You are on page 1of 17

Compact switchgear assemblies

HYpact

Volker JANICH
02/11/2010

GRID
Agenda

1st topic Positionning chart Page 3

2nd topic Savings Page 4

3rd topic Application Page 8

4th topic Compact substation Page 12

AGK-CSC [HYpact solution] EN 06_2010- P 2


Positionning chart

AIS HYpact GIS

Space* Approx. 2,2 1,0 Approx. 0,3

Indoor design (sometimes uprgraded


Outdoor application Genuine outdoor design Genuine outdoor design
for outdoor application)

Enviromental conditions Switchgear contacts exposed to air All switchgear encapsulated Full encapsulation indoor application

Fast without manufacturers Lenghty requires manufacturers


Installation at site Lenghty puzzling on disconnectors
supervisor supervisor
Regulary especially for disconnectors
Maintenance frequency Long maintenance intervalls Long maintenance intervalls
and earthing switches
Easy access to component w/o Easy access to bays w/o complicated Lenghty shutdown plans for accessing
Maintenance work
complicated shutdown shutdown bays

Delivery time 4 to 6 months 4 to 6 months > 12 months

Initial product cost* Approx. 0,6 1,0 Approx. 2,0

Initial substation costs Approx. 0,9 1,0 Approx. 2,0

Life cycle cost* Approx. 1,5 1,0 Approx. 1,5

Compatibility with non-OEM


Due to AIS busbars Due to AIS busbars Due to GIS busbars
manufactured products

* Space and cost are estimated values only without consideration of land cost, and depend on substation requirements and local conditions

Best choice Good choice with minor restrictions Suitable, but major restrictions Worst choice for category stated

AGK-CSC [HYpact solution] EN 06_2010- P 3


Savings

Less space
Less material
Reduced labour
Short erection and
commissioning
High availibility

Neptune S/S, Richardsbay, South Africa

AGK-CSC [HYpact solution] EN 06_2010- P 4


Savings

Reduction in space > 50%

A = 11,3m 4m = 45,2m A = 5m 4m = 20,0 m


V = 11,3m 4m 5,2m = 235,0m V = 5m 4m 4,4m = 88,0 m

AGK-CSC [HYpact solution] EN 06_2010- P 5


Savings

Reduction in material and labour


AIS - linebay HYpact
12 x foundation 2 or 5 x foundation
3 x VT 3 x VT (not necessary by using SF6-VTs)
2 x Isolator 2 x Hypact
3 x CT
2 x Ciruit breaker
2 x isolator
4 x HV-connection / phase 0 or 1 x HV-connection / phase
VT isolator VT HYpact (not necessary by using SF6-VTs)
isolator CT
CT circuit breaker
Circuit breaker isolator
Cabling for 4 interface points Cabling for 1 interface points
2 x isolator drive Central cubicle HYpact
1 x earth switch drive
1 x circuit breaker

AGK-CSC [HYpact solution] EN 06_2010- P 6


Savings

Fast availibility
2 ALSTOM service or trained personell
Day 1
Unloading
Unpacking
Erection und adjustment
Day 2
Top up gas to service pressure
Commissioning tests
Handing over

AGK-CSC [HYpact solution] EN 06_2010- P 7


Application

HYpact for transformer bays


CTs on each side or on
both sides
Cable boxes possible
Direct earthing possible

AGK-CSC [HYpact solution] EN 06_2010- P 8


Application

HYpact for line and coupling bays


CTs on either or both sides
Cable boxes + VTs possible
Direct earthing possible)

AGK-CSC [HYpact solution] EN 06_2010- P 9


Application

HYpact for double busbar/H-scheme


CTs on either or both sides
Cable boxes + VTs possible
Direct earthing possible
Bus transfer contacts
available (IEC 62271-102 annex B, 1600A / 100v)

AGK-CSC [HYpact solution] EN 06_2010- P 10


Application

HYpact for Y-scheme


CTs on either or both sides
Cable boxes + VTs possible
Direct earthing possible
Bus transfer contacts
available (IEC 62271-102 annex B, 1600A / 100v)

AGK-CSC [HYpact solution] EN 06_2010- P 11


Compact substation

Line
Double busbar
application with
two circuit
breakers and 6

Busbar 2
disconnectors
= 2 x HYpact

4510

Busbar 1
3613

Transformer

AGK-CSC [HYpact solution] EN 06_2010- P 12


Compact substation

Line Line H-scheme with


two circuit
breakers and six
disconnectors
= 2 x HYpact

4510
3613

Transformer Transformer

AGK-CSC [HYpact solution] EN 06_2010- P 13


Compact substation

Line Line
H-scheme with 4
circuit breakers and
8 disconnectors
= 4 x HYpact + 2
conventional
disconnectors

2655
3613

Transformer Transformer

AGK-CSC [HYpact solution] EN 06_2010- P 14


Compact substation

Line Line
H-scheme with 5
circuit breakers and
8 disconnectors
= 5 x HYpact

2655
3613

Transformer Transformer

AGK-CSC [HYpact solution] EN 06_2010- P 15


References

Sales

1 10

10 20

> 20

Total 137

AGK-CSC [HYpact solution] EN 06_2010- P 16


www.alstom.com

You might also like