Increasingly dense pipeline networks are
being built to ensure global energy supply. In-
novative installation methods by Herrenknecht
are paving the way for this through the under-
ground economically, quickly, and safely.
Herrenknecht tunnelling technology is custom-
ized and adapted to specic projects, for all
diameters and all ground conditions. We offer
our customers worldwide integrated technology
solutions and services in order to install pipe-
lines reliably. Exactly where they are needed.

08 Klaipda LNG Terminal, Lithuania


10 Narrows crossing Gladstone, Australia
12 River crossing in Texas, USA
14 Elbedker Hetlingen, Germany
16 Albysjn water pipeline, Sweden

Cover photo:
Crossing with a length To ensure the global
of 1,705 m: Installation supply of oil and gas
of a pipeline with HDD (here from Abu Dhabi),
technology from Herren- the pipeline network is
knecht beneath the Amu becoming increasingly
Darya river, Turkmenistan. denser.
HERRENKNECHT Pipeline Facts 45

Around Pipelining

380

m
km
m

0k
m

k
0m

5k

20

20
10

15
HDD Top technology and expertise
SDD

Direct Pipe method


Pipe jacking / segmental lining
worldwide ensure progress
Pipe Express method
Innovative installation technology from Herrenknecht
kilometers of pipelines and casings are installed using Herrenknecht installation technology each year. has helped to extend pipeline networks across the
world, exactly where they are needed. Around 380
kilometers of pipelines and casings are installed annu-
ally using Herrenknecht pipeline installation techno-
logy. Unique methods such as Direct Pipe and Pipe
Express are brilliant examples of our technological
leadership, because these methods make it possible
m

to install pipelines underground even faster and more


5

cost-efciently. This ensures top performances in the


74
ng

trenchless installation of pipelines, which means high-


si
os
Cr

Rio Grande
quality and safely-installed pipelines providing maxi-
Direct Pipe method
m mum protection for the people and the environment.
ng 2
8
5

As the worlds leading provider, Herrenknecht


1,
si

stands for:
os
Cr

Elbe
vast experience and expertise
m

Pipe jacking
top technology of the highest quality
ng 0
5

fully-customized, innovative solutions


os ,7
1

m
smooth progress and expert troubleshooting
si
Cr

comprehensive service on- and off-site

90
Amu Darya
HDD close teamwork with all project partners

,5
maximum reliability from start to nish

2
ng
Pipeline, utility, hydropower, metro, railway, road,
si
os
Cr
mining, and exploration: Herrenknechts references
Crossing: 1,720 m include more than 3,100 completed projects around
the world. Our tunnelling technology helps to build
Crossing: 1,500 m
tunnels, pipelines, shafts, and production wells in all
Yangtze types of ground with diameters ranging from 0.10 to
Segmental lining 19 meters. Pioneering technology from Herrenknecht
m
0

is creating the infrastructure to take people forward,


02

paving the way for progress.


1,
ng
si
os
Cr

Suez Canal
m

HDD
0
ng 0
o s ,3
1
si
Cr

Amazon
m

HDD
0
0
,4
ng
2
si
os
Cr

Godavari
Pipe jacking
HERRENKNECHT Pipeline Jobsite Solutions 67

Pipelining
All Around jobsite solutions

Worldwide, oil, gas and other resources are transport-


ed to the consumers via pipelines which are hundreds
of kilometers long. Obstacles such as rivers, moun-
tains, roads, and residential areas, difcult terrain and
nature protection zones have to be crossed under-
ground when installing the overall network. With
innovative methods and technologies, Herrenknecht
offers ideal solutions for different ground conditions,
wherever pipelines need to be installed underground.
This means pipeline routes can be built exactly where
they are needed in a cost-effective, fast, safe, and
reliable manner. In addition to a comprehensive
product portfolio and additional equipment such as
separation plants, we also offer a range of services,
providing for high tunnelling performance and maxi-
mum safety.

SEPARATION PLANT

Slurry-supported separation
Efcient and sequential processes separate and
remove the excavated soil from the bentonite
suspension a mixture of water and thixotropic
clay. The cleaned suspension is then transferred
back to the slurry circuit.
AVN MACHINE (DIRECT PIPE METHOD)

Pipeline HDD RIG


The AVN Machine connected on top of the pre-
Rig side
fabricated pipeline excavates the soil using the
Horizontal Directional Drilling Rigs from Herren-
Direct Pipe method while simultaneously
knecht are a cost-effective, fast, and ecological
installing the pipeline in one single work step.
option for installing pipelines through different
This saves costs and time.
ground conditions crossing beneath obstacles
such as rivers.

