You are on page 1of 19

Federacion de Cooperativas del Caribe FC de RL

Reporte de Mano de Obra

(805) MAR AZUL EDIFICACIONES

Fecha: 9/25/2013 BARRACUDA B


Cons: Tarjeta: Descripcin
Fte: 014 MANO DE OBRA BARRACUDA B
Total 101
Pda: 102 LOSA DE CIMENTACION (CON PRMEZCLADO)
0010 00-03-039 EXCAVACION EN CEPAS EN SECCIONES PEQUEAS HASTA 40X40 CM, EN M3
MATERIAL TIPO "B", CON PICO Y PALA. AFINES DE TALUDES Y FONDO. INC
MATERIAL, MANO DE OBRA, EQUIPO. HERRAMIENTA MENOR Y TODO LO
NECESARIO PARA SU CORRECTA EJECUCIN.

0020 00-03-045 DESALOJO DE MATERIAL PRODUCTO DE LA EXCAVACION CON CARRETILLA A LA 1A M3


ESTACION, INCLUYE CARGA CON PALA Y APILE MATERIAL, MANO DE OBRA, EQUIPO,
HERRAMIENTA MENOR Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIN.

0030 00-03-500 AFINE DE PLATAFORMA C/PINZON Y PALA EN ESPESOR PROMEDIO DE 5 CM. INC M2
MANO DE OBRA, EQUIPO. HERRAMIENTA MENOR Y TODO LO NECESARIO PARA SU
CORRECTA EJECUCIN.
0040 08-06-500 SUMINISTRO Y COLOCACIN DE MALLA ELECTROSOLDADA 6X6-4/4 EN 1ER NIVEL, M2
CONSIDERANDO DESPERDICIOS, CORTE, GANCHOS, TRASLAPES, AMARRES CON
ALAMBRE RECOCIDO. LIMPIEZA DE AREA DURANTE Y AL TERMINO DE LOS
TRABAJOS. INC MATERIAL, MANO DE OBRA, EQUIPO, HERRAMIENTA MENOR Y
TODO LO NECESARIO PARA SU CORRECTA EJECUCIN.

0050 08-06-000 SUMINISTRO, HABILITADO Y COLOCACIN DE ACERO DE 3/8", FY=4200 KG/CM2 EN KG


ESTRUCTURA, CONSIDERANDO DESPERDICIOS, GANCHOS, TRASLAPES, AMARRES
CON ALAMBRE RECOCIDO, LIMPIEZA DE AREA DURANTE Y AL TERMINO

0060 00-03-021 SUMINISTRO, HABILITADO Y ANCLAJE DE CASTILLO AHOGADO DE 80 CM DE PZA


LONGITUD CON 1 VARILLA DE 3/8", F'Y=4200 KG/CM2 EN CADENA DE CIMENTACIN,
CONSIDERANDO DESPERDICIOS, GANCHOS, TRASLAPES, AMARRES CON ALAMBRE
RECOCIDO, LIMPIEZA DE AREA DURANTE Y AL TERMINO DE LOS TRABAJOS. INC
MATERIAL, MANO DE OBRA, EQUIPO, HERRAMIENTA MENOR Y TODO LO
NECESARIO PARA SU CORRECTA EJECUCIN.

0070 00-03-075 SUMINISTRO, HABILITADO Y ANCLAJE DE CASTILLO ARMEX 15X15-4 EN CADENA PZA
DE CIMENTACION CONSIDERANDO 40 CM. DE LONGITUD, DESPERDICIOS,
GANCHOS, TRASLAPES, AMARRES CON ALAMBRE RECOCIDO, LIMPIEZA DURANTE
Y AL TERMINO DE LOS TRABAJOS. INC MATERIAL, MANO DE OBRA, EQUIPO,
HERRAMIENTA MENOR Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIN.
0080 00-03-078 SUMINISTRO, HABILITADO Y ANCLAJE DE CASTILLO C/6 VARILLAS DE 3/8", F'Y=4200 PZA
KG/CM2 EN CADENA DE CIMENTACION, CONSIDERANDO 60 CM. DE LONGITUD,
DESPEDICIOS, GANCHOS, TRASLAPES, AMRRES CON ALAMBRE RECOCIDO,
LIMPIEZA DURANTE Y AL TERMINO DE LOS TRABAJOS. INC MATERIAL, MANO DE
OBRA, EQUIPO, HERRAMIENTA MENOR Y TODO LO NECESARIO PARA SU CORRECTA
EJECUCIN.

