33V Circuit Breaker with junction boxes and with support Number 1
7
structure for bus section
Kasinthula Substation
1 x 5 MVA 33/11kV transformer: Relay/Control
Panel
Thyolo C Substation
1 x 5MVA 33/11kV transformer relay/control panel
2 Protection drawings for all circuits
Installation supervision
Commissioning
Mlangeni Substation
4 x 33kV feeder relay/control panels
3 Protection drawings for all circuits
Installation supervision
Commissioning
Customs Substation
1 x 15MVA, 33/11kV transformer: combined
5
protection/control panel
Protection drawings for all circuits
Limbe A Substation
1 x 33kV feeder: combined protection/control panel
6 Protection drawings for all circuits
Installation supervision
Commissioning
Nchalo Substation
1 x 12.5MVA 11/33 transformer: Combined
protection/control panel
Karonga Substation
1 x 5 MVA 66/11 transformer: Combined
protection/control panel
1 x 5 MVA 66/33kV transformer: Combined
protection/control panel
8
2 x 33kV feeder relay/control panels
Protection drawings for all circuits
Installation supervision
Commissioning
The specific conditions for the goods are attached and will form an integral part of any resulting
contract.
Delivery
Lot Description of Goods
Completion period Delivery Point/Site
Number or Related Service
(days/wks/mths)
Kasinthula Substation
Thyolo C Substation
Mlangeni Substation
Blantyre West Substation
4 Control and Protection Modernisation 24 Weeks
Customs Substation
Limbe A Substation
Nchalo Substation
Karonga Substation
a b C
1 All Goods are to be manufactured to the same
specification as those supplied previously to
ESCOM. The Supplier is to make sure of these
specifications and is to state here where they do not
conform to the previous specifications.
The detailed technical evaluation will examine the technical specification of the items offered in
column c and determine or verify whether this meets the minimum specification required in column b.
Bidders must complete column c or the bid will be rejected. Bidders are required to include
technical literature to support the details provided in column c.