PTN 910 COMMISSION GUIDE

Huawei Technologies Co., Ltd. provides customers with comprehensive technical support and service. For
assistance, please contact our local office or company headquarters.

Huawei Technologies Co., Ltd.

Address: Huawei Industrial Base


Bantian, Longgang
Shenzhen 518129
Peoples Republic of China
Website: http://www.huawei.com
Email: support@huawei.com

Copyright Huawei Technologies Co., Ltd. 2012. All rights reserved.


No part of this document may be reproduced or transmitted in any form or by any means without prior
written consent of Huawei Technologies Co., Ltd.

Trademarks and Permissions

and other Huawei trademarks are trademarks of Huawei Technologies Co., Ltd.

All other trademarks and trade names mentioned in this document are the propert ies of their respective
holders.

Notice
Every effort has been made in the preparation of this document to ensure accuracy of the contents, but all
statements, information, and recommendations in this document do not constitute the warranty of any
kind, express or implied.

CONFIDENTIAL COPYRIGHT (2012) Page 2 of 13


PTN and BITS Commissioning Guide

1 PTN 910 status check

After powering up the PTN equipment, wait 3-5 minutes for the PTN to
start up completely. Then the engineer should check the status of PTN
indicators.

For PTN910:

There are 9 indicators on the PTN CXPH board.

The correct indicators status should be as shown below:

3
PTN and BITS Commissioning Guide

2 GE optical interface check

By default, the GE optical interfaces are enabled after the PTN is powered
up. The UGL engineer needs to check the output power of the GE optical
interfaces (OUT1 and OUT2). The GE optical interface is 1000BASE-

4
PTN and BITS Commissioning Guide

LX(10Km). Its mean launched optical power should be from -11 to -3 dBm.
The figures below shows the GE output interfaces to be tested.

CXPH unit for PTN910

5
PTN and BITS Commissioning Guide

3 Configure the PTN 910


Parameters

The NE IP and GE interface IP should be configured to enable the remote


communication and control of the PTN.

UGL engineer should be responsible for the IP address configuration.

Step 1: Configure the IP address on the PC


The UGL engineer should first configure the laptop IP address to be
129.9.0.1 (IP mask 255.255.0.0)

Then the Ethernet interface of the laptop should be connect to the


ETH/OAM interface of the PTN with cable.

Step 2: Check the U2000 LCT server status


Launch the U2000LCT System Monitor shortcut icon to start System
Monitor Client

In the Login dialog box, set the username and the password.

6
PTN and BITS Commissioning Guide

Check whether the U2000 LCT processes can be normally started. The
processes whose startup mode is manual must be started manually. If all
the processes can be normally started, the server runs normally

Step 3: Launch the U2000 LCT client


Open the U2000 LCT Client shortcut icon

7
PTN and BITS Commissioning Guide

Enter the username and the password, to open the U2000LCT.

8
PTN and BITS Commissioning Guide

Step 4: Find the PTN910 in the U2000 LCT

Click the Auto-Discovery icon on the bottom-right of the window

Select the row which has the 129.9.255.255 as the IP Address in the
pop-out window and click next

9
PTN and BITS Commissioning Guide

The system will find out the directly connected PTN-910. Select the entry
and click Create. Enter the username as root and password as
password to integrate the PTN into the U2000.

If the operation succussed, a new entry will be created under NE


information List as below.

Note: For most of time, if an action has been executed successfully, the
following window will be pop-out to indicate the operation is succussed,
click close to continue.

10
PTN and BITS Commissioning Guide

11
PTN and BITS Commissioning Guide

Step 4: Upload the PTN-910 configuration

Right-click the new-created 910 entry and click configuration;

In the new window, select the Upload radio button and click Next to
upload the configuration.

In the new pop-out window, click OK to continue.

The system will finish the uploading process after the progress reach
100%