0090 00-03-502 SUMINISTRO Y COLOCACIN DE CADENA DE CIMENTACION DE 15X20 CM. ML


REFORZADA CON ARMEX 15X20-4 CONSIDERANDO GANCHOS, TRASLAPES Y
AMARRES CON ALAMBRE RECOCIDO, CIMBRA Y DESCIMBRA CONSIDERANDO
SEPARADORES, TROQUETES, ALINEACIN, INC LIMPIEZA DURANTE Y AL TERMINO
DE LOS TRABAJOS, MATERIALES, MANO DE OBRA, EQUIPO, HERRAMIENTA, MENOR
Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIN.

0100 00-03-505 SUMINISTRO VACIADO, TENDIDO, REGLEADO Y VIBRADO DE CONCRETO M3


PREMEZCLADO FC=200 KG/CM2 TIRO DIRECTO, REVENIMIENTO 10 CMS,
AGREGADO MXIMO DE 3/4" EN CIMENTACION, CURADO CON CURACRETO O
SIMILAR ACARREO A 1RA ESTACIN, LIMPIEZA DE AREA DURANTE Y AL TERMINO DE
LOS TRABAJOS. INC MATERIALES, MANO DE OBRA, EQUIPO, HERRAMIENTA MENOR
Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIN.

0110 00-03-503 SUMINISTRO Y COLOCACIN DE CIMBRA Y DESCIMBRA EN FRONTERA DE LOSA DE ML


CIMENTACION EN PERALTE DE 12 CM CON MONTEN CONSIDERANDO
SEPARADORES, TROQUETES, ALINEACIN, LIMPIEZA DURANTE Y AL TERMINO DE
LOS TRABAJOS. INC. MATERIALES, MANO DE OBRA, EQUIPO, HERRAMIENTA MENOR
Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIN.

0120 00-03-036 SUMINISTRO Y APLICACIN DE IMPERMEABILIZACION DE CADENA DE ML


CIMENTACIONDE 15X15 CM. DE SECCION CON VAPORFLEX O SIMILAR CON UN
RENDIMIENTO APROXIMADO DE 1M2/LT, APLICADO CON BROCHA. INC MATERIALES,
MANO DE OBRA, EQUIPO, HERRAMIENTA MENOR Y TODO LO NECESARIO PARA SU
CORRECTA EJECUCIN.

0130 00-03-640 SUMINISTRO Y FORJADO DE DADO DE 40X40 CM Y 1.20 MT DE ALTURA REFORZADO PZA
CON 8 VRS LONGITUDINALES #3 Y ESTRIBOS #3 A CADA 15 CM DE F'Y=4200 KG/CM2,
CORTES, TRASLAPES, AMARRES CON ALAMBRE, CONCRETO HECHO EN OBRA DE
F'C=200 KG/CM2 REV 10CM, AGREGADO MAXUMO DE 3/4", VIBRADO , INCLUYE:
CIMBRA Y DESCIMBRA A 4 CARAS, TROUETES Y NIVELACIN. INC LIMPIEZA
DURANTE Y AL TERMINO DE LOS TRABAJOS, MATERIALES, MANO DE OBRA,
EQUIPO, HERRAMIENTA MENOR Y TODO LO NECESARIO PARA SU CORRECTA
EJECUCIN.
0160 00-03-644 SUMINISTRO, HABILITADO Y ANCLAJE DE CASTILLO C/4 VARILLAS DE 3/8" F'Y= 4200 PZA
KOG/CM2 EN CADENA DE CIMENTACION, INCLUYE: 60 CM DE LONGITUD. INC.
MATERIALES, MANO DE OBRA, EQUIPO, HERRAMIENTA MENOR Y TODO LO
NECESARIO PARA SU CORRECTA EJECUCIN.

