DAILY INSPECTION REPORT

Location: Workshop Date: 16-11-2016


Sr. Rev. Inspector
Inspection Activity Project Tiltle Executioner Item Drawing # Client Findings
No. # (s)

Marking inspection of plates Pyramid Steel Almansoor ZKB JV


1 Structure MS-DR-001-30-32 3 Saeed Marking found ok
of main steel Shed Structure Engineering Fabcon

Fit up inspection of Rafter Flange Width of Rafter


Pyramid Steel ZKB JV
2 for Worker mess Ajmal Khan Structure GA-DR-002-07-31 2 Saeed (4/6) is 5mm less,Flange
Structure Fabcon
shed,2/6,4/6,5/6 plate is not Straight

Weding inspection of Top


Pyramid Steel ZKB JV
3 Plate of Column for Main Safdar Structure MS-DR-001-07-32 7 Saeed Welding found ok
Structure Fabcon
Shed

Marking inspection of plates Pyramid Steel ZKB JV


4 Ajmal Khan Structure GA-DR-002-12-31 2 Saeed Marking found ok
of Worker mess Shed Structure Fabcon

Weding inspection of
Pyramid Steel ZKB JV Welding thikness is less
5 Base Plate of Column for Ashraf Structure GA-DR-001-01-01 3 Saeed
Structure Fabcon as per drawing
Gentry Crane -1

Marking inspection of plates Pyramid Steel ZKB JV


6 Ashraf Structure MS-DR-001-30-32 3 Saeed Marking found ok
For Crane Beam Structure Fabcon
Fit up inspection of
Pyramid Steel Al Etihad ZKB JV Flange Plate is not
7 Columns of Main Structure MS-DR-001-09-32 1 Saeed
Structure Engineering Fabcon Straight
Shed,A2,3,4

Saeed Anwar

Prepared By Checked By
Doc. No: QA/QC
Rev.: 00
Date: 17-11-16
Page: 1 of 1

Action Taken Remarks

Go ahed _

Rectification
Hold not yet
completed

Go ahed _

Go ahed _

Rectification
Hold not yet
completed

Go ahed _
Rectification not
HOLD
yet completed

You might also like