Professional Documents
Culture Documents
Case Studies
Rainwater Harvesting Systems
PROJECTS
Contents
Benefits 03
Case Studies
THE GABBA, Queensland AUSTRALIA 04
Kuve Village, Ghana AFRICA 06
Redeemer Baptist School, NSW AUSTRALIA 08
School Project, Cheju City, Gyeong-gi KOREA 10
Hampton Primary School, Victoria AUSTRALIA 12
Naxos Island GREECE 14
Spring Hill Enviro-Cottage Project, Qld. AUSTRALIA 16
Reserve at Park 10, Houston, Texas U.S.A. 18
Raleigh Street , Cammeray, NSW AUSTRALIA 20
Aqualand, St. Charles, IL U.S.A. 24
Bondi Beach, NSW, AUSTRALIA 26
Manly Beach Front, North Steyne, NSW AUSTRALIA 28
CERES Harding St Market Garden, Vic. AUSTRALIA 30
Home Depot, Westbank, BC, CANADA 32
Lordco Auto Parts, Maple Ridge BC, CANADA 34
Product Guide 36
The tanks will not only capture the rainwater off the roof
of the grandstand but will help conserve and capture
the water from the watering of the oval. The Atlantis®
modular tank system to help the GABBA save water and
ensure water is recycled efficiently in an environmentally
friendly method while saving money on both materials and Installation ready for last layer of compacted
installation costs if they had used conventional methods backfill.
Prepared base of sand for level installation of Ecological sand treatment layer being prepared.
modules.
The Kuve village has a brand new school with a new metal
roof, which is perfect for capturing the abundant rain that
falls in this beautiful coastal country. The roof was found
in perfect condition but it had no gutters so was needed
to first create a gutter system using 6” PVC pipe that was were placed into the lowest portion of this excavation.
mounted at the base of the roof to capture the water. These units house the pumps and control switches for the
The water then flows down a series of pipes that travel system. The rest of the basin was filled with 240 modular
underground and make their way to the rainwater storage tank units, which are designed to create a structural void
basin located about 30’ from the end of the school. space that allows them to be filled with water. Once they’re
wrapped in the EPDM liner they can be completely buried
The team excavated an area of 22’ x 24’ and 4’ deep without crushing them under all of the stresses.
with a layer of sand spread across the entire bottom; this
Underground pipe is installed to carry water from the Two chambers are created. The first holds the initial roof run-
downspout to the rainwater storage basin. off and the second holds the sterilized water.
Installing the Atlantis® D-Raintank® (Matrix®) on top of the Pulling up the geotextile on all sides, taping it on top
Geotextile. then installing and
Backfilling the sides of the tank Backfilling the top of the tank
Completely wrapping the Atlantis® D-Raintank® (Matrix®) in Finally pulling up the impermeable liner on all sides and
Geotextile fabric and taping all the joints. taping it on top.
Welding the first layer of impermeable liner. The tank fully wrapped in the first layer of impermeable liner.
Backfilling the Atlantis® Matrix® (D-Raintank®) modules. Backfilling the sides of the tank.
Project Objectives:
It has traditionally been more important in North Sydney
Council to ensure the quick removal of stormwater than
to capture it or to necessarily ensure it is clean. In recent
years it has become apparent that what enters the
harbour directly affects its value as a tourist attraction and
Looking across Raleigh Street before permeable paving is
installed on threshold.
Looking across Raleigh Street following installation.
Following installation of tank and liners, sand was used for fill.
Note the plumbing for drawing off water from the tank.
Difficulties Encountered: This project was a small part of a larger project (re-
This was the first of its type in North Sydney and the surfacing of an existing carpark). During construction
learning curve was quite steep for the team. Each it became apparent that even though it was a relatively
member needed to inform themselves of the ways to small portion, it was vital to the success of the stormwater
overcome difficulties – standard construction guidelines management on the site.
are difficult to find. The paving is not proving to be stable and has sunk by a
The retrofit had to be designed to fit into existing services, few millimetres within weeks of being laid. The design of
specifically between a gas main and a water main. As the profile may need to be modified.
underground services were discovered during demolition
and excavation, the design was modified through feedback
from the construction contractor.
