by providing equipment, and manufacturing license
regional Thailand. We will be providing full specification of all equipment and operating manual along with
any necessary technical support to operation
Production Capability
Asian Chemicals & Engineerings Polibrid 705 production facility can produce up to 2000 kgs per batch
process. The approximate time for making a batch is 3-4 hours
2
Main Equipment
No. Equipment Power Qty
1 Polibrid Mixer
1.2 Low Speed Agitator, 7.5 Hp, 380V 3Ph 50Hz 2.5 1
Equipment facilities
3
Technical/Project Approach
Asian Chemicals & Engineering will be providing all equipment and documentations along with the
remaining Polibrid 705 batches. The equipment, including platforms and supports, will be remove and
packed for transportation. The installation work after the equipment had been transported will be handle
by the client. Supervision support will be supply in required
Key project dates are outlined below. Dates are best-guess estimates and are subject to change until a
contract is executed.
Description Duration
PRICING
The following table details the pricing for delivery of the services outlined in this proposal. This pricing is
valid for 30 days from the date of this proposal:
Services Cost
Total
5