PIPE THRUSTER (DIRECT PIPE METHOD)

Launch shaft
The Pipe Thruster transfers the necessary thrust
force to the AVN Machine through the pipeline.
Using the Direct Pipe method, it brings the
prefabricated pipe string to the other bank even You can nd more detailed information about Herrenknecht
beneath wide rivers. technology, additional equipment, and services in our pocket
guide: Tunnelling Product Portfolio.
HERRENKNECHT Pipeline References 89

Klaipda LNG Terminal


Tough HDD challenge in gas pipeline
construction
With combined efforts over a long distance through ules for weight reduction. The abrasive geology of
extremely difcult geology: The connection of the sandy-gravelly soil and hard marl layers took its toll on
new LNG terminal at the Baltic port of Klaipda re- material and tooling wear. Herrenknechts After Sales
quired drilling boreholes for pipelines under the harbor Service ensured the supply of wear parts and deliv-
basin with a total length of 5.5 kilometers and at ered spare parts ad hoc to avoid downtimes. Thanks
depths of up to 56 meters. An island in the center of to the extensive rental pool, a Pipe Thruster was avail-
the harbor as the starting point allowed the boreholes able to the customer within only a few days as a
to be divided into four subsections. With a small ferry, standby for additional power during pipeline installa-
a HDD Modular Rig from Herrenknecht was trans- tion. Together as a team, all odds were overcome and
ported to the island, disassembled into three mod- the project was completed successfully.

PROJECT DATA MACHINE DATA PROJECT HIGHLIGHTS

Contractor: HDD Rig, HK400M, H-204 During the entire drilling process,
Albrehta Sp. z o.o. Pipeline diameter: 2 28", 8", 6" aHerrenknecht service technician
Max. pulling force: 400 t (4,000 kN) accompanied the construction
Pipeline length: team on site.
2 2,310 m, 610 m, 350 m Pipe Thruster, HK500PT, H-273
Max. thrust and pulling force: 500 t (5,000 kN) At customers request Herrenknecht
Geology: sand, gravel, cobbles, equipped the HDD Rig with an
marly till, boulders installed power of nearly 1,000 kW
and a torque of 140 kNm.

As a power reserve during pipeline


installation, Herrenknecht supplied
a Pipe Thruster HK500PT with
maximum thrust and pulling forces
of up to 500 t.

PROJECT BACKGROUND KLAIPDA, LITHUANIA

In order to make Lithuanias energy Additional power


sea
s ea g
ga
gate
ate
supply more diversied, the new reserve: Landside,
LNG terminal in Klaipda was con- aHerrenknecht Pipe
nected from the sea to the national Thruster supports
supply network. To this end, two pipeline installation
HDD boreholes (2,310 m and 610 m) Klaipda with a maximum
were drilled for the installation of thrust andpulling
a 28" gas pipeline. With two addition- force of upto 500 t.
al boreholes (2,310 m and 350 m), Baltic
B altic Sea
Sea
pipelines (6" and 8") were installed
LNG
L NG tterminal
erminal
for ber optic cables to control the
system.

port
port
po
HERRENKNECHT Pipeline References 10 11

I CANNOT SPEAK HIGHLY ENOUGH OF


Narrows crossing Gladstone THE TEAM AND WHAT THEY HAVE
ACHIEVED, PARTICULARLY IN
Safe and environmentally-friendly crossing THE LAST COUPLE OF MONTHS WHEN
THE GEOTECHNICAL CONDITIONS
GOT VERY TOUGH.
under a strait Steve Wille, General Manager Tunnelling, Thiess