0170 00-03-646 SUMINISTRO Y ELABORACIN DE ZAPATA CORRIDA DE 80X12 CM ARMADA CON 4 ML


VRS. DE 3/8" LONGITUDINAL Y REFUERZO TRANSVERSAL CON B1/2"@15 CM,
CADENA RIGIDIZANTE AHOGADA EN LA ZAPATA SECCION DE 15X20 CM REFUERZO
CON ARMEX 12X20-4, CONCRETO HEO F'C=200 KG/CM2, CIMBRA Y DESCIMBRA DE
FRONTERAS DE CADENA RIGIDIZANTE, INCLUYE: EXCAVACION Y RELLENO DE
CEPAS,ELABORACION DEL CONCRETO, VACIADO, TENDIDO Y NIVELADO, CORTES Y
AMARRES DE REFUERZO CON ALAMBRE RECOCIDO DEL #18 Y BLOQUEADURA DE 2
HILADAS DE BLOCK DE 12X20X40 CM HUECO. INC MATERIALES, MANO DE OBRA,
EQUIPO, HERRAMIENTA MENOR Y TODO LO NECESARIO PARA SU CORRECTA
EJECUCIN.

0180 00-03-648 SUMINISTRO Y ELABORACIN DE ZAPATA CORRIDA DE 100X15 CM ARMADA CON 5 ML


VRS. DE 3/8" LONGITUDINAL Y REFUERZO TRANSVERSAL CON B1/2"@15 CM,
CADENA RIGIDIZANTE AHOGADA EN LA ZAPATA SECCION DE 15X20 CM REFUERZO
CON ARMEX 12X20-4, CONCRETO HEO F'C=200 KG/CM2, CIMBRA Y DESCIMBRA DE
FRONTERAS DE CADENA RIGIDIZANTE, INCLUYE: EXCAVACION Y RELLENO DE
CEPAS,ELABORACION DEL CONCRETO, VACIADO, TENDIDO Y NIVELADO, CORTES Y
AMARRES DE REFUERZO CON ALAMBRE RECOCIDO DEL #18 Y BLOQUEADURA DE 2
HILADAS DOBLES DE BLOCK DE 12X20X40 CM HUECO. INC MATERIALES, MANO DE
OBRA, EQUIPO, HERRAMIENTA MENOR Y TODO LO NECESARIO PARA SU CORRECTA
EJECUCIN.

Total 102
Total 103
Total 104
Total 105
Total 106
Total 107
Total 108
Total 109
Total 110
Total 112
Total 113
Total 114
Total 115
Total 117
Total 118
Total 119
Total 120
Total 121
Total 129
Total 139
Total 140
Cooperativas del Caribe FC de RL
Reporte de Mano de Obra

