PENDING JOB OF CPW

1. Water pipe line support and air pipe line not proper U-clamp fitting work in plant.
2. Air pipe line and water pipe line red oxide painting work balance.
3. Bag house header flexible pipe not proper erection.
4. Pre-heater air blaster air pipe line not proper erection.
5. Kiln girth guard not proper alignment.
6. Coal mill hot air duct structure support welding work balance
7. Coal mill coal conveying pipe line proper support work balance.
8. Kiln supporting roller water pipe line proper support work balance.
9. ESP Stair case structure welding work balance.
10. 1000BC3 Coal belt conv. venting lone erection work balance.
11. Pre-heater air blaster not proper working.
12. ESP Inlet duct support structure star bracing welding work balance.
13. Cooler hammer backer hood not proper standing work.
14. Cooler outlet duct rib welding work balance.
15. Kiln inlet seal wear ring gaping work not proper approach.
16. Coal mill inlet & outlet tunion bearing sealing work balance.
17. 1000BC4 coal belt conv. supporting structure welding work balance.
18. Coal crusher bag filter fan outlet expansion joint flange bolting not proper
fixing.
19. Coal crusher bag filter rotary air lock flange bolt missing.
20. 500DPC1 Support structure welding work balance.
21. 500DPC1 roof shed Welding work balance.
22. Coal mill bag filter fan duct support work balance.
23. Coal mill bag filter outlet duct support work balance.
24. Pre-heater down comer duct guide support painting work balance.
25. Coal mill double flap valve not proper welding.
26. Raw mill double flap valve not proper welding.
27. Shed structure base grouting are missing and there ribs not fully welded
(Additive crusher shed).
28. 1000BC2 drive not proper alignment.
29. At top of additive structure bracing & support plate, angle not fully welded.
30. Apron Conv. Discharge chute supporting angle not fully welded.
31. 100BC2 Shed bracing angle purling not welded top structure side work
balance.
32. Shed purling channel support structure welding balance.
33. 100BC2 bracing paint welding work balance.
34. 100BC2shed top end position rib is not welded.
35. 100BC3 discharge chute supporting rib not fully welded.
36. 100BC4 in BF2 T.T purling channel welding balance.
37. 100BC5 horizontal angle not welded.
38. 200BC2 Belt conveyor shed roof angle welding balance.
39. 100BC1 belt conveyor shed roof angle welding.
40. 100BC5 pipe discharge chute is not welded.
41. 200BF2 at ducting line discharge end at 200BC4 venting line suction point
support work balance.
42. 200BC3 top roof angle not welded.
43. 200BC3 belt conv. Joint damage.
44. 200BC4 side skirt guard frame near bending point hole is found balance.
45. 200BC4 shed towards tail drum top roof angle not proper welded.
46. Spillage belt conv. 100 sx 1 supporting frame shed channel are not proper
welded.
47. Spillage belt conv. 100 sx 1 stringer welding Snub pulley is not proper
welded.
48. 100BC8 floor plate beam supporting beam not proper welded.
49. 100BC7 discharge point area beam frame ends Are Missing. Anchor fastener
bolts at 2 position box channel welding balance.
50. 100BC7 discharge support beam channel frame.
51. 100BC7 tail drum stringer leg base frame grouting & welding missing.
52. 100BC1 beam frame platform above tail drum is not properly welded and not
support ground floor.
53. 100BC1 electrical panel not proper support.
54. 100BC7 shed roof support angle not proper welding.
55. Roof beam corner support structure not proper welded.
56. 100BC7 discharge chute bolts & welding balance.
57. 100BC6 truss roof center support bracing angle welding work balance.
58. 200BC4 belt conv. Bracing angle near two truss frame welding balance.
59. 200BC4 head drum shed roof vertical welding balance.
60. 200BC4 discharge supporting side snub pulley are not welded.
61. Reject belt head drum leg welding balance.
62. 600BC3 Platform gusset welding work balance.
63. 600BC2 rain cover shed canopy fixing balance.
64. 600BC3 rain cover truss painting work balance.
65. 700BC2 belt conv. Hand railing red oxide paint balance.
66. Bucket elevator 800BE1, 900BE1 drive platform welding scrap cutting and
hand railing work balance.
67. Scrap cutting in all column support 4 ducts balance.
68. Housekeeping at cement mill top floor, ground floor & fly ash bucket elevator
area.
69. All airline pipe clamp for support not fixed.
70. Clinker silo inside all reciprocating discharge chute spillage problem due to
over size.
71. All belt conv. Tail pulley return- Scraper damage belt joint due to heavy
weight.
72. All pipe line painting work balance.
73. Cement silo top housekeeping work balance.
74. Bag house chimney staircase erection work balance.
75. Raw mill hot air duct, cement mill and coal mill duct foreign material remove
work balance.
76. Belt conveyor structure red oxide painting work balance in plant.