Professional Documents
Culture Documents
B. Test data
Temps Flowline Press en tte fill in start time and pressure readings every 10 minutes
(Heur)
(heur) (bar) (bar)
8:30 31.49 start pressure
8:45 43.66 final pressure after 17 hours
leak 94493 scf/h leak rate must be less than 900 scf/hour
rate
HH-1 0 sec. how many seconds to build full pressure on TRSSSV gauge
(in) ft
D1 13.375 1.110125
D2 9.625 0.798875
m ft
B-Ann_Leng 1526.47 5008.043
ft^3
B-Ann_Vol 2335.893
[m] [ft] [in] [ft^3/ft] [ft3] 2
3.28084 well depth depth tubing ID capacity volume
3
3
2
2
2
In Salah Gas
TRSSSV inflow test
A. Well Info
Well Number: Teg-18
Date: Friday, December 30, 2011
Objective: inflow test TRSSSV according to API 14H
B. Test data
Temps Flowline Press en tte fill in start time and pressure readings every 10 minutes
(Heur)
(heur) (bar) (bar)
8:30 20.21 start pressure
8:45 22.05 final pressure after 17 hours
leak 4983 scf/h leak rate must be less than 900 scf/hour
rate
HH-1 0 sec. how many seconds to build full pressure on TRSSSV gauge
(in) ft
D1 9.625 0.798875
D2 7 0.581
m ft
B-Ann_Leng 1017 3336.574
ft^3
B-Ann_Vol 787.4401