For the crossing under the sensitive sea water strip subsidiary for the Gladstone project. With peak per-
The Narrows, between the Australian mainland and formances of up to 181 meters per week, the TBM
Curtis Island, special emphasis was placed on envi- dug ahead at an impressive pace. In the changeable,
ronmental protection. Under no circumstances were clayey soil the EPB technology proved to be the ideal
the marine life and the sensitive mangroves on solution and successfully reached the target shaft
the shores to be damaged. The contractor therefore on Curtis Island unnoticed by life on the surface. Im-
relied on trenchless tunnelling technology from mediately afterward, pipeline installation was done
Herrenknecht to drive a 4.3-kilometer protection with a Pipe Thruster from Herrenknecht a specially-
tunnel for a gas pipeline. The EPB Shield used had al- designed pipe brake held the pipeline in place each Maximum safety:
A custom-developed
ready mastered an earlier project in Australia and was time the clamping unit was relocated. As a result, the
pipe brake xes the
completely refurbished by the local Herrenknecht entire insertion was completed in just 14 days. heavy pipeline in place
when the clamping unit
of the Pipe Thruster
is relocated to pull the
PROJECT DATA MACHINE DATA PROJECT HIGHLIGHTS next stroke.

Contractor: EPB3400AH, M-1219M Along the tunnel alignment, the


Thiess Pty Ltd Diameter: 4,000 mm TBM installed a total of 21,750
Max. torque: 1,600 kNm segments and excavated about
Tunnel length: 4,300 m 55,000 m of earth.
Pipe Thruster, HK750PT, H-224
Geology: clay, sand, gravel Pipeline diameter: 48" Before the pipeline insertion, the
Max. thrust and pulling force: 750 t (7,500 kN) tunnel was ooded so the oating
pipe string could be installed with-
GROUP PARTNERS INVOLVED out additional measures.

VMT With the help of the Pipe Thruster,


Navigation the 48-inch gas pipeline with its
heavy concrete coating was success-
fully installed in just 14 days.

PROJECT BACKGROUND GLADSTONE, AUSTRALIA

The leading gas and energy provid-


ers in Australia worked together to Curtis Island
build the 430 km Santos Gas Trans-
mission Pipeline. It transports coal
seam gas from eastern Queensland
Graham
G raham C
Creek
reek
to a gas liquefaction plant on Curtis
Island. The 4.3 km tunnel under the
strait near Gladstone runs through Curtis Island
an ecologically highly sensitive area
and was therefore one of the most The
T he N
Narrows
arrows
challenging sections of the project. mainland east coast ttarget
arge
get sshaft
haftt

llaunch
aunch sshaft
haft
LNG plant

Gladstone
G ladstone
www.santosglng.com
HERRENKNECHT Pipeline References 12 13

WITH DIRECT PIPE WE WERE


River crossing in Texas ABLE TO COMPLY WITH THE STRICT
TOLERANCES OF THE ARMY
Quickly and safely with Direct Pipe CORPS OF ENGINEERS. IT IS A
FANTASTIC TECHNOLOGY.
over more than 1,000 meters Jwala Raj Sharma, Project Engineer, Laney Directional Drilling

When the strictest safety requirements apply, suc- 1,000 meters. They crossed safely under both the
cessful completion is all the more important. Crossing river and the levees protecting the region from ood-
beneath the Sabine-Neches Waterway near Port ing. Under no circumstances were these permitted to
Arthur (Texas, USA), the Direct Pipe method devel- be affected. Direct Pipe lays pipelines in a single
oped by Herrenknecht had to prove itself under the step by combining two technologies: Herrenknecht
watchful eyes of the US Army Corps of Engineers, microtunnelling machine plus Pipe Thruster. During
which monitors construction on waterways across excavation, the tunnel face can be controlled consis-
the nation. Within just 22 days, an AVN1000 and tently and safely using slurry-supported tunnelling
a Pipe Thruster HK750PT laid a 48-inch protective technology even in heterogeneous, water-permeable
pipe for a water line over a distance of more than soils.

PROJECT DATA MACHINE DATA PROJECT HIGHLIGHTS

Contractor: Direct Pipe method: In only 22 days, 1,050 m of


Laney Directional Drilling Co. AVN1000, M-1491M pipeline were laid with daily best
Diameter: 1,295 mm performances of up to 108 m.
Pipeline length: 1,050 m Max. torque: 150 kNm
The ood control levees were safely
Geology: sand, clay Pipe Thruster, HK750PT, H-186 crossed under and bridge foundations
Pipeline diameter: 48" bypassed with absolute precision.
Max. thrust and pulling force: 750 t (7,500 kN)
Direct Pipe easily handled ground-
GROUP PARTNERS INVOLVED water pressure of up to 4 bar.

