INDL. TRAINING MONTHLY (EVALUATION SHEET) for the month _________________________________

Name of the Organisation _______________________________________________________________


Address _______________________________________________________________
Phone/Fax/Email ID: _______________________________________________________________
Student Details:
1. Name of the Student ____________________________ Branch ________________________
2. Institute Roll No. ____________________________ Univ. Roll No. ___________________
3. Training commenced upon _______________________________ till _______________________
4. Detail of the training undertaken during the month:
_________________________________________________________________________________________
_________________________________________________________________________________________
_________________________________________________________________________________________
5. Details of the Project Work allotted (if any)

Date: _____________________________ Signature of the Trainee

REPORT BY MANAGER TRAINING


(Please award marks out of 10 each)

1. Punctuality _____________ 2. Adherence of Instructions ________________


3. Team spirit _____________ 4. Ability to communicate ___________________
5. Conduct _____________ 6. Sincerity towards training _________________
7. Resourcefulness ____________ 8. Innovativeness _________________________
9. Uptake _____________ 10. Technical Approach _____________________
Overall Rating for the month _________________________ out of ______________________________
Evaluation of the project allotted during the period (if any) _____________________________________
(To be graded out of A-D; A: Excellent, B: Very Good, C: Good, D: Satisfactory)
Additional Remarks (if any) ___________________________________________________________

Authorised Signatory:
(With Stamp)

Date: ____________ Name: _______________________ Designation: ____________________

Note: This Evaluation sheet may please be forwarded (every month) to the Concerned HOD, SUSCET, TANGORI
MOHALI - 140306 on completion of the training.
SUSCET, TANGORI
Page 2 of 6

Attendance Sheet for the Trainee

1. Name of the Student _________________________________ Branch _________________________


2. College Roll No. ____________________________ University Roll No. ________________________
3. Name of the Firm/Organisation & Address ________________________________________________
__________________________________________________________________________________________
4. Training commenced on _____________________________ completed on __________________
Month
Trg. Sec/Dept.
Date 1
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
Sig. of Incharge
Sig. of Trainee

Authorised Signatory
With Stamp)

Seal Name_____________________ Designation ____________________


Page 3 of 6

Daily Diary To be submitted on the day of VIVA of Internal


Examination

DAILY DIARY FOR INDUSTRIAL TRAINING

Name of the student

Branch ..

Semester

University Roll No.

Company/Organizations Address

Training Commenced on

Training Completed on

Date of Submission

Project (s) allotted / Done

NOTE:
If the training is in more than one company, show the above
information again and affix a marker/flag to indicate the
same.

Synopsis/ Abstract To be submitted within 5-7 days of


completion of each months training
Page 4 of 6

MID SEMESTER REPORT- To be submitted within 8-10 days of completion of 3 months training

(When entire 6 months training is in one company/ organization)

MID SEMESTER REPORT

Name of company/Organization

Address

Name of Project allotted (if any)

Report Period of training is from To

Deptt/Branch/Section where training going on .

TRAINING MANAGER/ GUIDE SUBMITTED BY

Signature Name

Name Branch

Designation Univ. Roll No.

Department Date of Submission ......

Seal .
Page 5 of 6

FINAL REPORT- To be submitted on completion of 6 months training

(When entire 6 months training is in one company/ organization)

FINAL REPORT

Name of company/Organization

Address

Name of Project allotted (if any)

Report Period of training is from To

Deptt/Branch/Section where training going on .

TRAINING MANAGER/ GUIDE SUBMITTED BY

Signature Name

Name Branch

Designation Univ. Roll No.

Department Date of Submission ......

Seal .
Page 6 of 6

Final Project Report (Guidelines)


Title Cover
Certificate from organization about your stay (Project Duration) at that place and about
submission of work done under external guide at the place of training.
Certificate from your guide about the submission of work done under his/her guidance, Internal
Supervisor.
Table of Contents, abstract of the project (abstract of actual workdone).
A brief overview of the organization (regarding function area, location, division in which you are
working, turnover)
Profile of problems assigned.
Study of existing system, if any.
System requirements
o o Product Definition
Problem Statement
Function to be Provided
Processing Environment: H/W, S/W.
Solution Strategy
Acceptance Criteria
o o Feasibility Analysis
o o Project Plan
Team Structure
Development Schedule
Programming Languages And Development Tools
System Requirement Specifications
o o Developing / Operating / Maintenance Environments
o o External Interface And Data Flows
User display and report format, user command summary
High level DFD and data dictionary
o o Functional and performance specifications
Design
o o Detailed DFDs and structure diagrams
o o Data structures, database and file specifications
o o Pseudo Code
Test Plan
o o Functional, Performance, Stress tests etc.
Implementation / Conversion Plan
Project Legacy
o o Current status of project
o o Remaining areas of concern
o o Technical and managerial lessons learnt
o o Future recommendations
Bibliography
Source Code (if available)

Note: - The above is meant to serve as a guideline for preparation of your project report. You may
add to, modify or omit some of the above-mentioned points depending upon their relevance to your
project. You may also consult your internal supervisor for the same.