1. List of Goods and Delivery Schedule


Line Description of Goods Qty Physical Final Destination Delivery (as per Incoterms) Date
Item unit (Project Site) as
Delivery Date Bidders offered
N specified in BDS
Delivery date [to
be provided by the
bidder]

Three consignments spaced 10


EITHER weeks apart with the 1st
Meter Box for DAT Port Louis consignment of 7000 units to be
1 Electronic Single Phase 20,000 Unit Harbour Mauritius delivered within 12 weeks from
kWh Meter if product is from Letter of Acceptance. 2nd
abroad otherwise to consignment of 6500 units to be
CEBs Main Store, delivered within 22 weeks from
Roche Bois if the date of issue of Letter of
manufactured Acceptance and 3rd consignment
locally of 6500 units within 32 weeks as
from the date of issue of Letter of
Acceptance.
Name of Bidder _____________________________________Signature of Bidder ___________________________________

Date:_____________________