(805) MAR AZUL EDIFICACIONES

Unidad: Cantidad PU IMPORTE acumulado anterior

PRELIMINARES $410.45

M3 6.66 $207.69 $1,383.22 6.66

M3 6.66 $45.49 $302.96 6.66

M2 87.89 $4.57 $401.66 87.89

M2 55.69 $5.52 $307.41 55.69

KG 74.09 $3.63 $268.95 74.09

PZA 3 $10.10 $30.30 3

PZA 24 $11.54 $276.96 24


PZA 2 $26.52 $53.04 2

ML 70.3 $14.00 $984.20 70.3

M3 7.87 $178.92 $1,408.10 7.87

ML 64.95 $4.43 $287.73 64.95

ML 64.95 $2.66 $172.77 64.95

PZA 2 $299.84 $599.68 2


PZA 4 $25.77 $103.08 4

ML 11.7 $286.05 $3,346.79 11.7

ML 3.5 $378.98 $1,326.43 3.5

LOSA DE CIMENTACION (CON PRMEZCLADO) $11,253.26


MUROS Y CASTILLOS 1ER NIVEL $10,891.80
CADENAS, TRABES Y LOSAS 1ER NIVEL $13,063.04
MUROS Y CASTILLOS 2DO NIVEL $14,247.29
CADENAS Y LOSAS 2DO NIVEL $11,144.41
APLANADOS Y BOQUILLAS INT. 1ER NIVEL $272.27
APLANADOS Y BOQUILLAS INT. 2DO NIVEL $325.98
APLANADOS EXTERIORES $1,168.87
VARIOS DE ALBAILERIA $1,891.45
FACHADA $11,314.46
ALBAILERIA DE AZOTEA 2DO NIVEL $9,870.71
PISOS Y LAMBRINES 1ER NIVEL $10,493.53
PISOS Y LAMBRINES 2DO NIVEL $11,377.29
BARDAS EN EXTERIORES $5,841.15
ACCESOS, PISOS EXTERIORES Y REGISTROS $4,373.87
ALBAILERIA PARA CISTERNA Y BOMBA $3,606.94
MURETE Y SEALIZACIN $983.10
LIMPIEZA GRUESAY NIVELACION EXTERIOR $3,468.18
LIMPIEZA FINA $2,179.70
DESCARGA DE MATERIALES (ALBAILERIA) $4,727.00
JARDINERIA $435.94

TOTAL MANO DE OBRA BARRACUDA B $266,270.93


lote 10

esta estimacion acumulado actual importe % estimado a la fecha % estimado % pendiente x


estimar
$0.00 0.000% $410.45 100% 0%

6.66 $0.00 $1,383.22

100% 0%

6.66 $0.00 $302.96

100% 0%

87.89 $0.00 $401.66


100% 0%

55.69 $0.00 $307.41

100% 0%

74.09 $0.00 $268.95

100% 0%

3 $0.00 $30.30

100% 0%

24 $0.00 $276.96

100% 0%
2 $0.00 $53.04

100% 0%

70.3 $0.00 $984.20

100% 0%

7.87 $0.00 $1,408.10

100% 0%

64.95 $0.00 $287.73

100% 0%

64.95 $0.00 $172.77

100% 0%

2 $0.00 $599.68

100% 0%
4 $0.00 $103.08

100% 0%

11.7 $0.00 $3,346.79

100% 0%

3.5 $0.00 $1,326.43

100% 0%

$0.00 0.000% $11,253.26 100% 0%


$0.00 0.000% $10,891.80 100% 0%
$0.00 0.000% $13,063.04 100% 0%
$0.00 0.000% $14,247.29 100% 0%
$0.00 0.000% $11,144.41 100% 0%
$0.00 0.000% $272.27 100% 0%
$0.00 0.000% $325.98 100% 0%
$0.00 0.000% $974.90 83% 17%
$0.00 0.000% $1,564.06 83% 17%
$0.00 0.000% $7,293.04 64% 36%
$0.00 0.000% $9,870.71 100% 0%
$0.00 0.000% $0.00 0% 100%
$0.00 0.000% $4,162.66 37% 63%
$0.00 0.000% $5,841.15 100% 0%
$0.00 0.000% $1,368.76 31% 69%
$0.00 0.000% $2,453.70 68% 32%
$0.00 0.000% $0.00 0% 100%
$0.00 0.000% $3,468.18 100% 0%
$0.00 0.000% $0.00 0% 100%
$0.00 0.000% $4,727.00 100% 0%
$0.00 0.000% $0.00 0% 100%

$0.00 0% $103,332.66 39% 61%


Federacion de Cooperativas del Caribe FC de RL
Reporte de Mano de Obra

(805) MAR AZUL EDIFICACIONES

Fecha: 9/25/2013 SALMON A


Cons: Tarjeta: Descripcin Unidad:
Fte: 004 MANO DE OBRA SALMON A
Pda: 101 PRELIMINARES
0010 00-01-500 TRAZO Y NIVELACION DE LA CONSTRUCCION, INCLUYE BANCO DE NIVEL Y M2
EJES DE REFERENCIAS SIN TOPOGRAFO EN 1ER NIVEL. INC MATERIAL, MANO DE
Total 101 PRELIMINARES
OBRA, EQUIPO, HERRAMIENTA MENOR Y TODO LO NECESARIO PARA SU CORRECTA
EJECUCIN. Total 102 LOSA DE CIMENTACION (CON
Total 103 PRMEZCLADO)
MUROS Y CASTILLOS 1ER NIVEL
Total 104 CADENAS, TRABES Y LOSAS 1ER NIVEL
Total 105 MUROS Y CASTILLOS 2DO NIVEL
Total 106 CADENAS Y LOSAS 2DO NIVEL
Total 107 APLANADOS Y BOQUILLAS INT. 1ER NIVEL
Total 108 APLANADOS Y BOQUILLAS INT. 2DO NIVEL
Total 109 APLANADOS EXTERIORES
Total 110 VARIOS DE ALBAILERIA
Total 111 ALBAILERIA DE AZOTEA 1ER NIVEL
Total 112 FACHADA
Total 113 ALBAILERIA DE AZOTEA 2DO NIVEL
Total 114 PISOS Y LAMBRINES 1ER NIVEL
Total 115 PISOS Y LAMBRINES 2DO NIVEL
Total 117 BARDAS EN EXTERIORES
Total 118 ACCESOS, PISOS EXTERIORES Y
Total 119 REGISTROS
ALBAILERIA PARA CISTERNA Y BOMBA
Total 120 MURETE Y SEALIZACIN
Total 121 LIMPIEZA GRUESAY NIVELACION
Total 129 EXTERIOR
LIMPIEZA FINA
Total 139 DESCARGA DE MATERIALES
Total 140 (ALBAILERIA)
JARDINERIA