VMT
Navigation

PROJECT BACKGROUND PORT ARTHUR, USA

In Cameron Parish on the border to Working with high


Louisiana, a gigantic plant has been safety requirements,
built for the production of liqueed a new water pipeline
natural gas. The new pipeline sup- was quickly laid with
plies the water for operation of the Direct Pipe .
Highway 82 Port Arthur
plant from Port Arthur, Texas. It cros- Sabine-Neches
ses under the Sabine-Neches Water- Waterway
way, one of the busiest waterways
in the USA.
launch shaft
Sabine Lake

Pleasure Island
MLK Bridge
target shaft
HERRENKNECHT Pipeline References 14 15

ON SUCH A CHALLENGING PROJECT,


Elbedker Hetlingen CONTINUOUS MUTUAL EXCHANGES
OF EXPERIENCE ARE SIMPLY ADVANTAGEOUS.
Elbe crossing with pipe jacking under COMPREHENSIVE SERVICE IS AS
IMPORTANT AS GOOD TECHNOLOGY.
high pressure Peter Dennig, Manager, A.Hak Drillcon

Not far from Hamburg tunnelling was carried out included a preventive videoscope examination of the
under high pressure: With an AVND Machine from main bearing as well as adaptation of the man lock
Herrenknecht the jobsite crew tackled a 1.5 kilometer and main bearing sealing for water pressures of up to
long Elbe crossing at depths of up to 40 meters. The 4 bar. This preparation paid off in the end: In efcient
project was one of the longest pipe-jacking jobs in three-shift operations, the TBM successfully ate its
the world and ran through diversified, complex way through to the target shaft on Lhesand Island in
ground with stones and larger boulders. Right from only 112 days of tunnelling. Modern technology com-
the start, the customer relied on expertise and sup- bined with all the project participants experience and
port from Herrenknecht. During the refurbishment of outstanding teamwork on site contributed to the proj-
the used AVND2400AB and project-specic modi- ects success skilled service personnel from Herren-
cation already, collaboration was hand in hand. This knecht were available to the customer at all times.

PROJECT DATA MACHINE DATA PROJECT HIGHLIGHTS

Contractor: AVND2400AB, M-1439M Top performance:


A.Hak Drillcon Diameter: 3,025 mm up to 40 m of tunnelling per day.
Max. torque: 1,600 kNm
Tunnel length: 1,528 m Maximum protection: the support-
GROUP PARTNERS INVOLVED ing pressure was constantly moni-
Geology: sandy gravel, stones, tored and compared in parallel with
boulders, partial layers of clay VMT the uctuating tide of the Elbe.
Navigation, monitoring, communication
Comprehensive support:
2 machine operators, 1 service
electrician, 1 service mechanic

PROJECT BACKGROUND HETLINGEN, GERMANY

In order to secure gas supply for On target for success:


Northern Germany and Scandina- Precise navigation and
via in the future too, the regional monitoring manage-
gas pipeline network is being mod- ment and optimal team-
ernized and extended. One part of work enabled a safe
the major project is the Elbedker Hetlingen
crossing under the Elbe
Hetlingen which crosses under with a uctuating tide
the Elbe near Hamburg. In the small and ambient pressure
llaunch
aunch sshaft
haft
ft
town of Hetlingen, a tunnel was Hamburg of up to 4 bar.
driven to the target shaft on Lhe-
sand Island on the Elbe using the Lhesand
L hesand
pipe jacking method and then two
new pipelines were installed. ttarget
arge
get sshaft
haft

