You are on page 1of 2

PROJECT- BAJAJ ECO TEC PRODUCTS LTD

GUTTER DESIGN CALCULATIONS

(run)
ROOF'S RAINWATER RUN-OFF W L

ROOF CATCHMENT AREA ( A ) = 12 x 8 m


= 96.00 m2

TAKING RAINFALL INTENSITY ( I ) = 150 mm/hr


= 4.16667E-005 m/s

ROOF RAINWATER DISCHARGE QR = Ax I


= 0.004 m3/s
DISCHARGE (Q) = 4.0 lts/sec

GUTTER'S DISCHARGE CAPACITY

TRY SIZE WIDTH 300 x DEPTH 250

WETTED PERIMETER P = 0.5 + 0.300 250


= 0.800 m 300

CROSS-SECTIONAL AREA A = 0.25 x 0.300


= 0.075 m2

HYDRAULIC RADIUS R = A/P


= 0.093 m

ROUGHNESS COEFFICIENT n = 0.01 (FOR GALVANISED STEEL)

TAKING GUTTER GRADIENT S = 1 : 1000


= 0.001

GUTTER DISCHARGE CAPACITY QR = 1/n * A * R(2/3) * S(1/2)


= 0.0486837 > 0.004 REQD QR [SAFE]

DOWNSPOUT AREA = 17662.5 mm2 DIA 150 mm size of pipe

GUTTER DEPTH 250 x WIDTH 300 IS SUFFICIENT. ADD 25mm FREEBOARD.

SIZE SELECTED = 275 x 300 mm.

DOWN SPOUTS SIZED @ 95mm2 PER SQM OF ROOF AREA = 9120 mm2
275
Downspout spacing as per Copper Development Association Formulae 300

Roof run governs:


DS = 19(a)(28/13)*(m)(16/13)*(33450/CWI)(10/13)
= 63.18 m
Downspout governs:
DS = 44 A/CWI
= 43.18 m
HEADER DESIGN CALCULATIONS
Q Q Q Q Q

L L L L

d d d d
HD1
1
HD2
HD3
2
3

HEADER (HD1)
ROOF CATCHMENT AREA ( A ) = 15 x 28 m
= 420.00 m2

Total Cross Section Area of Header = 39900 mm2


(SIZED @ 95mm2 PER SQM OF ROOF AREA)

Header Pipe Diameter = sqrt( Area x 4 / 3.14 )

= 225.45 mm
Provide a Header of Diameter 250 mm

HEADER (HD2)
ROOF CATCHMENT AREA ( A ) = 15 x 52 m
= 780.00 m2

Total Cross Section Area of Header = 74100 mm2


(SIZED @ 95mm2 PER SQM OF ROOF AREA)

Header Pipe Diameter = sqrt( Area x 4 / 3.14 )

= 307.23 mm
Provide a Header of Diameter 350 mm

HEADER (HD3)
ROOF CATCHMENT AREA ( A ) = 15 x 72 m
= 1080.00 m2

Total Cross Section Area of Header = 102600 mm2


(SIZED @ 95mm2 PER SQM OF ROOF AREA)

Header Pipe Diameter = sqrt( Area x 4 / 3.14 )

= 361.52 mm
Provide a Header of Diameter 450 mm

You might also like