TOTAL DE MANO DE OBRA SALMON A


lote 99

Cantidad PU IMPORTE acumulado esta estimacion acumulado actual importe % estimado a la fecha
anterior

95.29 $4.67 $445.00 95.29 95.29 $0.00 $445.00


$445.00 $0.00 0.000% $445.00
$8,538.41 $0.00 0.000% $8,538.41
$12,397.53 $0.00 0.000% $12,397.53
$15,096.97 $0.00 0.000% $15,096.97
$13,239.39 $0.00 0.000% $13,239.39
$8,250.94 $0.00 0.000% $8,250.94
$372.22 $0.00 0.000% $372.22
$418.47 $0.00 0.000% $418.47
$279.91 $0.00 0.000% $279.91
$2,571.22 $0.00 0.000% $2,243.83
$605.82 $0.00 0.000% $605.82
$4,041.86 $0.00 0.000% $3,833.70
$5,485.85 $0.00 0.000% $5,485.85
$9,727.98 $224.41 2.307% $7,677.67
$8,982.08 $0.00 0.000% $7,612.32
$4,222.40 $0.00 0.000% $4,222.40
$6,174.28 $1,198.44 19.410% $4,395.70
$3,606.94 $0.00 0.000% $3,597.06
$983.10 $0.00 0.000% $0.00
$3,468.18 $0.00 0.000% $1,799.94
$1,961.73 $0.00 0.000% $0.00
$4,727.00 $0.00 0.000% $4,727.00
$435.94 $0.00 0.000% $0.00

NO DE OBRA SALMON A $231,621.44 $1,422.85 1% $105,240.12


% estimado % pendiente x
estimar

100% 0%
100% 0%
100% 0%
100% 0%
100% 0%
100% 0%
100% 0%
100% 0%
100% 0%
100% 0%
87% 13%
100% 0%
95% 5%
100% 0%
79% 21%
85% 15%
100% 0%
71% 29%
100% 0%
0% 100%
52% 48%
0% 100%
100% 0%
0% 100%

45% 55%
CLAVE DESCRIPCION
PRELIMINARES
TRAZO Y NIVELACION DE TERRENO PARA
1.1 DESPLANTE DE VIVIENDA, CON APARATOS,
INCLUYE: MATERIALES PARA SEALAMIENTO.

EXCAVACION A MANO EN CIMENTACION, INCLUYE:


CEPAS Y EXCAVACION DE DRENAJE, MATERIAL
1.2
CLASE I ZONA "A" DE 0.00 A 2.00 MTS. DE
PROFUNDIDAD EN SECO Y BORDE DE CEPA.
UNIDAD P.U P.U P.U CANTIDAD IMPORTE

M2 $ 4.67 $ 4.80 $ 6.45 141.83 $ 662.32

M3 $ 46.90 0.00

$ 17,380.89
$ 17,509.65
$ 14,824.02
$ 12,869.96
$ 11,922.79
$ 13,246.05
$ 64,894.60
$152,647.96

$181,831.00
IMPORTE IMPORTE

$ 680.76 $ 914.77
CIMENTACIN
CONCEPTO UNIDAD CANTIDAD
TRAZO Y NIVELACIN M2 141.825