Elbe
E lbe
be

Stade
S tade
HERRENKNECHT Pipeline References 16 17

Albysjn water pipeline


Superfast through groundwater with
innovative semi-trenchless method
Short work a few kilometers south of Stockholm: In Below it in the soil, a mounted boring machine digs
just 12 days, the jobsite team installed a 1,036meter the tunnel and lays the pipeline at the same time. The
long main water pipeline. Right beside a busy loosened soil is brought to the surface by the trench- On the right track:
highway, with a groundwater level just below the sur- ing unit and backlled in the trench again behind the Where space is tight
face. Installation in an open trench would have machine. The pushing force is provided by a Herren- and in water-bearing
ground, the semi-
required sheet piles and elaborate groundwater low- knecht Pipe Thruster located at the starting position.
trenchless Pipe
ering. With the semi-trenchless Pipe Express meth- In the most productive 12-hour shift, 221 meters of Express method is
od, neither was necessary, a huge time and budget pipeline were installed. The environment also bene- the right choice.
advantage for the contractor. In the new method, a ts: In comparison to the conventional construction Whilethe TBM pulls
buggy with a trenching unit creates a narrow, approxi- method the corridors, including construction paths, inthe pipeline under-
ground, trafc on
mately 40 centimeter wide trench on the surface. are up to 70 percent narrower.
thesurface remains
unaffected.

PROJECT DATA MACHINE DATA PROJECT HIGHLIGHTS

Contractor: Pipe Express method: With Pipe Express , in comparison


Zblin Scandinavia AB Pipe Express, M-1737M to the open-cut method, the corridor
Diameter: 1,350 mm can be reduced by up to 70 %.
Pipeline length: 1,036 m Max. torque: 140 kNm
Costly and time-consuming
Geology: water-saturated clay Pipe Thruster, HK500PT, H-273 groundwater lowering, earthworks
soil, sand, gravel Pipeline diameter: 48" or the ramming of sheet piles were
Max. thrust force: 500 t (5,000 kN) not necessary.

In recognition of the successful


project, the client was awarded
rstprize in the Trenchless No Dig
Award in Scandinavia.

PROJECT BACKGROUND HUDDINGE, SWEDEN

The 1.3 million residents of the


Swedish capital require around
Lake
L ak e A
Albysjn
lbysjn Stockholm
370,000 m of drinking water every
day. Zblin Scandinavia AB was Highway
H ighway 2
259
59
end
e nd p
position
osition
contracted to add one kilometer
of pipeline south of Stockholm to
the existing network.

Pipe Express was


sstarting
tarting position
position sponsored by:

Tullinge
HERRENKNECHT Pipeline Worldwide EUROPE 18 19
Nuuk, GL
Preston, UK
Le Havre, FR
Corbie, FR
Mongstad, NO

Pipelining Rotterdam, NL
Sliedrecht, NL
Lochem, NL

Herrenknecht tunnelling technology Sevenum, NL


Zevenaar, NL
Rysum, DE

at work around the world The Wadden Sea, DE


Hetlingen, DE ( p. 14)
Jemgum, DE
Ribnitz, DE
Huddinge, SE ( p. 16)
Norrtlje, SE
Mnnikk, FL
Ivanovo, RU
Ukhta, RU
Klaipda, LT ( p. 08)
Worms, DE
Wrocaw, PL
Pedescala, IT
Venice, IT
Bologna, IT
Saint-Jean-Cap-Ferrat, FR
Vladivostok, RU
Atyrau, KZ
Sochi, RU
Tblisi, GE
Asu, AZ
Livorno, IT
Istanbul, TR
Huelva, ES

MIDDLE EAST / AFRICA


Ismailia, EG
Al Jubail, SA
Abu Dhabi, AE
Antananarivo, MG

ASIA / OCEANIA
Shanghai, CN
Hangzhou, CN
Liaoning, CN
Zhuhai, CN
Hohhot, CN
Samarinda, ID
Rayong / Bangkok / Saraburi, TH
Kyaikhto, MM
Rajahmundry, IN
Anand, IN
Barrow Island, AU
Gladstone, AU ( p. 10)
Onslow, AU

AMERICA
Corning, US
A selection of pipeline projects.
Bonnyville, CA
Further Herrenknecht references
Santo Domingo, DO
can be found online:
Arcadia, US
Jacksonville, US
www.herrenknecht.com/references
Linhares, BR
Manaus, BR
Williston, US
Port Arthur, US ( p. 12)
Villahermosa, MX
MACHINE TYPES DIAMETER RANGE Rio Grande City, US
Santa Cruz de la Sierra, BO
AVN / AVND Pipe Thruster 6 16" 17 32" 33 56"
Camisea, PE

EPB Shield Direct Pipe method Pipeline length in kilometers: 0 1 2 3 4 5


HDD Rig Pipe Express method Pipeline lengths of more than 5 km
HERRENKNECHT
H ERRENKNECHT Pipeline
P ip e lin e Portfolio
P or t f o lio 20 21

Product Portfolio
Installation technology for all geologies
and all diameters
Herrenknecht is the only provider of a complete range conditions. When selecting the optimum machine
of pipeline installation technology in terms of both method, not only geological or hydrogeological condi-
diameters and geology. Each Herrenknecht machine tions of the ground play a role, but also other project
type is recommended for a specic range of ground parameters may be important.