Run off
Atlantis Infiltration
Atlantis Infiltration
0.020 0.25 1.4 0.8 300 16
0.018
1.2 0.7 14
0.016 0.20 250
0.6 12
0.044 mg/l
0.002 mg/l
0.014 1.0
200
0.012 0.15 0.5 10
0.8
0.003 mg/l
0.202 mg/l
0.020 mg/l
0.738 mg/l
0.010
1.28 mg/l
0.01 mg/l
0.4 150 8
278 mg/l
26 mg/l
0.6
2 mg/l
16 mg/l
0.008 0.10
0.3 6
0.006 0.4 100
0.2 4
0.004 0.05
0.2 50
0.002 0.1 2
0.000 0.00 0.0 0.0 0 0
3000 14 300
5
3900 cfu/100ml
400 12 400
2500 250
10 4
300 2000 200 300
8 3
544 mg/l
18.0 ug/l
1.0 ug/l
1500 150
6.98 pH
200 6 200
6 mg/l
7.0 pH
6.6 pH
2
0.091
397.1
1000 100
0.05
4
560
100 100 1
500 2 50
0 0 0 0 0 0
Suspended
Solids
Faecal Coli-
forms
Total P.A.H
(Poly Aromatic
Total Phosphorus Total Oxidised Nitrogen pH
Hydrocarbons)
98.9% Removed 87.2% Removed 94.4% Removed 99.99% Removed 99.98% Removed
Legend
Runoff before Atlantis Filtration System
Pump Station
Infiltration Strip
The tank is big enough to hold water for 10-14 days worth
Current Contact:
Product Guide
Part Number: 80052 Part Number: 80030
52 mm 30 mm
480 mm 620 mm
Part Nr.:
70007
Part Nr.:
70006
Part Nr.:
70005
Flo-Tank ® Modules
ASSEMBLY: All units are assembled from 4 small Part Nr.:
plates and 4 large plates. These plates are clipped 70004
together to form the box structure.
Part Nr.:
70003
Note: Atlantis® products are manufactured from high quality recycled materials, carefully selected and under strict is accepted by Rebirth Pty Ltd, Atlantis Water Management, Atlantis Corporation Pty Ltd and its distributors and
quality control procedures. The strength could vary slightly due to raw material, country of manufacture, manufacturing agents world wide. Users should satisfy themselves as to the suitability of the product for their purpose.
process and external conditions. All trademarks are the property of Atlantis Water Management Australia.
All product designs, and specification are subject to change without further notice. All Atlantis® products are tested
Safety Factors: Engineers, designers and geotechnical engineers should design and calculate safety factors in approved NATA laboratories, and safe allowed tolerances should be practised in the actual field, to compensate
to a serviceable limited state to suit specific project. In case of doubt, consult your nearest distributor or Atlantis for any unforeseen situations, on site and on products.
representative.
All material contained within this brochure is subject to copyright, and belongs to Humberto E. Urriola and Christian
Disclaimer: All information provided in this publication is correct to the best knowledge of the company and is Urriola, Rebirth Pty Ltd Australia. No part of this brochure may be reproduced or transmitted in any form or by any
given out in good faith. This information is intended only as a general guide, no responsibility can be accepted for means, electronic, mechanical, photocopying, recording or otherwise, without prior written permission of Rebirth Pty
any errors, omissions or incorrect assumption. As each project is unique, and as Rebirth Pty Ltd, Atlantis Water Ltd. Australia, Atlantis Water Management, Atlantis Corporation Pty Ltd. Copyright @ 2009.
Management, Atlantis Corporation Pty Ltd and its distributors and agents world wide have no direct control over
the methods employed by the user in specifying, installing or supervising of its products hence no responsibility