Professional Documents
Culture Documents
Chassis ID Path
2/Repair/B12R, D12D420/Engine assembly, install. Engine and gearbox as a unit
Model Identity
B12R 117358953
1
Install the engine.
2
Check that the front engine mounting is correctly seated on the cushions and tighten the bolts in the cushions
to the specified torque.
3
Carefully lower the engine to the height of the cushion. Install the rear cushions and tighten them to the
specified torque.
4
Install the rear member on the chassis and tighten it to the specified torque.
5
Use a hoist or a hydraulic jack to raise the vehicle.
1 / 31
IMPACT 3.0 Thursday, 20 September 2012
Remove the installation device from the engine, lower the vehicle and remove the lifting equipment.
2 / 31
IMPACT 3.0 Thursday, 20 September 2012
3 / 31
IMPACT 3.0 Thursday, 20 September 2012
4 / 31
IMPACT 3.0 Thursday, 20 September 2012
10
5 / 31
IMPACT 3.0 Thursday, 20 September 2012
11
12
6 / 31
IMPACT 3.0 Thursday, 20 September 2012
13
7 / 31
IMPACT 3.0 Thursday, 20 September 2012
14
8 / 31
IMPACT 3.0 Thursday, 20 September 2012
15
9 / 31
IMPACT 3.0 Thursday, 20 September 2012
16
10 / 31
IMPACT 3.0 Thursday, 20 September 2012
17
11 / 31
IMPACT 3.0 Thursday, 20 September 2012
18
12 / 31
IMPACT 3.0 Thursday, 20 September 2012
19
13 / 31
IMPACT 3.0 Thursday, 20 September 2012
20
21
22
14 / 31
IMPACT 3.0 Thursday, 20 September 2012
23
15 / 31
IMPACT 3.0 Thursday, 20 September 2012
24
25
16 / 31
IMPACT 3.0 Thursday, 20 September 2012
26
17 / 31
IMPACT 3.0 Thursday, 20 September 2012
27
18 / 31
IMPACT 3.0 Thursday, 20 September 2012
28
19 / 31
IMPACT 3.0 Thursday, 20 September 2012
29
20 / 31
IMPACT 3.0 Thursday, 20 September 2012
30
31
21 / 31
IMPACT 3.0 Thursday, 20 September 2012
32
33
Install the engine cable harnesses by connecting them to the main cable harness and attaching them to the
brackets with steel cable strips. In the area between the brackets, attach the cable harnesses with plastic cable
strips.
34
22 / 31
IMPACT 3.0 Thursday, 20 September 2012
35
23 / 31
IMPACT 3.0 Thursday, 20 September 2012
36
24 / 31
IMPACT 3.0 Thursday, 20 September 2012
37
25 / 31
IMPACT 3.0 Thursday, 20 September 2012
38
39
26 / 31
IMPACT 3.0 Thursday, 20 September 2012
40
27 / 31
IMPACT 3.0 Thursday, 20 September 2012
41
28 / 31
IMPACT 3.0 Thursday, 20 September 2012
42
43
29 / 31
IMPACT 3.0 Thursday, 20 September 2012
44
30 / 31
IMPACT 3.0 Thursday, 20 September 2012
45
Add coolant via the expansion tank.
46
Connect the negative battery cable.
47
Install the lower plates on the engine and the gearbox.
48
Close the internal covers on the engine and gearbox.
31 / 31