HDD
H DD Rig
Rig Direct
D ire
ect Pi
P
Pipe
ip
pee Pipe Thruster
2m
0.1 m 0.8 m 1.5 m 0.2 m 1.5 m

8 90

SDD Rig Pipe Express AVN


AV
A N Machine
M ac hine
Mach
4.2m
0.4 m 0.9 m 1.5 m 0.4 m
0.1 m

A selection of tunnel-
ling technology.

EPB Shield Gripper TBM Double Shield TBM Further Herrenknecht


16 m 12.5 m 12.5m products can be
1.7 m 2m 2.8m
found online:
www.herrenknecht.
com/en/products

You can nd more


detailed information
about Herrenknecht
tunnelling technol-
ogy, additional equip-
Partial-face
P ar tial - fac e
ment, and services
Single
S ingle
e Sh
S
Shield
hie l d T
TBM
BM Multi-mode TBM Excavation Machine in our pocket guide:
14 m 19 m 12 m
1.5 m 2.4 m 2m Tunnelling Product
Portfolio.
HERRENKNECHT Pipeline Company

The Herrenknecht Group


Cutting-edge technology and an alliance of
specialists to make your project a success
Herrenknecht is a professionally positioned and inter- vertical shafts down to great depths, for example in
nationally oriented family enterprise. As global market mining for reaching new underground raw material
leader, we provide a comprehensive range of tunnel- deposits. We constantly align our geographical pres-
ling technology, additional equipment, and services. ence and our product and service portfolio to the
Herrenknechts innovative and customizable tunnel- needs of our customers and the market. We have a
ling technology can be used for all ground conditions network of more than 75 subsidiaries and associated
and diameters, and in all areas of application from companies available worldwide. The Herrenknecht
supply and disposal lines to large trafc tunnels. In Group employs around 5,000 people globally and is
addition, we offer innovative technical solutions preparing for the future with over 150 apprentices and
to successfully excavate inclined shafts and sink trainees.

H+E
LOGISTIK
Conveying Systems
www.helogistik.de Headquarters in
Schwanau: Shortly
after the company was
founded in 1977 by
Dr.-Ing. E. h. Martin
HERRENKNECHT Herrenknecht,
VMT FORMWORK Schwanau became
the companys head-
Navigation, Monitoring and Segment Production Systems quarters. To date, this
Process Data Management www.herrenknecht-formwork.com is the main location
www.vmt-gmbh.de accommodating
design, component
manufacturing and
assembly facilities.
MASCHINEN-
UND STAHLBAU TECHNI-MTAL
DRESDEN SYSTMES Active worldwide:
Subsidiaries and
Rolling Stock Systems Multi-service Vehicles representations on all
www.msd-dresden.com www.tms-company.com continents ensure that
Herrenknecht is always
close to its customers.
Herrenknecht has
around 15 manufac-
GLOBAL
turing and assembly
TUNNELLING BOHRTEC sites for tunnel boring
EXPERTS
machines and addi-
Jobsite Personnel Auger Boring Machines tional equipment
www.global-tunnelling-experts.com www.bohrtec.com worldwide, among
them assembly
factories in China
Group partners providing additional equipment and technical services ensure integrat- (2 Guangzhou,
ed solutions and top performance at jobsites where pipelines are installed. Chengdu) and India.
HERRENKNECHT Pipeline Experts 24 25

Experts
Smart installation methods
for moving energy safely
Is the era of fossil fuels really coming to an end? What do you think are the biggest challenges
According to the forecasts I know, the era of fossil when planning and installing a pipeline network
fuels will not come to an end in the foreseeable which is relatively independent of topographical
future. The question is rather: when will alternative and geographical issues?
energies be competitive enough to substitute fossil In former times, the biggest challenges in planning
energy to a greater extent? pipelines lay in the area of technical feasibility. Today,
these tend to be geopolitical factors, environmental
Where are the largest deposits of crude oil and aspects, acceptance by the population, and the pro-
natural gas apart from submarine deposits? curement of rights of way.
The largest onshore deposits of crude oil are in the
Middle East, Venezuela, Canada (including oil sand) What advantages does trenchless tunnelling
and Russia. The largest natural gas deposits are technology offer for the planning of new pipeline
located in Russia, Iran, Qatar, Turkmenistan, Saudi connections?
Arabia, and the USA (shale gas deposits). Trenchless tunnelling technology renders an impor-
tant contribution when crossing sensitive or built-up
A DENSE PIPELINE Where do you see bottlenecks and supply gaps areas. These technologies are often the only possibility
NETWORK GUARANTEES at the present time? How can long-term devel- to install certain limited route sections.
OUR ENERGY SUPPLY. opments in demand be identied?
Shortages and supply gaps occur in those regions How do you see the potentials of trenchless
where the infrastructure necessary for transporting tunnelling technology when planning, building,
Bernhard Lsser energy is lacking and where people cant afford ener- and using pipelines to transport crude oil and
gy supplies. To bridge such shortages, a supply infra- natural gas?
Managing partner of ILF Beratende Ingenieure GmbH, Munich
structure must be set up or developed further, which We expect that these technologies will increasingly
of course requires the corresponding nancial means. gain inuence when implementing pipeline projects.
Bernhard Lsser was born in Austria in 1969 He graduated The reasons are, on the one hand, increasing environ-
in civil engineering from Innsbruck University in 1997 What advantages does a dense pipeline network mental protection requirements and, on the other hand,
From 2006 to 2008, he obtained a Masters degree in Busi-
have and who benets from it globally? public acceptance and the fact that the surface is be-
ness Administration (MBA) from Deggendorf University
Since 1998, he has been working with ILF Beratende Inge- A sufciently dense pipeline network guarantees our coming increasingly built-up.
nieure GmbH at several locations and has gained experience energy supply. Otherwise, there is no guarantee of
holding a range of positions in several international pipeline economic development or a safe supply to the popu-
projects After some years working as a business unit lation. This means that not only individuals benet,
manager, Bernhard Lsser has been Managing Director of ILF
but also the whole of society. Pipelines represent
Beratende Ingenieure GmbH in Munich since 2012, also
directing the ILF branches abroad Bernhard Lsser is a infrastructure that is usually operated without aiming
lecturer in Pipeline Engineering at Leoben University. at maximizing prots. There are regulatory bodies in
many countries that pay attention to fair transport
tariffs and competition. As far as the oil and gas prices
are concerned, transport costs play a rather subordi-
nate role.

www.ilf.com
HERRENKNECHT Pipeline Trends

Trends
Worldwide development
of the pipeline network

The worldwide pipeline network is becoming increasingly dense, ensuring the worldwide
supply of oil and gas.

Europe Africa Middle East

159 75 151 Number of planned projects


39,000 26,000 36,000 Planned projects in km

North America Latin America Asia / Oceania

281 71 194
69,000 41,000 85,000

Worldwide
Future pipe-
line projects 931
according
296,000
to regions
in numbers
and km

The worldwide demand in oil and gas continues to increase.


Production quantities in million barrels per day (left) and trillion cubic feet per year (right):
186.8

173.5 Total OPEC countries


Total OECD countries
Total non-OPEC countries
Total non-OECD countries
125.6 Worldwide
115 116.8
109.4 111.1

86.6

70.2
63.7 66
61.2
56.7
51.8 48.9
45.7
41
34.9
Photo: Carel Kramer

Oil Gas
A 425 m-long and
10

35

40

10

35

40

45 slant drill con -


20

20
20

20
20

20

nects the gas pipeline


from the seabed to a
Source: Simdex Pipeline Projects Database 2013, International Energy Outlook 2013 Norwegian renery.
Pioneering Underground Technologies
Herrenknecht is the worlds leading premium supplier
for all-around technology solutions in mechanized
tunnelling. Working closely with our customers, we can
meet any challenges and together realize underground
infrastructure of all kinds. Successfully and in top quality.

www.herrenknecht.com

HERRENKNECHT AG
77963 Schwanau
Germany
Phone +49 7824 302-0
Fax +49 7824 3403
pr@herrenknecht.com
www.herrenknecht.com

You might also like